Text

.

l .. -

INDEX NUMBER SECTION OF PAGES Operating Data Report. . ... .... . . . . . . . . . . . , . .2 Average Daily Unit Power Level . . . . . . . . . . . . . . . .... . .I Refueling Information.. . ... . ..........1

{ . .. . .. . .. .. .

Monthly Operating Summary.. . . .. . . . . . . . ... .. ..............1 Summary of Changes, Tests, and Experiments.. .. .... . . . . . . . . .. . .4 i

1 J

l i

1 i

i t

9703260272 970314 PDR ADOCK 05000354 R PDR

DOCKET NO : 50-354 UNIT. Lione Creek DATE: 03/07/97 COMPLETED BY: R. Phillips TELEPHONE: (609) 339-2735 OPERATING DATA REPORT OPERATING STATUS I I

1. Reporting Period _Ecbruary 1997 Gross Hours in Report Period 672  ;
2. Currently Authorized Power Level (MWt) 3293 j Max. Depend. Capacity (MWe-Net) 1031 Design Electrical Rating (MWe-Net) 1067
3. Power Level to which restricted (if any) (MWe-Net) None

]

4. Reasons for restriction (if any)

This Month Yr To Date Cumulative

5. No. of hours reactor was critical 672.0 1416.0 75139.1
6. Reactor reserve shutdown hours 00 0.0 0.0
7. Hours generator on line 672 1416.0 73976.0
8. Unit reserve shutdown hours 0.0 0.0 0.0
9. Gross thermal energy generated (MWH) 2182731 4592880 236461127
10. Gross electrical energy generated (MWH) 740640 1561250 78455463
11. Net electrical energy generated (MWH) 712756 1501929 74973648
12. Reactor service factor 100.0 100.0 84.1
13. Reactor availability factor 100.0 100.0 84.1
14. Unit service factor 10 0.0 100.0 82.8
15. Unit availability factor 100.0 100.0 82.8
16. Unit capacity factor (using MDC) 102.9 102.9 81.4
17. Unit capacity factor (using Design MWe) 99.4 99.4 78.6
18. Unit forced outage rate 0.0 0.0 4.6
19. Shutdowns scheduled over next 6 months (type, date, & duration):
20. If shutdown at end of report period, estimated date of start-up:

'I DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 03/07/97 COMPLETED BY: B. Phillips TELEPHONE: (609) 339-2735 OPERATING DATA REPORT  ;

UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH FEBRUARY 1997  !

METHOD OF SHUITING  !

DOWN THE

{

TYPE REACTOR OR '

F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) (1) POWER (2) ACTION / COMMENTS n/a l

l l

i

.i ..

1 DOCKET NO.: 50-354

.: UNIT: Hope Creek DATE: 03/07/97

, COMPLETED BY: R. PhilliDS TELEPHONE: (609)339-2735 AVERAGE DAILY UNIT POWER LEVEL,

! MONTH FEBRUARY 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) '

1 1056 17 1067 2 1049 18 1064 3 1078 19 1073  !

'4 1053 20 1043 5 1061 21 1055

, 6 1065 22 1052 7 1070 23 1064 8 1064 24 1062

9 1066 25 1065 10 1068 26 1057 ,

i 11 1068 27 1068 j l 12 1067 28 1022 13 1088 29 N/A 14 1042 30 N/.A 15 1065 31 N/A 16 1065 l

l l

. _ _ . _ -. . . . .- .. .. - ~ . . .- . .. _ - _.

l DOCKET NO.: 50-354 ,

UNIT: Hope Creek  !

DATE: 03/07/97 COMPLETED BY: L. Keplev TELEPHONE: (609)339-1106 REFUELING INFORMATION  !

1 MONTli FEBRUARY 1997  ;

)

1. Refueling information has changed f om last month:

Yes __ No X

2. Scheduled date for next refueling (RF07): 9/6/97
3. Scheduled date for restart following refueling: 11/5/97 j 4A. Will Technical Specification changes or other license amendments be required?

Yes No X B. Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee (SORC)?  ;

Yes No X l If no, when is it scheduled? To Be Determined for Cycle 8 COLR

5. Scheduled date(s) for submitting proposed licensing action:

N_o1 required. i

6. Important licensing considerations associated with refueling:

N!A

7. Number ofFuel Assemblies:

A. Incore 764 B. In Spent Fuel Storage 141 2

8. Present licensed spent fuel storage capacity: 4006 Future spent fuel storage capacity: 4006

{

9. Date oflast refueling that can be dischary,ed 5/3/2006 to spent fuel pool assuming the present hcensed capacity: (EOCl3) i (Does allow for full-core off-load)

(Assumes 244 bundle reloads every 18 months until then)

(Does Eg1 allow for smaller reloads due to improved fuel) l

DOCKET NO.: 50-354 UNIT: Hooc Creek DATE: 03/07/97 4

COMPLE'ED BY: R. Phillips TELEPHONE: (609) 339-2735 MONTHLY OPERATING

SUMMARY

MONTH FEBRUARY 1997

. The Hope Creek Generating Station remained on-line for the entire month and operated at 100% power for the month of Febmary 1997. There was one load

.; reduction which is identified below, i e Power was reduced to 87% on February 1,1997, starting at 2057 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.826885e-4 months <br /> to perform '

monthly turbine valve testing. The unit was returned to 100% power on Febmary 2, i 1997, at 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br />. '

  • At the end of the month the unit had been on-line for 113 days. l l