DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 8/07/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1106 OPERATING DATA REPORT OPERATING STATUS l 1. Reporting Period July 1996 Gross Hours in Report Period 744 l

l 2. Currently Authorized Power Level (MWt) 3293 Max, Depend. Capacity (MWe-Net) M Design Electrical Rating (MWe-Net) 1067

3. Power Level to which restricted (if any) (MWe-Net) Nong l 4. Reasons for restriction (if any) l l

l This Month Yr To Date Cumulative

5. No. of hours reactor was critical 744.0 3249.2 70173.1
6. Reactor reserve shutdown hours kg 0.0 0.0
7. Hours generator on line 744 3091 4 69033.0
8. Unit reserve shutdown hours 0.0 0.0 0.0
9. Gross thermal energy generated (MWH) 2417604 9680632 220454882
10. Gross electrical energy generated (MWH) 799780 3231451 73057073 l 11. Net electrical energy generated (MWH) 770485 3074084 69791319
12. Reactor service factor 100.0 63.6 83.3
13. Reactor availability factor 100.0 63.6 83.3
14. Unit service factor 100.0 60.5 81.9 l 15. Unit availability factor 100.0 60.5 81.9 l
16. Unit capacity factor (using MDC) 100.4 58.3 80.3
17. Unit capacity factor (using Design MWe) 97.1 56.4 77.6
18. Unit forced outage rate 00 0.0 4.9
19. Shutdowns scheduled over next 6 months (type, date, & duration):
20. If shutdown at end of report period, estimated date of start-up:

9608270361 960815 DR ADOCK 050003 4

)

DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 8/07/96 COMPLETED BY; R. Harris TELEPHONE: (609)339-1106 OPERATING DATA REPORT UNIT SIIUTDOWNS AND POWER REDUCTIONS MONTil JUIN 1996 METHOD OF SHUTTING DOWN THE TYPE REACTOR OR F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) (1) POWER (2) ACTION / COMMENTS n/a

.- . . _ - . - ~.- - -- -. -

DOCKET NO.: 50-354

( .

UNIT: Hope Creek DATE: 8/07/96 i COMPLETED BY: R. Harris TELEPIlONE: (609) 339-1106 AVERAGE DAILY UNIT POWER LEVEL MONT11 JULY 1996 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1037 17 1062 2 1031 18 1008 3 1028 19 1040 l 4 1053 20 1056 i i

5 1040 21 1061 i 6 1033 22 1060 i

7 1015 23 .l_060 l

! 8 1033 24 1055 l

l 9 1036 25 1053 l

10 1026 26 1056 11 1040 27 1023 j i

q 12 1040 28 1047 j i 13 1035 29 1036 i 14 1016 30 1039 15 1024 31 936

, 16 1025 l

l J

i j

l

l.  :

i l _.

I I

DOCKET NO.: 50-354

. UNIT: Hope Creek DATE: 8/07/96 COMPLETED BY: L, Keolev TELEPHONE: (609) 339-1106 REFUELING INFORMATION MONTil JULY 1996

1. Refueling information has changed from last month:

Yes _ No X

2. Scheduled date for next refueling (RF07): 9/6/97
3. Scheduled date for restart following refueling: 11/5/97 4A. Will Technical Specification changes or other license amendments be required?

Yes - No X B. Ilas the Safety Evaluation covering the COLR been reviewed by the Station Operating -

Review Committee (SORC)?

Yes _

No X If no, when is it scheduled? To Be Determined for Cycle 8 COLR

5. Scheduled date(s) for submitting proposed licensing action:  ;

Not reauired.

6. Important licensing considerations associated with refueling: )

l N/A I I

! 7. Number of Fuel As emblies:

l A. Incore 764 i B. In Spent Fuel Storage 1472

8. Present licensed spent fuel storage capacity: 4006 Future spent fuel storage capacity: 4006
9. Date oflast refueling that can be discharged 5/3/2006 l to spent fuel pool assuming the present licensed capacity; (EOCl3)

(Does allow for full-core off-load)

- (Assumes 244 bundle reloads every 18 months until then)

(Does D91 allow for smaller reloads due to improved fuel) l l

I l .

l i

! DOCKET NO.: 50-354 l UNIT: Hope Creek l

\ DATE: 8/07/96 l COMPLETED BY: R. Harris l TELEPHONE: (609) 339-1106 l MONTIILY OPERATING

SUMMARY

MONTH JULY 1996 i e The Hope Creek Generating Station remained on-line for the entire month and operated at essentially 100% power for the month of July 1996 except one load reduction identified below.

. Power was reduced to 87% on July 7,1996 starting at 0301 hours0.00348 days <br />0.0836 hours <br />4.976852e-4 weeks <br />1.145305e-4 months <br /> to perform monthly turbine valve testing. The load reduction was extended 22 minutes due to the load dispatcher's minimum generation alert. The unit was returned to 100% power on July 7,1996 at 0640.

. At the end of the month the unit had been on-line for 129 days. i l