s INDEX NUMBER SECTION OF PAGES Operating Data Report................................

2 Average Daily Unit Power Level (June)................ 1 Refueling Information................................

1 Monthly Operating Summary............................

1 Corrected Average Daily Unit Power Level (May)....... 1 Summary.of Changes, Tests, and Experiments...........

5 l

9707220134 970715 PDR ADOCK 05000354 R

pg

q w

i -:

.6

=, <+

l

-DOCKET No.: 50-354' l

s.

UNIT:. Hope-Creek' L

4 DATE: 07/05/97 J

COMPLETED BY:

F.

Todd l

' TELEPHONE: >(609) 339-1316-

.j

)

OPERATING DATA REPORT

]

OPERATING STATUS:

.j l'

'. Report'ing _ lPe riod ' June.19 97

. Hours in Report 720 Period 2: cCurrently Authorized Power

.3293 LevelL (MWt)

~MaxLDependable Capacity.

'1031

~

(MWe-Net)=.

i

! Design Electrical-. Rating 1067 l

(MWe-Net) l 3

Power level to which restricted (if-

-None>

any) (MWe' Net) 4:

Reason For-Restriction ~-(if~

[

any);

This' Month Yr To' Date Cumulative.-

L

-)

1 5

'No.-of-hours reactor.was 720.

4343 78066 L

-critical' l

6..

Reactor reserve shutdown.

O '. 0 -

0.0 0.0 l-hours.

.7 Hours generator on line 720 4343

'769'03 r

8-tUnit reserve shutdown-hours 0.0 0.0 0.0 9

Gross l thermal ~ energy; 2307116 13977310

-245845557 1

10 --Gross' electrical: energy-756511

.4696891

-81591104..

generated' (MWH) g generated ' (MWH)'

11). Net electrical-energy.

724581 4511192 77990588 L

generated (MWH)

L.

L122. Reactor-' Service-factor 100.0%

l10 0. 0 % '

84.6%

K 113: Peactor availability factor :100.05 100.0%

8 4. 6%'-

14 Unit Service Factor

100.0%

100.0%

83.3%=

j

15 Unit Availability Factor 100.0%

100.0%-

83.3%

1

-4

16i / Unit Capacity Factor (MDC) 97.6%

100.7%

81.9%

1 Ls

17. Unit ~ Capacity Factor'(DER) 94.3%

9_7.4%

79.2%

~

['

18 ' Unit - Force'd cQutage ' Rate.

0.0%-

0.0%

4.2%

19. Shutdowns scheduled over..next 6 months ( type,.

E date, duration):

Refueling Outage, September 13, 1997, 152 Days.

20' :Iffshutdown' at end of report period, estimated date' of.Startup:

H i-a 4

..~..

. ~,

= DOCKET NO.: '50-354 UNIT: Hope Creek DATE: '07/05/97 TE HON 60 39-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS

-MONTH-JUNE 1997 t.

METHOD OF' SHUTTING DOWN THE TYPE REACTOR OR L

F= FORCED

' DURATION REASON REDUCING CORRECTIVE-l~

_NO.

DATE S= SCHEDULED (HOURS)

-(1)

POWER (2)

ACTION / COMMENTS i_

6/20/97 F

34 hrs.

HPCI M

MOV i

l-t.

f' i

l I

'I l

s l

l i

i 0

N:

?

  • N.

W DOCKET NO..

50-354 UNIT: Hope Creek DATE: 07/05/97 COMPLETED BY:

F.

Todd TELEPHONE:

(609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH JUNE 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 997 17 1039 2

1043 18 1033 3

1036 19 1031 4

1050 20 981 5

1047 21 543 6

1048 22 980 7

1051 23 1002 8

1049 24 1024 9

1026 25 992 10 1036 26 1004 11 1034 27 1013 l

12 1034 28 1019 13 1029 29 1014 i

i 14 1020 30 1012 15 988 31 N/A r

16 1043

M'

~

'~

1 L

' DOCKET NO.:.50-354 UNIT: Hope Creek 1

DATE:. 07/05/97 l

COMPLETED BY:

L. Fepley

. TELEPHONE:

(609) 339-1106 REFUELING ~INFORMATION-MONTH JUNE 1997 j

1.

xRefueling information has changed from last month:

.Yes X.

No

.i

.2.

Scheduled date for next. refueling (RF07) : 9/13/97 l

73.

Scheduled.date-for. restart following-refueling:

1

'11/3/97 W

.4A. Will Technical Specification changes or other license amendments be required?

Yes X

No B.

Hasithe
Safety ' Evaluation covering -the COLR been. reviewed by-

.the' Station 10perating Review Committee (SORC)?

Yes-No-

-X

.If: no, when-is it scheduled?

To Be Determined for Cycle 8 COLR 5.

Scheduled date (s) for' submitting proposed licensing' action:

1A License. Change Request will-be submitted to;the NRC on or.

.before1 July 30,.1997.

6.

'Important. licensing-considerations ~ associated with refueling:

The above required LCR' concerns'the Technical Specification-

' Safety Limit Minimum Critical. Power Ratio for Cycle 8.

7.

Number'of Fuel. Assemblies:

.A.

.Incore 764 LB.

InLSpent Fuel ~ Storage 1472

. 8.. ' Present licensed' spent. fuel storage capacity: 4006-

' Future. spent fuelLstorage capacity:

4006 9.

Date of lastDrefueling that can beidischarged. 5/3/2006 to spent fuel pool assuming the present. licensed capacity:

' (EOC13 )

['

1 (Does allow for full-core off-load)'

n

'(Assumes.244 bundle reloads every 18 months until then)

(Does'not allow for smaller reloads due to' improved fuel) i l

I

' "' u

=

..n.-

.. - ~...

?-

t DOCKET NO.: 50-334

. UNIT: Hope Creek DATE: 07/05/97 COMPLETED BY:

F.

Todd TELEPHONE:

(609) 339-1316 i:

MONTHLY OPERATING SUbMARY MONTH

' MR4E - 1997 l

  • 'The Hope. Creek Generating! Station started the month at 76% power' returning to 100%.after scram time testing. The j

. unit returned to 100%' power at 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> on June 1,1997.

j Hope Creek operated the' remainder.of the raonth at'100%'

1 power until. June 22, 1997, at which time'end:oficycle?

H coast down' began.'There were'three' load. reductions;which

.are. identified below.

  • : Power.was reduced to-83% on June.13,'1997,. starting 1at j

0201fhours due to a single rod scram. The' unit was.

returned to 100%. power on June 14',

1997,'at 0525fhours.

~

o. Power was reduced to-87% on JuneU14, 1997,. startingiat 0056' hours:for Control Valve Testing.:The: unit 1was

_ ' returned"to 100%~ power-on June 15,-1997, at11250. hours.

-* ~ Power was reduced to'40% on June ~20,J1997, starting at 1913~ hours for HPCI'MOV repairs. The unit wasJreturned tot 4 - t 100% power on June'22, 1997l at 0510Thours.- '

4 At the end.of the month, the unit wasJat 98% power e.nd l.

had been on-line for 235. days..

q u

l~

l l

l Ei l

i I

l
i I

k I

1

,,L a

q 4

1' 6

j

,FJ.

C'%

DOCKET NO.: 50-354

~

UNIT: HJo'e Creek DATE: '07[d3737 COMPLETED BY:

F.

Todd TELEPHONE: -T5b9) ~339-1316---

hlONTHLY OPERATING SUWARY MONTH JUNE 199'!

The Hope C';eek Generating Station started the month at 76% power returni.lg to 100% after scram time testing. The uni t returr.ed to 100% power at 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> on June 1,1997.

Hope Creek operated the remainder of the month at 100%

power until June 22, 1997, at which time end of cycle coast down began. There were three load reductions which are identified below.

Power was reduced to 83% on June 13, 1997, starting at 0201 hours0.00233 days <br />0.0558 hours <br />3.323413e-4 weeks <br />7.64805e-5 months <br /> due to a single rod scram. The unit was returned to 100% power on June 14, 1997, at 0525 hours0.00608 days <br />0.146 hours <br />8.680556e-4 weeks <br />1.997625e-4 months <br />.

Power was reduced to 87% on June 14, 1997, starting at 0056 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br /> for Control Valve Testing. The unit was returned to 100% power on June 15, 1997, at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br />.

Power was reduced to 40% on June 20, 1997, starting at 1913 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.278965e-4 months <br /> for HPCI MOV repairs. The unit was returned to 100% power on' June 22, 1997, at 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br />.

At the end of the month, the unit was at 98% power and had been on-line for 235 days.

..