. s INDEX NUMBER SECTION OF PAGES Operating Data Report................................ 2 Average Daily Unit Power Level (June) ................ 1 Refueling Information................................ 1 Monthly Operating Summary............................ 1 Corrected Average Daily Unit Power Level (May) ....... 1 Summary.of Changes, Tests, and Experiments........... 5 l

9707220134 970715 PDR R ADOCK 05000354 pg

q w

i -: ..

.6 ,

=, <+ ,

l l

-DOCKET No.: 50-354'

s. UNIT: . Hope-Creek' I L 4 DATE: 07/05/97 J COMPLETED BY: F. Todd l ' TELEPHONE: >(609) 339-1316- .j

)

OPERATING DATA REPORT ]

OPERATING STATUS: .j l' '. Report'ing _ lPe riod ' June .19 97

. Hours in Report 720 Period 2: cCurrently Authorized Power .3293 l LevelL (MWt) l

~MaxLDependable Capacity.

~

'1031 (MWe-Net)= . ,

. . i

! Design Electrical-. Rating 1067  !

l .. (MWe-Net) ,

l 3 Power level to which restricted (if- -None>

any) (MWe' Net) 4: Reason For-Restriction ~-(if~

any);

[

This' Month Yr To' Date Cumulative .-

L -)

1 5  :'No.-of-hours reactor.was 720. 4343 78066 L -critical' l 6.. Reactor reserve shutdown. O '. 0 - 0.0 0.0 l- hours.

.7 Hours generator on line 720 4343 '769'03 r 8- tUnit reserve shutdown-hours 0.0 0.0 0.0 9 Gross l thermal ~ energy; 2307116 13977310 -245845557 1 g generated' (MWH) .

-l 10 --Gross' electrical: energy- 756511 .4696891 -81591104..  !

generated ' (MWH)'

11) . Net electrical-energy. 724581 4511192 77990588 .!

L . .

generated (MWH)

L. L122 . Reactor-' Service-factor 100.0% l10 0. 0 % ' 84.6%

K 113: Peactor availability factor :100.05 100.0% 8 4 . 6%'- I 14 Unit Service Factor :100.0% 100.0% 83.3%= j

15 Unit Availability Factor 100.0% 100.0%- 83.3% 1

-4

16i / Unit Capacity Factor (MDC) 97.6% 100.7% 81.9% 1 Ls , 17. Unit ~ Capacity Factor'(DER)

~ '

94.3% 9_7.4% 79.2%

[' .

18 ' Unit - Force'd cQutage ' Rate . 0.0%- 0.0% 4.2%

19 . Shutdowns scheduled over..next 6 months ( type , .

E date, duration):

Refueling Outage, September 13, 1997, 152 Days. .

20' :Iffshutdown' at end of report period, estimated  !

. date' of.Startup: H i-a l

4 _ , . , _ _ . _ . __ .

- . . , . . . . . _ . . . ..~. . . . . . ~ , . .. . .

' = DOCKET NO.: '50-354

. UNIT: Hope Creek DATE: '07/05/97 TE HON 60 39-1316 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS

-MONTH- JUNE 1997 t.

METHOD OF' SHUTTING DOWN THE TYPE REACTOR OR L

F= FORCED ' DURATION REASON REDUCING CORRECTIVE-l~ _NO . DATE S= SCHEDULED (HOURS) -(1) POWER (2) ACTION / COMMENTS i_ 6/20/97 F 34 hrs. HPCI M MOV i  !

l-t.

f' i

l I 'I l

s l

l i

i 0

N:

?

  • N.

W

, DOCKET NO.. 50-354 UNIT: Hope Creek DATE: 07/05/97 COMPLETED BY: F. Todd TELEPHONE: (609) 339-1316 AVERAGE DAILY UNIT POWER LEVEL MONTH JUNE 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 997 17 1039 2 1043 18 1033 3 1036 19 1031 4 1050 20 981 5 1047 21 543 6 1048 22 980 7 1051 23 1002 8 1049 24 1024 9 1026 25 992 10 1036 26 1004 11 1034 27 1013 l

12 1034 28 1019 13 1029 29 1014 i

i 14 1020 30 1012 15 988 31 N/A r

16 1043

M' '. l

~

< '~

. 1 1

L  :,- ' DOCKET NO.: .50-354 UNIT: Hope Creek 1

DATE:. 07/05/97 l COMPLETED BY: L. Fepley

. TELEPHONE: (609) 339-1106 REFUELING ~INFORMATION-MONTH JUNE 1997 j

1. xRefueling information has changed from last month:

.Yes X. No

.i

.2. Scheduled date for next. refueling (RF07) : 9/13/97 l

73. Scheduled.date-for. restart following-refueling: 1

'11/3/97 W

.4A. Will Technical Specification changes or other license amendments be required?

Yes X No -

B. ;Hasithe: Safety ' Evaluation covering -the COLR been. reviewed by-

.the' Station 10perating Review Committee (SORC)?

Yes- No- -X  :

.If: no, when- is it scheduled? To Be Determined for Cycle 8 COLR

5. Scheduled date (s) for' submitting proposed licensing' action:
  • 1A License. Change Request will-be submitted to;the NRC on or.

.before1 July 30,.1997.

6. 'Important. licensing-considerations ~ associated with refueling:

The above required LCR' concerns'the Technical Specification-

' Safety Limit Minimum Critical. Power Ratio for Cycle 8.

7. Number'of Fuel. Assemblies:

.A. .Incore 764 LB. InLSpent Fuel ~ Storage -

1472

. 8.. ' Present licensed' spent. fuel storage capacity: 4006-

' Future. spent fuelLstorage capacity: 4006 ,

9. Date of lastDrefueling that can beidischarged. 5/3/2006 to spent fuel pool assuming the present. licensed capacity:

' (EOC13 )

['

1 (Does allow forn full-core off-load)'

'(Assumes.244 bundle reloads every 18 months until then)

(Does'not allow for smaller reloads due to' improved fuel) i l

I u -- -

. . .. ,. .- - -. = ,

. -. - . _ . - . ..n.- . . _.. .--. ... . . - _ - . . . _ . . . - ~ . . . .- . -

?-

. . t

. DOCKET NO.: 50-334

. UNIT: Hope Creek  !

DATE: 07/05/97 '

COMPLETED BY: F. Todd TELEPHONE: (609) 339-1316 i:

MONTHLY OPERATING SUbMARY .

1 MONTH ' MR4E - 1997 l

  • 'The Hope. Creek Generating! Station started the month at 76% power' returning to 100%.after scram time testing. The j

. unit returned to 100%' power at 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> on June 1,1997. j

  • Hope Creek operated the' remainder.of the raonth at'100%' -

1 power until. June 22, 1997, at which time'end:oficycle? H coast down' began.'There were'three' load. reductions;which

.are. identified below.

  • : Power.was reduced to-83% on June.13,'1997,. starting 1at '

j 0201fhours due to a single rod scram. The' unit was.

returned to 100%. power on June 14', 1997,'at 0525fhours.

~

o. Power was reduced to-87% on JuneU14, 1997,. startingiat 0056' hours:for Control Valve Testing.:The: unit 1was

_ ' returned"to 100%~ power-on June 15,-1997, at11250. hours.

-* ~ Power was reduced to'40% on June ~20,J1997, starting at 1913~ hours for HPCI'MOV repairs. The unit wasJreturned tot 4-t 100% power on June'22, 1997l at 0510Thours.- ' '

4

  • At the end.of the month, the unit wasJat 98% power e.nd
l. had been on-line for 235. days.. q u

l~

l l

l Ei l

i I

l -
i

-' I ,

k I

1

,,L a

- , q 4

1' 6 ,

j

,FJ.

- C'% _,. _

DOCKET NO.: 50-354~

UNIT: HJo'e Creek DATE: '07[d3737 COMPLETED BY: F. Todd TELEPHONE: -T5b9) ~339-1316---

hlONTHLY OPERATING SUWARY MONTH JUNE 199'!

  • The Hope C';eek Generating Station started the month at 76% power returni.lg to 100% after scram time testing. The uni t returr.ed to 100% power at 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> on June 1,1997.
  • Hope Creek operated the remainder of the month at 100%

power until June 22, 1997, at which time end of cycle coast down began. There were three load reductions which are identified below.

  • Power was reduced to 83% on June 13, 1997, starting at 0201 hours0.00233 days <br />0.0558 hours <br />3.323413e-4 weeks <br />7.64805e-5 months <br /> due to a single rod scram. The unit was returned to 100% power on June 14, 1997, at 0525 hours0.00608 days <br />0.146 hours <br />8.680556e-4 weeks <br />1.997625e-4 months <br />.
  • Power was reduced to 87% on June 14, 1997, starting at 0056 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br /> for Control Valve Testing. The unit was returned to 100% power on June 15, 1997, at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br />.
  • Power was reduced to 40% on June 20, 1997, starting at 1913 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.278965e-4 months <br /> for HPCI MOV repairs. The unit was returned to 100% power on' June 22, 1997, at 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br />.
  • At the end of the month, the unit was at 98% power and had been on-line for 235 days.

l

..