INDEX HlTABER SECTION OF PAGES "perating Data Report and Monthly operating Summary..
1 Summary of Changea, Testa, and Experimenta...........
6 9002240384 J21S PDR ADOCK 1000354 R
PDR.
md
l DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 02/06/97 COMPLETED BY:
R.
Ritzman TELEPHONE:
(609) 339-1445 Reporting Period: January 1998 OPERATING DATA REPORT f 1067 Design Electrical Rating (MWe-Net)
Maximum Dependnule Capacity (MWe Net) 1031
+: @
d-Month Year to date Cumulative No. of hours reactor was critical 744 744 81284.3 No. of hours generator was on line (service 744 744 79814 hours)
Unit reservo shutdown hours 0
0 0
Not Electrical Energy (MWH) 790940 790940 80671318 UNIT SHUTDOWNS
\\
N O.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE I
F= FORCED (HOURS)
(1)
SHUTTING ACTIONICOMMENT S= SCHEDULED DOWN THE REACTOR (2)
N/A (1) Reason (2) Method m
A Equipment Failure (Explain) 1 Manual B Maintenance er Test 2 Manual TriplScram C Refueling 3 Automatic Trip / Scram D Regulatory Restriction 4 Continuation E Operator Training / License Examination 5 Other (Explain)
F Aoministrative G Operational Error (Explain)
H Other Summary Of Monthly Operating Experience Hope Creek entered the month of January at approxim stely 100% reactor power.
Hope Creek operated throughout the month without experiencing any shutdowns or ma]or power reductions.
- At the end of the month, Hope Creek had completed its 49th consecutive day of continuous power operation.