ML20203B674

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1998 for Hope Creek Generation Station,Unit 1
ML20203B674
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/31/1998
From: Ritzman R
Public Service Enterprise Group
To:
Shared Package
ML20203B670 List:
References
NUDOCS 9802240384
Download: ML20203B674 (6)


Text

.

INDEX HlTABER SECTION OF PAGES "perating Data Report and Monthly operating Summary..

1 Summary of Changea, Testa, and Experimenta...........

6 9002240384 J21S PDR ADOCK 1000354 R

PDR.

md

l DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 02/06/97 COMPLETED BY:

R.

Ritzman TELEPHONE:

(609) 339-1445 Reporting Period: January 1998 OPERATING DATA REPORT f 1067 Design Electrical Rating (MWe-Net)

Maximum Dependnule Capacity (MWe Net) 1031

+: @

d-Month Year to date Cumulative No. of hours reactor was critical 744 744 81284.3 No. of hours generator was on line (service 744 744 79814 hours)

Unit reservo shutdown hours 0

0 0

Not Electrical Energy (MWH) 790940 790940 80671318 UNIT SHUTDOWNS

\\

N O.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE I

F= FORCED (HOURS)

(1)

SHUTTING ACTIONICOMMENT S= SCHEDULED DOWN THE REACTOR (2)

N/A (1) Reason (2) Method m

A Equipment Failure (Explain) 1 Manual B Maintenance er Test 2 Manual TriplScram C Refueling 3 Automatic Trip / Scram D Regulatory Restriction 4 Continuation E Operator Training / License Examination 5 Other (Explain)

F Aoministrative G Operational Error (Explain)

H Other Summary Of Monthly Operating Experience Hope Creek entered the month of January at approxim stely 100% reactor power.

Hope Creek operated throughout the month without experiencing any shutdowns or ma]or power reductions.

  • At the end of the month, Hope Creek had completed its 49th consecutive day of continuous power operation.