LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With
ML20153B127
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/31/1998
From: Bezilla M, Todd F
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N980439, NUDOCS 9809220335
Download: ML20153B127 (4)


Text

.- .- - .- . . . - - _ . _ - -

  • O PSEG I Publ,ic Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit SEP 141998 LR-N980439 U. S. Nuclear Regulatory Commission l Document Control Desk l Washington, DC 20555 Gentlemen:

1 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 in compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical i Specifications, the operating statistics for August 1998 are being forwarded. No changes, tests, and experiments were implemented during August 1998 that require a summary to be forwarded to you pursuant to the requirements of 10CFR50.59(b).

l Sincerely, Mark B. Bezilla N I General ManagS - l i

Hope Creek Operations RAR/mw Attachments gQ C Distribution 3..-]

9809220335'980831 PDR ADOCK 05000354 -

R PDR The purrisinyourlunds.

95@68 REV. 6bJ4 i

4 1

\

l INDEX '

.. j l NUMBER  !

SECTION - OF PAGES l Operating Data Repo rt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1

1 Monthly Operating S u mma ry......... ... . .. .. ............. .... ... ... . ..... . ... ... ... . ..... ...... 1 1 l

l 1

i  !

t l

I i

I l

I 1

['

I I

F I

i 1

1 ',

l l

l l <.

-g.

i DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 09/10/98 COMPLETED BY: F.Todd TELEPHONE: (609)339-1316 Reporting Period August 1998 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net) 1031  !

Month Year-to-date Cumulative i No. of hours reactor was critical 744 l 5831 l 86371 l l No. of hours generator was on line (service 744 5831 l 84901 hours) l Unit reserve shutdown hours 0 l0 l0 l Net Electrical Energy (MWH) 740734 l 6000982 l 85898134 l {

UNIT SHUTDOWNS 1 i

NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION /

F= FORCED (HOURS) (1) SHUTTING COMMENT S= SCHEDULED DOWN THE REACTOR (2) _

N/A (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - ManualTrip/ Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Athninistrative G - Operational Error (Explain)

H - Other

,  : o DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 09/10/98 COMPLETED BY: R. Ritzman TELEPHONE: (609) 339-1445 Summary Of Monthly Operating Experience

. Hope Creek entered the month of August at approximately 100% reactor power.

At the end of the month, Hope Creek had completed its 261st day of continuous pcwer operation.