Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217F150 | 12 October 1999 | Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit | Grab sample |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20217N653 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20217M021 | 20 September 1999 | Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG | |
ML20211N553 | 8 September 1999 | Safety Evaluation Supporting Amend 121 to License NPF-57 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20211B378 | 13 August 1999 | Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence | |
ML20210U472 | 31 July 1999 | Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20216D833 | 26 July 1999 | Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Earthquake |
ML20216D872 | 26 July 1999 | Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Fire Watch |
ML20210F333 | 22 July 1999 | Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) | Fire Barrier Incorporated by reference Pressure Boundary Leakage |
ML20210C473 | 30 June 1999 | Monthly Operating Rept for June 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20216D890 | 30 June 1999 | IPEEEs Technical Evaluation Rept High Winds,Floods & Other External Events | High winds Tornado Generated Missile |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML18107A344 | 1 June 1999 | Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 | |
ML20196A151 | 31 May 1999 | Monthly Operating Rept for May 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20206Q473 | 14 May 1999 | SER Accepting Response to GL 97-05, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant | Power-Operated Valves Backfit |
ML20206U157 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20216D845 | 30 April 1999 | Rev 1, Submittal-Only Screening Review of Hope Creek Unit 1 IPEEE (Seismic Portion). Finalized April 1999 | Mission time Safe Shutdown Earthquake Earthquake |
ML20206C848 | 22 April 1999 | SER Authorizing Pse&G Proposed Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B Pursuant to 10CFR50.55a(a)(3)(i) | Weld Overlay Hydrostatic Nondestructive Examination Dissimilar Metal Weld |
LR-N990157, Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced | 12 April 1999 | Special Rept 99-001:on 990315, C EDG Valid Failure Occurred During Surveillance Testing.Testing Resulted in Unsuccessful Loading Attempt,Due to Failure EDG Output Breaker to Close.Faulty Card Replaced | |
ML20205R590 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20205G605 | 19 March 1999 | SER Accepting Relief Request Re Acme Code Case N-567, Alternate Requirements for Class 1,2 & 3 Replacement Components,Section Xi,Div 1 | Non-Destructive Examination Hydrostatic Incorporated by reference |
ML20205F891 | 18 March 1999 | Safety Evaluation Authorizing Licensee Requests for Second 10-year Interval for Pumps & Valves IST Program | Stroke time Incorporated by reference Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20204F795 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification Coast down |
ML18106B093 | 25 February 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified | |
ML18106B055 | 1 February 1999 | Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl | |
ML18106B044 | 29 January 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables | |
ML20202F686 | 26 January 1999 | Engine Sys,Inc Part 21 (10CFR21-0078) Rept Re Degradation of Synchrostat Model ESSB-4AT Speed Switches Resulting in Heat Related Damage to Power Supply Card Components.Caused by Incorrect Sized Resistor.Notification Sent to Customers | Reverse polarity |
ML18107A187 | 31 December 1998 | PSEG Annual Rept for 1998. | |
ML20199E727 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Offsite Dose Calculation Manual Temporary Modification |
ML18107A188 | 31 December 1998 | PECO 1998 Annual Rept. | NJPDES Incorporated by reference Systematic Assessment of Licensee Performance |
LR-N980580, Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20198N416 | 12 November 1998 | MSIV Alternate Leakage Treatment Pathway Seismic Evaluation | Hydrostatic Design basis earthquake Exemption Request Earthquake |
LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with | Safe Shutdown Temporary Modification |
ML20155J986 | 31 October 1998 | Non-proprietary TR NEDO-32511, Safety Review for HCGS SRVs Tolerance Analyses | |
LR-N980491, Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
LR-N980439, Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Hope Creek Generating Station Unit 1.With | |
LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 | 31 July 1998 | Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 | Safe Shutdown Temporary Modification |
ML20236N675 | 9 July 1998 | Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps | |
LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 | 30 June 1998 | Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1 | Safe Shutdown Temporary Modification |
ML20236E949 | 30 June 1998 | Rev 0 to non-proprietary Rept 24A5392AB, Lattice Dependent MAPLHGR Rept for Hope Creek Generating Station Reload 7 Cycle 8 | |
ML18106A682 | 24 June 1998 | Revised Charting Our Future. | |
ML18106A668 | 17 June 1998 | Charting the Future. | |
LR-N980302, Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 | 31 May 1998 | Monthly Operating Rept for May 1998 for Hope Creek Generating Station,Unit 1 | |
ML20248C738 | 22 May 1998 | Rev 0 to Safety Evaluation 98-015, Extension of Allowed Out of Service Time for B Emergency Diesel Generator | Enforcement Discretion |
LR-N980247, Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Hope Creek Station, Unit 1 | Safe Shutdown Temporary Modification |
LR-N980196, Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Hope Creek Generating Station,Unit 1 | |
ML20217D570 | 20 March 1998 | Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 | |
ML18106A585 | 3 March 1998 | Emergency Response Graded Exercise,S98-03. Nuclear Business Unit Salem,Hope Creek Emergency Preparedness, 980303 | Boric Acid High winds High Radiation Area Earthquake Fuel cladding |