Monthly Operating Rept for Jul 1996 for Hope Creek Unit 1
ML20116P018
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/31/1996
From: Harris R
Public Service Enterprise Group
To:
Shared Package
ML20116P013 List:
References
NUDOCS 9608230100
Download: ML20116P018 (6)


Text

- .. _ ... .

. 1 DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 8/07/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1106 OPERATING DATA REPORT OPERATING STATUS

1. Reporting Period July 1996 Gross Hours in Report Period 744 2 Currently Authorized Power Level (MWt) 3293 Max. Depend. Capacity (MWe-Net) 1031 Design Electrical Rating (MWe-Net) 1067
3. Power Level to which restricted (if any) (MWe-Net) Rone
4. Reasons for restriction (if any) l l

This Month Yr To Date Cumulative .

5. No. of hours reactor was critical 744.0 3249.2 70173.1-6 Reactor reserve shutdown hours 0.0 0.0 0.0 i
7. Hours generator on line 744 3091.4 69033.0
8. Unit reserve shutdown hours 0.0 0.0 0.0
9. Gross thermal acrgy genrated (MWH) 2417604 9680632 2204548_82
10. Gross electrical energy generated (MWH) 799780 3231451 73057073
11. Net electrical energy generated (MWH) 770485 '3074084 69791319 l
12. Reactor service factor 100.0 63.6 83.3
13. Reactor availability factor 100.0 63.6 83.3 I
14. Unit service factor 100.0 60.5 81.9
15. Unit availability factor 100.0 60.5 81.9
16. Unit capacity factor (using MDC) 100.4 58.3 80.3
17. Unit capacity factor (using Design MWe) 97.1 56.4 77.6
18. . Unit forced outage rate OJ M 19 l
19. Shutdowns scheduled over next 6 months (type, date, & duration):
20. If shutdown at end of report period, estimated date of start-up:

9608230100 960815 PDR ADOCK 05000354 R PDH

DOCKET NO.: 50-354 UNIT: Hope Creek i

DATE: 8/07/96 l COMPLETED BY: R. Harris I TELEPHONE: (609) 339-1106 OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS l MONTII JULY 1996 l METHOD OF SHUTrlNG DOWN THE )

TYPE REACTOR OR  !

F= FORCED DURATION REASON REDUCING CORRECTIVE NO. DATE S= SCHEDULED (HOURS) (1) POWER (2) ACTION / COMMENTS n/a l

l I

\ i

l 1

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 8/07/96 COMPLETED BY: R. Harris TELEPHONE: (609)339-1106 AVERAGE DAILY UNIT POWER LEVEL MONTil JULY 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1037 17 1062 1

2 1031 18 1008 ]

3 1028 19 1040 4 1053 20 1056 5 1040 21 1061

  • 6 1033 22 1060 1 7 1015 23 1060 8 1033 24 1055 9 1036 25 1053'-

10 1026 26 1056 11 1040 27 1023 l 12 1040 28 1047 13 1035 29 1036 14 1016 30 1039 15 1024 31 936 16 1025

1

) .

DOCKET NO.: 50-354 UNIT: Ilone Creek i

DATE: 8/07/96 l COMPLETED BY: L. Keplev )

TELEPliONE: (609) 339-1106 l

REFUELING INFORMATION I

l l MONTH JULY 1996 1 j 1. Refueling information has changed from last month: l l Yes No X I 1

2 Scheduled date for next refueling (RF07): 9/6/97

3. Scheduled date for restart following refueling: 11/5/97

) 4A. Will Technical Specification changes or other license amendments be required?

Yes No X B. Has the Safety Evaluation covering the COLR been reviewed by the Station Operating

. Review Committee (SORC)?

l Yes ,_,,

No X If no, when is it scheduled? To Be Determined for Cycle 8 COLR

5. Scheduled date(s) for submitting proposed licensing action:

Ngtt required.

6. Important licensing considerations associated with refueling: l l N/A 1
7. Number ofFuel Assemblies:
A. Incore 764 B. In Spent Fuel S'orage 1472 j
8. Present licensed spent fuel storage capacity: 4006 i Future spent fuel storage capacity: 4006
9. Date oflast refueling that can be discharged 5/3/2006 to spent fuel pool assuming the present licensed capacity: (EOC13)

' (Does allow for full-core oft-load)

(Assumes 244 bundle reloads every 18 months until then)

(Does nqt allow for smaller reloads due to improved fuel)

)

DOCKET NO.: 50-354 UNIT: Hor >e Creek DATE: 8/07/96 COMPLETED BY: R. Harris TELEPHONE: (609) 339-1106 MONTHLV OPERATING

SUMMARY

MONTil JULY 1996

. The Hope Creek Generating Station remained on-line for the entire month and operated at essentially 100% power for the month of July 1996 except one load .

reducticn identified below.  !

l

. Power was reduced to 87% on July 7,1996 starting at 0301 hours0.00348 days <br />0.0836 hours <br />4.976852e-4 weeks <br />1.145305e-4 months <br /> to perform monthly i turbine valve testing. The load reduction was extended 22 minutes due to the load dispatcher's minimum generation alert. The unit was returned to 100% power on July 7,1996 at 0640.

  • At the end of the month the unit had been on-line for 129 days. i 1

l

\

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 08/07/96 COMPLETED BY: L.Kepley TELEPHONE: (609) 339-1106

SUMMARY

OF CIIANGES, TESTS, AND EXPERIMENTS FOR THE IIOPE CREEK GENERATING STATION MONTII JULY 1996 The following items completed during June 1996 have been evaluated to determine:

1. If the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
3. If the margin of safety as defined in the basis for any technical specification is reduced.

The 10CFR50.59 Safety Evaluations showed that these items did not create a new safety hazard to the plant nor did they affect the safe shutdown of the reactor. These items did not change the plant efiluent releases and did not alter the existing environmental impact. The 10CFR50.59 Safety Evaluations determined that no unreviewed safety or environmental questions are involved.