LR-N980354, Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1998 for Hope Creek Generating Station,Unit 1
ML20236S575
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/30/1998
From: Bezilla M, Ritzman R, Todd F
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N980354, NUDOCS 9807270049
Download: ML20236S575 (6)


Text

- _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ .

'O PSEG PubJic Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JUL 151998 LR-N980354 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 in compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for June 1998 are being forwarded. Also being forwarded to you, pursuant to the requirements of 10CFR50.59(b), is the summary of j changes, tests, and experiments that were implemented during June 1998. /

/

Sincerely, I

,6 , ,

Mark B. Bezilla [

General Manager -

Hoi:e Creek Operations RAR/mw Attachments l

C Distribution 900727 W 9 980630 ,

PDR ADOCK 05000354:

R PDR i Theynuerisinyourlunds.

95 2168 REV 694

INDEX NUMBER SECTION OF PAGES

-l' Ope rating D a ta Repo rt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Monthly Operating Sum ma ry. .. ... ... . . ... ..... . . ..... . ..... ... ... . . . . . . .. .... . .... ..... . .. .. . .. 1 Summary of Changes, Tests, and Experiments................................... 2 t

1 1

i 1

l l

1 l

i l

li

_ ____________m_______m..___.___-___________._____m._._ _ _______ .___.__.m.m__ _ . _ _ ______._____._._ _ . _ _ _ _ __ ._ _.__.m.m__.______.__________.m.________ - -

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 07/15/98 COMPLETED BY: F.Todd TELEPHONE: (609) 339-1316 Reporting Period June 1998 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net) 1031 Month Year-to-date Cumulative No.' of hours reactor was critical 720 l 4343 l 84883 l No. of hours generator was on line (service 720 4343 83413 hours)

Unit reserve shutdown hours 0 l0 l0 l Net Electrical Energy (MWH) 746307 l 4498577 l 84395729 l UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE F= FORCED (HOURS) (1) SHUTTING ACTION / COMMENT S= SCHEDULED DOWN THE REACTOR (2)

N/A (1) Reason (2) Method j A- Equipment Failure (Explain) 1 - Manual B - Maintenance or 7est 2 - ManualTrip/ Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other i

i

'__i.___z____._____________

L _ _ . _ _ . _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ . _ _ _ . . _ _ _ . _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _

DOCKET NO.: 51 354 UNIT: Hope Creek DATE: 07/15/98 COMPLETED BY: R. Ritzman TELEPHONE: (609) 339-1445 Summary Of Monthly Operating Experience

. Hope Creek entered the month of June at approximately 100% reactor power.

. Reactor power was reduced on June 28 for turbine valve testing. Reactor power was returned to 100% later that day.

  • At the end of the month, Hope Creek had completed its 199th consecutive day of continuous power operation.

j C________.._

I ,e .

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 07/15/98 COMPLETED BY: R. Ritzman TELEPHONE: (609) 339-1445

SUMMARY

OF CHANGES, TESTS, AND EXPERIMENTS FOR THE HOPE CREEK GENERATING STATION MONTH JUNE 1998 j The following items completed during June 1998 have been evaluated to determine:

I

1. If the probability of occurrence or the consequences of an accident or m:?lfunction of )

equipment important to safety previously evaluated in the safety analysis report may be increased; or

' 2. If a possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or i 1

3. If the margin of safety as defined in the basis for any technical specification is reduced.

The 10CFR50.59 Safety Evaluations showed that these items did not create a new safety hazard to the plant nor did they affect the safe shutdown of the reactor. These items did not change the plant effluent releases and did not alter the existing environmental impact. The 10CFR50.59 Safety Evaluations determined that no unreviewed safety or environmental questions are involved.

Design Changes Summary of Safety Evaluations 4HE-0258, Package 3, Channel "A" Station Service Water Strainer Small Bore Drain' Line Piping Replacement. This design change replaced the one and two inch piping associated with the "A" Station Service Water Strainer Drain. The piping was cement lined carbon steel piping, and was replaced with 6% molybdenum austenitic stainless steel piping.

l E.'_______.___________.__._____

This design change did not impact the anticipated operational transients or postulated design basis accidents applicable to the Service Water system. It did not impact the

. capability of the Service Water system to automatically actuate, or to perform its design

. functions during operational transients or postulated design basis accidents. This design change did not increase the probability or consequences of a malfunction of equipment important to safety, create the possibility of an accident or malfunction of a

- different type than previously evaluated in the SAR, or reduce the margin of safety for any Technical Specifications. Therefore, there are no unreviewed safety questions associated with this design change.

Temporary Modifications Summary of Safety Evaluations L TMR 98 013, Turbine Building High Conductivity Sump Pump Temporary

+

Modification. This temporary modification installed a temporary chemical-resistant air

' driven pump, pump suction hose, and pump discharge hose in the Turbine Building.

This temporary sump pump was installed until the normal sump pumps could be repaired.

Neither the installation, operation, removal, nor failure of the temporary sump pump will inhibit any component or structure required for safe shutdown from perforraing its design function. There are no anticipated operational transients or postulated design basis accidents applicable to this proposal. This temporary modification did not increase the probability or consequences of a malfunction of equipment important to safety, create the possibility of an accident or malfunction of a different type than previously evaluated in the SAR, or reduce the margin of safety for any Technical Specifications. Therefore, there are no unreviewed safety questions associated with

' this temporary modification.

Procedures Summary of Safety Evaluations There were no reportable changes in this category implemented during June 1998.

UFSAR Change Notices Summary of Safety Evaluations There were no reportable changes in this category implemented during June 1998.

Deficiency Reports Summary of Safety Evaluations There were no reportable changes in this category implemented during June 1998.

Other ' Summary of Safety Evaluation There were no reportable changes in this category implemented during June 1998.

(