ML20214W445

From kanterella
Revision as of 23:19, 3 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 20 to Security Plan,Reflecting Recent Amends to 10CFR73.55.Rev Withheld (Ref 10CFR73.21)
ML20214W445
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/02/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
References
NUDOCS 8612100227
Download: ML20214W445 (2)


Text

SAFEGUARJS N0liVATON Duxe POWER GoxPANY P.O. nox W118D CHAHLOTTE. N.C. 28242

"'D,".J.E.IY" CLASSIFIED  :

f December 2, 1986 "b #

ONGAN!hNn / t c / u , *. b DATE- /2/4 /pg, 9 Mr. Harold R. Denton, Director / ' --

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: Document Control Desk

Subject:

Oconee Nuclear Station - Docket Nos. 50-269, -270, -287 -

Security Plan, Revision 20 - (December 1,1986)

WHEN SLPARATED FROM ENCt0SU2E3

Dear Mr. Denton:

NA .0tE IMf3 00CUME' I AS CECCNTh0LtD Pursuant to NRC/0NRR draft review and approval, please find attached five (5) copies of Revision 20 to the Oconee Nuclear Station Security Plan. Revision 20 to the security plan addresses the recent Nuclear Regulatory Commission amendments to 10CFR 73.55.

Duke Power Company agrees to implement the proposed changes to the Security Plan which address the amended requirements of 73.55(a), (d)(2), (d)(7), (d)(9) and (e)(1) within 180 days af ter NRC/0NRR approval. Proposed changes to the Security Plan which address the amended requirements of 73.55(d)(1) shall be implemented within 60 days of NRC/0NRR approval.

Specific plan changes are addressed in the attachment. Revision 20 does not decrease the effectiveness of the Oconee Nuclear Station Security Plan.

This material is applicable to the security provisions at Oconee Nuclear Station; l therefore, Duke requests that this material be withheld from public disclosure l pursuant to 10CFR 73.21.

Any licensing questions concerning these proposed changes should be addressed to J.W. Davis, Nuclear Production Department - Licensing (704-373-5742) . Operational or implementation questions concerning these proposed changes should be addressed to T.K. Anderson, Director of Nuclear Security (704-373-7314),

l Very truly yours, THIS C00U.9ENT CONTAlf.S SUDl4CS l'ereweTel.

APiY PERSON WHO ALLOWS UNAUTHOUZr.9 OfSctOSURE MAY BE CUILTY OF A CRIME: APM UPnN CTMCTI0ff l WAY BE PUN!SHE3 BY A FINE OR If#R'SONMENT l ar.e: /8 r _

OR BOTH UNDER THE PRO'!!S;Cf;! 0F 10 CFR 73 83 8612100227 861202 Hal B. Tucker PDR ADOCK 05000269 JWD/183/j gm F PDR

$0c{

l Attachment SATEG1 ARDS 'N:0llV AT ON M l

Mr. Hatold.R., Denton December 2, 1986 h I[

' ' I l "FjON l i Page 2 xc: w/1 copy of attachment Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II P.O. Box 2203 Atlanta, GA 30301 w/o attachments Mr. J.C. Bryant NRC Resident Inspector Oconee Nuclear Station

.g'- n .~. .i;r r;3 tat?;S OFFCUA'$1 ' UI#N-

, p'[n[y h,'it0 3Lt0'N.I UNEUTHcp ;;'i : ' t*,0J E aqy g'h~cy;trt GF A C'!!ME: CD UP?: ' 'JilGIN enY BE PU?l'SHED BY A F.INE CR !?pa:s;r !?!NT 03 BOTH U OER lii; pg0y1310f4S OF 10 CfR 73 D

(

kYLLEI Ih.,.k' u Il?{; 'iii SAtiGLARDS V0lVKTON