Notice of Violation from Insp on 861021-1120
ML20215E918
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/10/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20215E911 List:
References
RTR-REGGD-01.033, RTR-REGGD-1.033 50-370-86-35, NUDOCS 8612230167
Download: ML20215E918 (2)


Text

. . . _.

. +

le ENCLOSURE NOTICE OF VIOLATION Duke Power Company . Docket No. 50-370 McGuire Unit 2 License No. NPF-17 During the Nuclear Regulator Commission (NRC) inspection conducted on October 21

- November 20, 1986, a violation of ' NRC requirements was identified. The violation involved a failure to comply with Technical Specification (TS) 6.8.1 in that written procedures were not properly implemented. In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions", .10 CFR Part 2, Appendix C (1986), the violation is listed below: .

Technical Specification 6.8.1 requires that written procedures be esta-blished, implemented, and maintained covering the activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Revision 2, February 1978 recommends that general .

plant operations including heatup from cold shutdown to hot standby be covered by written procedures.

Step 12 of Enclosure 4.2, " Pre-Heatup Checklist", of McGuire Operating Procedure OP/2/A/6100/01, " Controlling Procedure for Unit Startup", directs that no-load programmed steam generator levels be established per OP/2/A/6250/03A, " Steam Generator Wet layup Recirculation".

Contrary to the above, OP/2/A/6100/01 and OP/2/A/6250/03A were not properly implemented during a Unit 2 startup on November 17, 1986, in that a control room operator initialed Step 12 of OP/2/A/6100/01 as complete, when, in actuality, steam generator levels had not been established per OP/2/A/6250/03A. This resulted in a lifting of the steam generator wet layup pump relief valves and a spill of approximately 3000 gallons of secondary water to the auxiliary building floar.

This is a Severity Level IV (Supplement 1) violation and applies to Unit 2 only.

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit to this office within 30 days of the date of the letter transmitting

_ - - this Notice, . a written statement or explanation in reply including for each violation: (1) admission or denial of the violation, (2) the reason for the (

violation if admitted (3) the corrective steps which have been taken and the B612230167 861210 PDR ADOCK 05000369 Q PDR.

l 4

l r

i

< e.

  • ' Duke Power Company 2 Docket No. 50-370 McGuire Unit 2 License No..NPF-17 results achieved, (4) the corr (ctive steps which will be taken to avoid further violations,'and (S) the date when full compliance will be achieved. Where good 3

cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REES ATORY COMMISSION y / '

- /d s RogerD.WalAer Direc or Division of Y ctor Projects Dated at Atlanta, Georgia a this lo

  • day of December 1986 6

e l

4 0

i 4

8 u-__.-_.-----