MONTHYEARML20217N1491999-10-21021 October 1999 Notice of Violation from Insp on 990720-29.Violation Noted: as of July 1999,licensee Did Not Take Adequate Measures to Assure That Condition Adverse to Quality Involving Macro Biological Fouling of Service Water System Corrected ML20207E0761999-02-25025 February 1999 Notice of Violation from Insp on 981227-990206.Violation Noted:Licensee Failed to Promptly Identify & Correct Condition Adverse to Quality in That Investigation of Improperly Calibr Channnels Was Incompleted ML20206U3141999-02-0505 February 1999 Notice of Violation from Insp on 981116-1217.Violation Noted:On or Before 981217,design Control Measures Were Not Established to Ensure That Design Basis Closing Voltage Requirements of Circuit Breakers Were Met & Verified ML20151Z3181998-09-15015 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:On 980808,inspectors Observed Maint Supervisor Manipulate Outboard Pump Packing Supply Valve & Perform Maint by Adjusting Outboard Packing Gland Nuts ML20236X8661998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:From 1988 to Sept 1997,licensee Routinely Vented Units 1 & 2 HHSI Piping Prior to Surveillance Testing W/O Proper Controls to Evaluate Amount of Gas.No Response Required ML20236X8631998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:During Period of 980428-0608,licensee Failed to Implement Procedures as Evidenced by Listed Examples ML20217F5881998-04-22022 April 1998 Notice of Violations from Insp on 980208-0321.Violations Noted:Conditions Adverse to Quality Were Not Promptly Corrected from Nov 1993 to March 1998,util Failed to Correct Known Unit 1 & 2 TS Deficiency in Timely Manner ML20217B9771998-03-17017 March 1998 Notice of Violation from Insp on 971228-980207.Violations Noted:Repair Activities for 2-1 Station Battery Were Not Properly pre-planned & Implemented ML20216E8071998-03-0909 March 1998 Notice of Violation from Insp on 980105-0212.Violations Noted:On 971218 Dl Implemented Change to Temporary Operating Procedure to Allow Operators to Control Cooldown & Heatup Rate of Reactor Coolant by Mean Other than by Regulating IR 07100116/20120271998-02-0404 February 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:Licensee Had Not Tested 20 of 27 Direct Lines at Alternate EOF in Coraopolis,Pa ML20198K4761998-01-0606 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Between 1988 & 970912, Condition Adverse to Quality Existed at Unit 1 & 2,when Excessive Gas Accumulated in HHSI Pumps Suction Lines IR 07100005/20110151997-11-26026 November 1997 Notice of Violation from Insp on 971005-1115.Violations Noted:Workers,Found in Radiology Controlled Areas,Not Aware of Radiological Conditions in Work or Travel Areas ML20198S6351997-11-0707 November 1997 Notice of Violation from Insp on 970830-1004.Violation Noted:Licensee Changed QA Program Resulting in Reduction in Commitments in QA Program Description Previously Accepted by NRC W/O Prior NRC Approval ML20217P7731997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:Previous Corrective Actions Inadequate in That on 970701,unplanned Engineered Safety Feature Actuation, Occurred During Troubleshooting Activities on Unit 1 ML20141G9971997-07-0303 July 1997 Notice of Violation from Insp on 970209-0426.Violation Noted:During EDG Surveillance Tests,Load Test Values Used Were Inadequate to Ensure That EDGs Achieved 2750 Kw Due to Inaccuracies in Kilowatt Meter Instrument Loop ML20141E9391997-06-23023 June 1997 Notice of Violation from Insp on 970427-0607.Violation Noted:On 970515,operators Failed to Properly Certify Shift Operating Log Accuracy for Shift Turnover ML20137F3921997-03-24024 March 1997 Notice of Violation from Insp on 961222-970208.Violations Noted:When Repeatedly Depressurizing Unit 2 RHR Sys from 970123-30,operators Did Not Properly Implement Procedures as Required ML20147F1271997-03-10010 March 1997 Notice of Violations & Proposed Imposition of Civil Penalties in Amount of $160,000.Violations Noted:Licensee Did Not Provide Adequate Measures to Verify Selection of Suitable Leak Sealant Matl for Use in Leak Repair ML20135B7381997-02-21021 February 1997 Notice of Violation from Insp on 961222-970208.Violation Noted:As of 970201,licensee Never Installed Rms in Plan,Unit 1 Nfsas Capable of Alarming Should Accidental Criticality Occur ML20134K2471996-11-0808 November 1996 Notice of Violation from Insp on 960813-0928.Violations Noted:Safeguards Info Not Adequately Protected IAW Listed Procedures ML20058H2971993-12-0606 December 1993 Notice of Violation from Insp on 931018-22.Violations Noted:On 920405,7/8 body-to-bonnet Studs Were Not Torqued to 340 ft-lbs as Required in Table 1 of Licensee Procedure 2CMP-75-FISHER VLV-1M,Issue 4,Rev O,Per 10CFR50,App B ML20058M7891993-11-14014 November 1993 Notice of Violation from Insp on 931026-1127.Violation Noted:Licensee Failed to Establish Adequate Design Control Measures for Installation Specification of Reactor Coolant Sys RTDs ML20058Q0381993-10-15015 October 1993 Notice of Violation from Insp on 920908 & 930720.Violation Noted:Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects ML20057E8321993-10-0101 October 1993 Notice of Violation from Insp on 930824-0927.Violation Noted:Requirements of TS Were Not Satisfied as Evidenced by Listed Examples ML20248G0081989-09-29029 September 1989 Notice of Violation from Insp on 890523-0707.Violation Noted:Approx 90 Measuring & Test Devices Past Due for Calibr & Not Properly Marked & Segregated from Calibr Measuring & Test Devices as Required by Procedure ML20246A9861989-08-11011 August 1989 Notice of Violation from Insp on 890523-0707.Violations Noted:Licensee Corrective Actions in Response to Findings Identified in Insp Rept 88-22,Detail 10 Re Electrical Cable Inadequate ML20245C5471989-04-19019 April 1989 Notice of Violation from Insp on 890216-0331.Violation Noted:On 890322,inadvertent Safety Injection Occurred Due to Procedural Inadequacies in That Procedures Not Appropriate for Circumstances ML20205K6521988-10-20020 October 1988 Notice of Violation from Insp on 860609-13 & 880509-13. Violations Noted:Qualification of Victoreen High Range Radiation Monitor Cable Assembly Not Established & Unqualified Wire Jumper in MOV-RW-105D Identified ML20154P8171988-09-23023 September 1988 Notice of Violation from Insp on 880716-0831.Violation Noted:Defect Identified in Three Containment Isolation Valves Not Analyzed Until 10 Months After Receipt of Documentation ML20151U5591988-08-12012 August 1988 Notice of Violation from Insp on 880601-0715.Violation Noted:Outer Periphery of Cable Group in Tray 1TC545 Not Separated by at Least 6 Inches from Outer Periphery of Redundant Cable Group in Tray 1TC306B ML20207C9111988-08-0303 August 1988 Notice of Violation from Insp on 880509-13.Violation Noted: Equipment Qualification File 0044,Rev 3 for motor-operated Valve MOV-S1-885B Did Not Have Sufficient Documentation to Establish Qualification of Ideal Model Wirenuts ML20196D4651988-06-21021 June 1988 Notice of Violation from Insp on 880509-13.Violation Noted: Contrary to Tech Spec 6.11,air Sample Paper Found to Indicate 2,400 Ncpm & Supervision Not Notified in Order to Determine If Immediate Corrective Actions Needed ML20154D9411988-05-12012 May 1988 Notice of Violation from Insp on 880321-0401.Violation Noted:Acceptability of Emergency Diesel Generator Starting Air Sys Seismic Supports Degraded Due to Loose Bolts ML20153G4011988-04-28028 April 1988 Notice of Violation from Insp on 880303-08.Violation Noted: Failed to Maintain Required Number of Operable hi-hi Containment Pressure Channels While Reactor Was in Hot Shutdown,Startup or Power Operation Modes ML20151G5631988-04-0808 April 1988 Notice of Violation from Insp on 880222-26.Violation Noted: on 870908 Shipment Number 0951 of Radwaste Sent to Supercompacting Facility & Accompanied by Manifest Which Did Not Identify Existence & Quantities of Radwaste in Shipment ML20150B5251988-03-0404 March 1988 Notice of Violation from Insp on 880125-29.Violation Noted: on 880126,radiological Controls Technician Entered Unit 1 Containment While Not Dressed in Accordance W/Min Anticontamination Clothing Requirements ML20236H2531987-07-29029 July 1987 Notice of Violation from Safety Insp on 870605-17. Violations Noted:All Three Chlorine Detection Sys Inoperable & Design Changes Re Chlorine Detection Sys Inadequate ML20216A9481987-06-18018 June 1987 Notice of Violation from Insp on 870406-15 & 0507-08 ML20216G4861987-06-17017 June 1987 Notice of Violation from Insp on 870418-0604 ML20215K1511987-06-16016 June 1987 Notice of Violation from Insp on 870316-26 ML20214Q8471987-05-28028 May 1987 Notice of Violation from Insp on 870316-0417 ML20215M0051987-05-0606 May 1987 Notice of Violation from Insp on 870301-0412 ML20215J0181987-04-28028 April 1987 Notice of Violation from Insp on 860929-1003.Violation Noted:Util Did Not Adequately Describe Corrective Actions Taken & Provide Sufficient Info to Permit Analysis & Evaluation of Deficiency ML20205T4941987-03-31031 March 1987 Notice of Violation from Insp on 870201-0315 ML20207S2491987-03-12012 March 1987 Notice of Violation from Insp on 870117-0228 ML20211E9291987-02-13013 February 1987 Notice of Violation from Insp on 861215-19 & 870105-09 ML20212R6071987-01-23023 January 1987 Notice of Violation from Insp on 861208-11 ML20214H6171986-11-19019 November 1986 Notice of Violation from Insp on 861004-1102 ML20214C7941986-11-17017 November 1986 Notice of Violation from Insp on 860930-1003 ML20207B2051986-11-0404 November 1986 Notice of Violation from Safety Insp on 861006-10 1999-02-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H1999-10-22022 October 1999 PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H ML20217N1491999-10-21021 October 1999 Notice of Violation from Insp on 990720-29.Violation Noted: as of July 1999,licensee Did Not Take Adequate Measures to Assure That Condition Adverse to Quality Involving Macro Biological Fouling of Service Water System Corrected IR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action1999-07-26026 July 1999 PNO-I-99-036:on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action PNO-I-99-033, on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault1999-07-19019 July 1999 PNO-I-99-033:on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000412/19993011999-04-20020 April 1999 NRC Operator Licensing Exam Rept 50-412/99-301(including Completed & Graded Tests) for Tests Administered on 990322- 25.All Applicants Passed All Portions of Exams IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20207E0761999-02-25025 February 1999 Notice of Violation from Insp on 981227-990206.Violation Noted:Licensee Failed to Promptly Identify & Correct Condition Adverse to Quality in That Investigation of Improperly Calibr Channnels Was Incompleted ML20206U3141999-02-0505 February 1999 Notice of Violation from Insp on 981116-1217.Violation Noted:On or Before 981217,design Control Measures Were Not Established to Ensure That Design Basis Closing Voltage Requirements of Circuit Breakers Were Met & Verified IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20151Z3181998-09-15015 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:On 980808,inspectors Observed Maint Supervisor Manipulate Outboard Pump Packing Supply Valve & Perform Maint by Adjusting Outboard Packing Gland Nuts IR 05000334/19983011998-08-21021 August 1998 Exam Repts 50-334/98-301OL & 50-412/98-301OL Conducted During Wks of 980803-07 & 17-21.Exam Results:Four Unit 2 SRO Candidates Passed All Portions of Initial Exam.Good Performance Noted During Exam in Area of Crew Communication ML20236X8661998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:From 1988 to Sept 1997,licensee Routinely Vented Units 1 & 2 HHSI Piping Prior to Surveillance Testing W/O Proper Controls to Evaluate Amount of Gas.No Response Required IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236X8631998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:During Period of 980428-0608,licensee Failed to Implement Procedures as Evidenced by Listed Examples IR 05000334/19983001998-06-0303 June 1998 Exam Rept 50-334/98-300OL Conducted on 980420-24 & 0518.Exam Results:Three SRO Instant Candidates Passed All Portions of Initial License Exam ML20217F5881998-04-22022 April 1998 Notice of Violations from Insp on 980208-0321.Violations Noted:Conditions Adverse to Quality Were Not Promptly Corrected from Nov 1993 to March 1998,util Failed to Correct Known Unit 1 & 2 TS Deficiency in Timely Manner ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9771998-03-17017 March 1998 Notice of Violation from Insp on 971228-980207.Violations Noted:Repair Activities for 2-1 Station Battery Were Not Properly pre-planned & Implemented ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8071998-03-0909 March 1998 Notice of Violation from Insp on 980105-0212.Violations Noted:On 971218 Dl Implemented Change to Temporary Operating Procedure to Allow Operators to Control Cooldown & Heatup Rate of Reactor Coolant by Mean Other than by Regulating ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness IR 07100116/20120271998-02-0404 February 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:Licensee Had Not Tested 20 of 27 Direct Lines at Alternate EOF in Coraopolis,Pa PNO-I-98-002, on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.31998-02-0202 February 1998 PNO-I-98-002:on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.3 IR 05000334/19970101998-01-0909 January 1998 NRC Operator Licensing Exam Rept 50-334/97-10OL (Including Completed & Graded Tests) for Tests Administered on 971215- 18 ML20198K4761998-01-0606 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Between 1988 & 970912, Condition Adverse to Quality Existed at Unit 1 & 2,when Excessive Gas Accumulated in HHSI Pumps Suction Lines ML20199A1711997-12-31031 December 1997 EN-97-119:on 980106,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Violation Involving Failure to Take Adequate Action to Correct Significant Condition Adverse to Quality PNO-I-97-077, on 971216,Duquesne Light Co Initiated Unit 2 Reactor Shutdown in Accordance W/Ts 3.0.3.Licensee Plans to Address Unit 2 Design Deficiency for CR Emergency Air Cleanup & Pressurization,During Shutdown1997-12-17017 December 1997 PNO-I-97-077:on 971216,Duquesne Light Co Initiated Unit 2 Reactor Shutdown in Accordance W/Ts 3.0.3.Licensee Plans to Address Unit 2 Design Deficiency for CR Emergency Air Cleanup & Pressurization,During Shutdown ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 07100005/20110151997-11-26026 November 1997 Notice of Violation from Insp on 971005-1115.Violations Noted:Workers,Found in Radiology Controlled Areas,Not Aware of Radiological Conditions in Work or Travel Areas IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198S6351997-11-0707 November 1997 Notice of Violation from Insp on 970830-1004.Violation Noted:Licensee Changed QA Program Resulting in Reduction in Commitments in QA Program Description Previously Accepted by NRC W/O Prior NRC Approval IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program ML20217P7731997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:Previous Corrective Actions Inadequate in That on 970701,unplanned Engineered Safety Feature Actuation, Occurred During Troubleshooting Activities on Unit 1 IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141G9971997-07-0303 July 1997 Notice of Violation from Insp on 970209-0426.Violation Noted:During EDG Surveillance Tests,Load Test Values Used Were Inadequate to Ensure That EDGs Achieved 2750 Kw Due to Inaccuracies in Kilowatt Meter Instrument Loop 1999-09-07
[Table view] |
Text
r ENCLOSURE NOTICE OF VIOLATION Duquesne Light Company - Docket No. 50-412 Beaver Valley Unit 2 Power Station License No. NPF-73 EA 99-212 During an NRC inspection completed on July 29,1999, violations of NRC requirements were identified.- In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below:
A.' 10 CFR Part 50, Appendix B, Criterion XVI, requires, in part, that measures be established to assure that conditions adverse to quality, such as deficiencias, deviations, and nonconformances are promptly identified and corrected.
Contrary to the above, as of July 1999, the licensee did not take adequate measures to assure that a condition adverse to quality involving macro biological fouling (biofouling) of the service water system was promptly identified and corrected, despite prior opportunities to do so. Specifically:
- 1. Between 1990 and 1995, the licensee identified the potential for zebra mussel infestation in plant systems and developed a plan for preventive and corrective actions. However, these actions were not fully integrated into procedures and, as a result, the actions were not fully implemented.
- 2. In Febmary 1998, zebra mussels were identified in the plant intake pump bays; however, no revisions were made to the plan to control zebra mussel infestation and no action was taken to ensure that the planned actions were effectively implemented.
The failure to consistently perform routine biocide treatments in 1998 and 1999, coupled with the performance of ineffective bulk blocide treatments during this period, allowed zebra mussels to accumulate in the service water system. As a result, following a bulk blocide treatment in July 1999, the heat exchanger for Emergency Diesel Generator (EDG) 2-2 became fouled with zebra mussels which significantly degraded the cooling water flow through the heat exchanger. (01013)
B. 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that procedures shall include acceptance criteria for determining that
- important activities have been satisfactorily accomplished.
9910200123 991021 PDR ADOCK 05000412 e PDR
4 Enclosure 2 Contrary to the above, as of July 7,1999, Operating Procedure 2OM-30.4.M, "BV-2 Asiatic Clam Chemical Treatment Program," Revision 7, did not include adequate acceptance criteria for determining that important activities had been satisfactorily accomplished. Specifically, the procedure did not contain quantitative or qualitative acceptance criteria for verifying service water flow through all of the heat exchangers, nor did the procedure require post-treatment monitoring of the heat exchangers for indication of flow degradation. Consequently, use of the procedure on July 7,1999, to clean the service water piping of zebra mussels resulted in biofouling of the 2-2 EDG service water heat exchanger and restricted the water flow to 1070 gpm, which was below the design basis minimum requirement of 1170 gpm. This flow degradation remained undetected until an EDG surveillance test was conducted on July 14,1999.
(01023)-
These violations constitute a Severity Level ill problem (Supplement 1).
The NRC has concluded that information regarding the reason for the violations, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance will be achieved is already adequately addressed on the docket in a letter from the Duquesne Light Company (Licensee), dated October 7,1999. However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein
- does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a " Reply to a Notice of Violation," and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice),
if you contest this enforcement action, you should also provide a copy of your response to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001. If you choose to provide a response, under the authority of Section 182 of the Act,42 U.S.C. 2232, the response shall be submitted under oath or affirmation.
If you choose to respond, your response will be placed in the NRC Public Document Room (PDR). Therefore, to the extent possible, the response should not include any personal privacy, proprietary, or safeguards inforr.1ation so that it can be placed in the PDR without redaction.
t in accordance with 10 CFR 19.11, you may be required to post this Notice within two working days.
l Dated at King of Prussia, Pennsylvania
- l. this 21st day of October 1999 i-i