Notice of Violation from Insp on 880509-13.Violation Noted: Equipment Qualification File 0044,Rev 3 for motor-operated Valve MOV-S1-885B Did Not Have Sufficient Documentation to Establish Qualification of Ideal Model Wirenuts
ML20207C911
Person / Time
Site: Beaver Valley
Issue date: 08/03/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20207C899 List:
References
50-334-88-21, NUDOCS 8808100304
Download: ML20207C911 (1)


Text

_ _ _ _ _ _ _

1 l

i APPENDIX A NOTICE OF VIOLAT1,0N Duquesne Light Company License No. OPR-66 Beaver Valley - 1 Docket No.

50-334 As a result of the inspection conducted on May 9-13, 1988, and in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy) (1988), the following violation was identified:

10 CFR 50.49(f) requires that qualification of each component be based on testing or experience with identical equipment or with similar equipment with a supporting analysis to show that the equipment to be qualified is acceptable.

Beaver Valley site administrative procedure Chapter 31 Tevision 2 Section 2a requires that equipment have suf'icient doca,..entation to establish that the equipment is environmentally qualified.

Contrary to the above on May 12, 1988, the equipment qualification file 0044 Revision 3 for motor operated valve MOV-SI-885B did not have sufficient documentation to establish the qualification of Ideal Model wirenuts utilized in the motor stator wiring circuit.

This is a Severity Level IV (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby required to submit to this office within thirty davs of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the reason for violation, if admitted; (2) the corrective steps which have been taken and the results achieved; (3) corrective steps which will be taken to avoid further violations; and, (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

i

)

i 8808100304 880803 PDR ADOCK 05000334 Q