Notice of Violation from Insp on 860609-13 & 880509-13. Violations Noted:Qualification of Victoreen High Range Radiation Monitor Cable Assembly Not Established & Unqualified Wire Jumper in MOV-RW-105D Identified
ML20205K652
Person / Time
Site: Beaver Valley
Issue date: 10/20/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20205K632 List:
References
50-334-86-12, 50-334-88-21, NUDOCS 8811010271
Download: ML20205K652 (2)


Text

. - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

APPENDIX A NOTICE OF VIOLATION Duquesne Light Company Licwnse No. OPR-66 Beaver Valley 1 Docket No. 50-334 As a result of the inspections conducted on June 9-13, 1986 and May 9-13, 1988, and in accordance with the "General Statement of Policy and Procedura for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy) (1988),

the following violation was idertified:

10 CFR 50.49 (f) and (j), respectively, require that (1) each item of electric equipment important to safety shall be qualified by testing and/or analysis of identical or similar equipment, and the qualification based on similarity shall includo a supporting analysis to show that equipment to be qualified is acceptable; and, (2) a record of the qualifi-cation shall be maintained in an auditable form to permit verification that each item of electrical equipment important to safoty is qualified and that the equipment meets the specified performance requirements under postulated environmental ennditions.

Contrary to the above,

1. on June 12, 1986, the NRC inspectors determined that the qualification of the Victoreen High Range Radiation Monitor (HRRM) cable assembly was not established. There was inadequate test or analytical informa-tion to demonstrate that these instruments would satisfy performance requirements as a result of potentially high thermal-induced leakage current in the cable assembly during accident conditions. The HRRMs are provided to monitor variables specified in Regulatory Guide 1.97 and are therefore defined as electrical equips.ont important to safety by 10 CFR 50.49 (b)(3). Two HRRMs were identified with this deficiency.
2. on May 12, 1988, the inspector found an unidentified, unqualified wire jumper in MOV-RW-1050. This MOV was recently added to the licensee's environmental qualification master list to satisfy the guidance of Reg. Guide 1.97 and is defined as electrical equipment important to safety by 10 CFR 50.49(b)(3). In followup inspections of MOVs conducted by the licensee between May 12 and June 11, 1988, the licensee identified an additional 20 MOVs, that had been added to the EQ master list to satisfy Regulatory Guide 1.97 guidance with unidentifiable, unqualified jumper wire. In addition on June 6, 1988, during a licensee reinspection of previously inspected MOVs on the EQ master list, the licensee identified 11 MOVs in the charging and safety injection systems with unqualified wire.

These items are a Severity Level Ik violation (Supplement I).

8811010271 881020

{DR ADOCK0500gl4

e e e Appendix A 2 Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company, is he"eby  ;

required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the reason for violation, if admitted; (2) the corrective  ;

steps which have been taken and the results achieved; (3) corrective steps  !

, which will be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.