_

?, . - -

APPENDIX A NOTICE OF VIOLATION Duquesne Light Company Docket No. 50-412 Beaver Valley Power Station, Unit 2 License No. CPPR-105 As a result of the inspection conducted on October 4 - November 2,1986, and in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:

10 CFR 50, Appendix B, Criterion V requires activities affecting quality to be prescribed by documented instructions, procedures or drawings which include

' appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.

I In addition, 10 CFR 50, Appendix B, Criterion X requires a program for in-spection of activities affecting quality to be established and executed to verify conformance with documented instructions, procedures and drawings for accomplishing the activity.

Contrary to the above, as of October 28, 1936, Specification 2BVS-920 and In-spection Procedures 7.3.1 and 10.5 did not contain appropriate quantitative or qualitative acceptance criteria to effectively measure rigid sway strut paddle / bracket clearances to ensure that 10 degrees of lateral movement, as designed, could be achieved. Furthermore, QC inspection for support 2 SIS-PSST-3024 shown on Drawing Number 12241-BZ-81A-6-28, failed to verify con-formance with paddle / bracket clearance requirements as described by the aforementioned specification and inspection procedures in that 10 degrees of lateral movement could not be achieved.

This is a Severity Level IV Violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby re-

quired to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including (1) the corrective steps which have been taken and the results achieved; (2) cor-rective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.