Notice of Violation from Insp on 870406-15 & 0507-08
ML20216A948
Person / Time
Site: Beaver Valley
Issue date: 06/18/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20216A938 List:
References
50-412-87-32, NUDOCS 8706290013
Download: ML20216A948 (1)


Text

a g

l:

APPENDIX A-NOTICE OF VIOLATION I

.i Duquesne Light-Company.

Dock'et No:

50-412-Beaver Valley Power Station Unit #2 License No: CPRR-105 i

.As a= result of thel inspection conducted on April 6-15 and_May' 7-8,-1987, and in

,i~"

accordance with the NRC Enforcement Policy (10 CFR'2, Appendix C) theLfollowing violation was identifiedi 10 CFR 50, Appendix'B, Criterion III requires that measures shall be establi-

-shed to assure.that design basis for systems and components to which this appendix applies are correctly translated into drawings, procedures and instructions.

.q The Beaver Valley Power cable-specification 2BVS-82B to the Okonite. Company and

.2BVS-309 to the Kerite' Company states in the Insulation Section, paragraph 2, that the cable thermal properties shall be.'such.as to maintain its critical-electrical and physical-qualities during the.40 year plant life expectancy when-the conductor temperature for. normal operation will be 90 C.

This requires measures to be established to prevent the conductor temperature from exceeding l

the 90 C design'11mit.

<j u

Contrary to the above, on April 15, 1987 inspection procedure for prot.ective wrap IP 12.1 dated. March 30, 1987 and installation drawings SECO 1.2.3.4.-A40

'y Rev. 11; A-50 Rev._9, A-52 Rev. 2, did not specify a limit for the maximum e

number of layers of the WT65 siltemp material on extended cable wraps to limit the power. cable conductor temperature to 90 C during normal operating condi-tions. This is supported by the Analysis JO 12241 which indicates that con-tinuously operated loads serviced by number 6 triplex power cables wrapped with more than 2. layers of siltemp tape, can increase the conductor temperature beyond 90 C.

This is a Severity Level IV violation.

(Supplement II)-

Pursuant to the provisions of 10 CFR 2.201, Duquesne Light Company is hereby

. required to' submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, i

including: (1) the. reason for the violation if admitted; (2) corrective steps

.which have'been taken.and the results achieved; (3) corrective steps which will be taken to avoid ~further violations; and (4) the date when full compliance n

will be achieved. Where good cause is shown, consideration will be given to extending this response time.

Under the authority ~of Section 182 of the Act,

'42 U.S.C 2232, the response ~shall be submitted under oath or affirmation.

ADO g2 G

l OFFICIAL RECORD COPY IR BV2 87 0003.0.0 06/12/87 i