PNO-I-87-070, on 870730,reactor Trip Occurred Due to High Pressure Signal Caused by Closure of Msiv.Caused by Air Loss Due to Leakage.Shutdown Initiated to Repair Equipment

From kanterella
Revision as of 01:08, 22 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-I-87-070:on 870730,reactor Trip Occurred Due to High Pressure Signal Caused by Closure of Msiv.Caused by Air Loss Due to Leakage.Shutdown Initiated to Repair Equipment
ML20236G390
Person / Time
Site: Oyster Creek
Issue date: 07/30/1987
From: Bateman, Blough
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-87-070, PNO-I-87-70, NUDOCS 8708040238
Download: ML20236G390 (1)


- _ _ _ _ - _ . . ___- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

DCS No: 50219870730 Date: July 30, 1987 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-I-87-70 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or.public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.

Facility: Licensee Emergency Classification:

GPU Nuclear Corporation Notification of Unusual Event Oyster Creek Nuclear Generating Station Alert Docket No. 50-219 ,_ _ Site Area Emergency Forked River, New Jersey General Emergency X Not Applicable

Subject:

REACTOR TRIP AND SHUTDOWN FOR GREATER THAN 48 HOURS A reactor trip occurred at 0456, 7/30/87, due to a high pressure signal caused by closure of a main steam isolation valve (MSIV). The MSIV closed shortly after the air supply to the valve (NS-04A) was lost due to air leakage which became evident immediately upon initiating the routine MSIV 5 percent closure test. In anticipation of the trip, operators had commenced a load reduction and were able to reduce load from full power to about 70% before the MSIV went fully closed. No relief valves lifted.

Plant response was normal and reactor water level was in control at all times. The shutdown may last three days while repairs to equipment are made. The licensee intends to issue a press release. The State of New Jersey has been informed.

CONTACT: Bateman Blough (609) 693-0717 488-1146 DISTRIBUTION:

H. St. MNBb Phillips E/W Willste Mail: ADM:DMS Chairman Zech EDO NRR NMSS DOT:Trans only Comm. Bernthal PA OIA RES

'Comm. Roberts OGC AEOD NRC Ops C:t Comm. Carr ACRS Air Rights INPO----

SECY SP NSAC----

CA POR Regional Offices TMI Resident Section RI Resident Office Licensee: ~

(Reactor Licensees)

Region I Form 83 (Rev. July 1987) l gBog38870730 I PNO-1-B7-070 PDR ,lO. [O ,