Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999
[Table view]PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power PNO-I-97-045, on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR1997-08-0404 August 1997 PNO-I-97-045:on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR PNO-I-97-024, on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem1997-04-23023 April 1997 PNO-I-97-024:on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention1997-04-10010 April 1997 PNO-I-97-022:on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention PNO-I-96-078, on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event1996-10-29029 October 1996 PNO-I-96-078:on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event PNO-I-93-006, on 930125,licensee Notified NRC That Reactor Vessel Core Temp Exceeded 212 Degrees F During Shutdown Cooling Operations.No Core Damage or Radioactive Release Occurred.Inspectors Reviewing Event.State of Nj Notified1993-01-26026 January 1993 PNO-I-93-006:on 930125,licensee Notified NRC That Reactor Vessel Core Temp Exceeded 212 Degrees F During Shutdown Cooling Operations.No Core Damage or Radioactive Release Occurred.Inspectors Reviewing Event.State of Nj Notified PNO-I-90-062, on 900806,containment Unidentified Leak Rate Exceeded Tech Spec Limit.Caused by Water Introduction Into Drywell.Licensee Began Plant Shutdown,Vented Drywell & Evaluated Plant Conditions1990-08-0707 August 1990 PNO-I-90-062:on 900806,containment Unidentified Leak Rate Exceeded Tech Spec Limit.Caused by Water Introduction Into Drywell.Licensee Began Plant Shutdown,Vented Drywell & Evaluated Plant Conditions PNO-I-89-079, on 890911,unplanned Reactor Shutdown for Greater than 48 H Due to Problems W/Emergency Diesel Generator.Drywell Entered,Leaking Feedwater Check Valve Repaired & Minor Maint Performed1989-09-12012 September 1989 PNO-I-89-079:on 890911,unplanned Reactor Shutdown for Greater than 48 H Due to Problems W/Emergency Diesel Generator.Drywell Entered,Leaking Feedwater Check Valve Repaired & Minor Maint Performed PNO-I-89-057, on 890711,plant Scram & Generator/Turbine Trip Caused by Fault in One Operable Main Transformer.Other Main Transformer Failed on 890625.Licensee Has One Replacement Transformer Onsite & Expects Installation by 8907141989-07-12012 July 1989 PNO-I-89-057:on 890711,plant Scram & Generator/Turbine Trip Caused by Fault in One Operable Main Transformer.Other Main Transformer Failed on 890625.Licensee Has One Replacement Transformer Onsite & Expects Installation by 890714 PNO-I-88-099, on 880929,steam Lines for Both a & B Isolation Condensers Partially Filled W/Water Placing Steam Lines in Potential Inoperable Condition.Plant Shutdown.Licensee Disabled Automatic Initiation Sys1988-09-29029 September 1988 PNO-I-88-099:on 880929,steam Lines for Both a & B Isolation Condensers Partially Filled W/Water Placing Steam Lines in Potential Inoperable Condition.Plant Shutdown.Licensee Disabled Automatic Initiation Sys ML20151Q0571988-08-0404 August 1988 PNS-I-88-004:on 880804,armed Guard Accidently Discharged Round from Handgun While Reholstering After Cleaning & Reloading Weapon.No One Was Injured.Guard Being Retrained & Weapon Will Be Examined by Gunsmith Before Returning to Svc PNO-I-88-072, on 880709,inboard MSIV Failed Full Closure Test.Subsequent Testing Indicated That Valve Stem May Be Separated from Valve Disc.Msiv Repair Estimated to Take 18 Days1988-07-12012 July 1988 PNO-I-88-072:on 880709,inboard MSIV Failed Full Closure Test.Subsequent Testing Indicated That Valve Stem May Be Separated from Valve Disc.Msiv Repair Estimated to Take 18 Days PNO-I-87-115, on 871211,licensee Informed NRC That Striking Intl Brotherhood of Electrical Workers Voted to Accept New Contract.Util Has Made Provisions for Retraining Returning Personnel.Strikers Started Returning on 8712131987-12-14014 December 1987 PNO-I-87-115:on 871211,licensee Informed NRC That Striking Intl Brotherhood of Electrical Workers Voted to Accept New Contract.Util Has Made Provisions for Retraining Returning Personnel.Strikers Started Returning on 871213 PNO-I-87-109, on 871118,NRC Informed by Licensee Mgt That Large Majority of Members of Intl Brotherhood of Electrical Workers Voted to Reject Contract Offer.Picket Lines May Be Set Up at Midnight.Criticality Anticipated by Early 8711191987-11-19019 November 1987 PNO-I-87-109:on 871118,NRC Informed by Licensee Mgt That Large Majority of Members of Intl Brotherhood of Electrical Workers Voted to Reject Contract Offer.Picket Lines May Be Set Up at Midnight.Criticality Anticipated by Early 871119 PNO-I-87-086B, NRC Augmented Insp Team & License Review of Event Continues.Info Critical to Evaluation of Event, Including Recovered Portions of Missing Tapes,Available.Nrc Confirms That Reactor Coolant Temp Below 140 F During Event1987-09-14014 September 1987 PNO-I-87-086B:NRC Augmented Insp Team & License Review of Event Continues.Info Critical to Evaluation of Event, Including Recovered Portions of Missing Tapes,Available.Nrc Confirms That Reactor Coolant Temp Below 140 F During Event PNO-I-87-086, on 870911,Tech Spec 2.1, Fuel Cladding Integrity, Violated.Caused by Operator Isolating One of Two Recirculation Loops in Svc Due to Leakage in Cooling Water Sys.Plant Shutdown & Three Pumps Secured1987-09-11011 September 1987 PNO-I-87-086:on 870911,Tech Spec 2.1, Fuel Cladding Integrity, Violated.Caused by Operator Isolating One of Two Recirculation Loops in Svc Due to Leakage in Cooling Water Sys.Plant Shutdown & Three Pumps Secured PNO-I-87-086A, review of Circumstances Surrounding Event Revealed That Both Inservice Recirculation Discharge Valves Started Closed & Info Printed Alarm Tapes Disposed Of. Personnel Suspended & Augmented Insp Team Assigned to Event1987-09-11011 September 1987 PNO-I-87-086A:review of Circumstances Surrounding Event Revealed That Both Inservice Recirculation Discharge Valves Started Closed & Info Printed Alarm Tapes Disposed Of. Personnel Suspended & Augmented Insp Team Assigned to Event PNO-I-87-084, on 870910,licensee Completed Planned Shutdown to Perform Maint on Main Flash Tank Manway.Drywell Entry Will Also Be Made to Repair Leaking Feedwater Isolation Valve Bonnet Pressure Seal Leak & Other Maint1987-09-10010 September 1987 PNO-I-87-084:on 870910,licensee Completed Planned Shutdown to Perform Maint on Main Flash Tank Manway.Drywell Entry Will Also Be Made to Repair Leaking Feedwater Isolation Valve Bonnet Pressure Seal Leak & Other Maint PNO-I-87-070, on 870730,reactor Trip Occurred Due to High Pressure Signal Caused by Closure of Msiv.Caused by Air Loss Due to Leakage.Shutdown Initiated to Repair Equipment1987-07-30030 July 1987 PNO-I-87-070:on 870730,reactor Trip Occurred Due to High Pressure Signal Caused by Closure of Msiv.Caused by Air Loss Due to Leakage.Shutdown Initiated to Repair Equipment PNO-I-87-034, on 870423,plant Shutdown Commenced After Investigation Determined Cause for Failure of Electromatic Relief Valve Acoustic Monitor Was Inside Drywell.Cause Will Be Determined When Drywell Accessible1987-04-24024 April 1987 PNO-I-87-034:on 870423,plant Shutdown Commenced After Investigation Determined Cause for Failure of Electromatic Relief Valve Acoustic Monitor Was Inside Drywell.Cause Will Be Determined When Drywell Accessible PNO-I-87-011, on 870214,reactor Scram Occurred from 100% Power Due to Turbine Trip Which Resulted from Reactor High Water Level Condition.Caused by Technician Disturbing Lead in Level Control Sys.Plant Taken to Cold Shutdown1987-02-17017 February 1987 PNO-I-87-011:on 870214,reactor Scram Occurred from 100% Power Due to Turbine Trip Which Resulted from Reactor High Water Level Condition.Caused by Technician Disturbing Lead in Level Control Sys.Plant Taken to Cold Shutdown PNO-I-87-008, on 870210,presence of Radioactivity in Feedpump Room Identified.Possibly Caused by Leak at Offgas Sample Pump or Flow Meter.Three Workers Received Minor Skin Contamination.Efforts to Locate & Repair Leak Underway1987-02-10010 February 1987 PNO-I-87-008:on 870210,presence of Radioactivity in Feedpump Room Identified.Possibly Caused by Leak at Offgas Sample Pump or Flow Meter.Three Workers Received Minor Skin Contamination.Efforts to Locate & Repair Leak Underway PNO-I-87-004, on 870126,radioactive Water Discovered Leaking from Condensate Storage Tank (Cst).Caused by Cracked CST 4-inch Drain Valve Unisolable from Cst.Water Being Recycled Until Source of Leak Repaired1987-01-27027 January 1987 PNO-I-87-004:on 870126,radioactive Water Discovered Leaking from Condensate Storage Tank (Cst).Caused by Cracked CST 4-inch Drain Valve Unisolable from Cst.Water Being Recycled Until Source of Leak Repaired PNO-I-86-100, on 861230,steam Leak Identified from Bellows Connection at Main Condenser.Power Reduced to Less than 5% & Reactor Manually Tripped.Insp Showed That Gross Failure of Bellows Occurred.Unit Shut Down for 1 Wk to Replace Bellows1986-12-30030 December 1986 PNO-I-86-100:on 861230,steam Leak Identified from Bellows Connection at Main Condenser.Power Reduced to Less than 5% & Reactor Manually Tripped.Insp Showed That Gross Failure of Bellows Occurred.Unit Shut Down for 1 Wk to Replace Bellows PNO-I-86-094, on 861120 & 26,ultrasonic Measurements of Drywell Wall Indicated Areas of Reduced Thickness.Caused by Wet Sand Due to Bellow Leakage During Refueling. Investigation Continuing1986-11-26026 November 1986 PNO-I-86-094:on 861120 & 26,ultrasonic Measurements of Drywell Wall Indicated Areas of Reduced Thickness.Caused by Wet Sand Due to Bellow Leakage During Refueling. Investigation Continuing ML20213G4231986-10-31031 October 1986 PNS-I-86-021:on 861030,util Supervisor Suspected Smell of Marijuana Smoke While Touring Bldg Located Inside Protected Area of Plant & Radiation Control Area.White Powdery Substance Confiscated from Laborer PNO-I-86-081, on 860930,foreman for Schneider Power Corp Alleged That Qualified Welder Assisted Welding of Test Coupon by Another Welder Undergoing Qualification.Both Welders Fired.Licensee Investigating Action1986-10-0808 October 1986 PNO-I-86-081:on 860930,foreman for Schneider Power Corp Alleged That Qualified Welder Assisted Welding of Test Coupon by Another Welder Undergoing Qualification.Both Welders Fired.Licensee Investigating Action PNO-I-86-072A, investigation of Alleged Offsite Drug Use by Two Operations Dept Personnel Led to Termination of Employment.Press Release Issued on 861001 & Region I Responding to Media Inquiries1986-10-0202 October 1986 PNO-I-86-072A:investigation of Alleged Offsite Drug Use by Two Operations Dept Personnel Led to Termination of Employment.Press Release Issued on 861001 & Region I Responding to Media Inquiries PNO-I-86-072, licensee Suspended Site Access to Senior Reactor Operator & Shift Clerk,Due to Third Party Allegations Re Drug Use.Urine Samples Sent to Lab for Analysis & Actions Monitored.Investigation Continuing1986-09-11011 September 1986 PNO-I-86-072:licensee Suspended Site Access to Senior Reactor Operator & Shift Clerk,Due to Third Party Allegations Re Drug Use.Urine Samples Sent to Lab for Analysis & Actions Monitored.Investigation Continuing PNO-I-86-069A, on 860904,technician Found Carrying Five Contaminated one-dollar Bills from Local Bank.Cause of Contamination Undetermined.No Radioactivity Detected on Technician & Family on 8609041986-09-0909 September 1986 PNO-I-86-069A:on 860904,technician Found Carrying Five Contaminated one-dollar Bills from Local Bank.Cause of Contamination Undetermined.No Radioactivity Detected on Technician & Family on 860904 PNO-I-86-069, on 860904,I-131 Contaminated Money Found on Health Physics Technician.Plant Not Source of Contamination. Money Received from Bank in Barnegat,Nj.Patients Treated at Area Hosps Authorized to Use I-131 Being Contacted1986-09-0404 September 1986 PNO-I-86-069:on 860904,I-131 Contaminated Money Found on Health Physics Technician.Plant Not Source of Contamination. Money Received from Bank in Barnegat,Nj.Patients Treated at Area Hosps Authorized to Use I-131 Being Contacted ML20210E0261986-03-25025 March 1986 PNS-I-86-004:on 860324,bomb Threat Received at Plant.Bomb Threat Procedures Implemented & Unusual Event Declared. Search of Accessible Vital,Protected & owner-controlled Areas Had Negative Results PNO-I-86-004, on 860117,nine Plant Workers Contaminated w/short-lived Rb-88 & Cs-138.Caused by Buildup of Gases in Offgas Bldg After Offgas Sys Shut Down for Maint.Slight Radioactivity Detected at Bldg Vent1986-01-17017 January 1986 PNO-I-86-004:on 860117,nine Plant Workers Contaminated w/short-lived Rb-88 & Cs-138.Caused by Buildup of Gases in Offgas Bldg After Offgas Sys Shut Down for Maint.Slight Radioactivity Detected at Bldg Vent PNO-I-85-087, on 851120,reactor Scram Occurred Due to Main Generator Trip Causing Main Turbine Trip.After Scram,Main Steam Lines Isolated.Plant Brought to Cold Shutdown.Operator Manually Initiated Isolation Condenser1985-11-20020 November 1985 PNO-I-85-087:on 851120,reactor Scram Occurred Due to Main Generator Trip Causing Main Turbine Trip.After Scram,Main Steam Lines Isolated.Plant Brought to Cold Shutdown.Operator Manually Initiated Isolation Condenser PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%1985-09-27027 September 1985 PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% PNO-I-85-052, on 850722,reactor Shutdown Initiated as Result of Degradation of Emergency Svc Water Sys.Caused by HX Differential Pressure Problems.Use of Television Camera to Examine Inner Pipe Wall Planned1985-07-23023 July 1985 PNO-I-85-052:on 850722,reactor Shutdown Initiated as Result of Degradation of Emergency Svc Water Sys.Caused by HX Differential Pressure Problems.Use of Television Camera to Examine Inner Pipe Wall Planned PNO-I-85-042, on 850612,during Recovery Process Following Reactor Trip,Reactor Bldg Deluge Fire Protection Sys Initiated.Caused by Smoke from Hot Blistering Paint on Scram Discharge Vol Piping.Reactor Currently in Cold Shutdown1985-06-13013 June 1985 PNO-I-85-042:on 850612,during Recovery Process Following Reactor Trip,Reactor Bldg Deluge Fire Protection Sys Initiated.Caused by Smoke from Hot Blistering Paint on Scram Discharge Vol Piping.Reactor Currently in Cold Shutdown PNO-I-82-046, on 820611,plugged Vent Filter Caused Backflow of Condensate Water & Resin Beads Into Svc Air Sys in New Radwaste Facility1982-06-22022 June 1982 PNO-I-82-046:on 820611,plugged Vent Filter Caused Backflow of Condensate Water & Resin Beads Into Svc Air Sys in New Radwaste Facility PNO-I-80-130A, Ocean County,Nj Radiological Officer Conducted Radiation Survey of Landfill Due to Rumors of Radwaste Dumping.No Abnormal Activity Levels Were Detected1980-09-17017 September 1980 PNO-I-80-130A:Ocean County,Nj Radiological Officer Conducted Radiation Survey of Landfill Due to Rumors of Radwaste Dumping.No Abnormal Activity Levels Were Detected ML20062J3371980-09-16016 September 1980 PNO-TMI-80-045:on 800915,NRC Approved Major Changes in Organization Which Establishes General Public Utils Nuclear Group & Which Includes Revised Plant Staff Organizations PNO-I-80-051, on 800328,licensee Reported That Core Spray Sys Sparger Insp Found 28 New Cracks.Proposed Repairs Include Installation of Clamps1980-03-31031 March 1980 PNO-I-80-051:on 800328,licensee Reported That Core Spray Sys Sparger Insp Found 28 New Cracks.Proposed Repairs Include Installation of Clamps PNO-I-80-034A, on 800302,two Individuals Were Exposed to Co-60.Deposition Calculated in Lungs & Lower Large Intestine within Allowable Quarterly & Lifetime Limits.No Future Action Anticipated1980-03-0505 March 1980 PNO-I-80-034A:on 800302,two Individuals Were Exposed to Co-60.Deposition Calculated in Lungs & Lower Large Intestine within Allowable Quarterly & Lifetime Limits.No Future Action Anticipated PNO-I-80-034, on 800302,two Individuals Showed Significant Whole Body Counts of Co-60.Licensee Review Indicated Exposure Occurred While Wiping Down Control Rod Blade Tool W/No Respiratory Protection1980-03-0303 March 1980 PNO-I-80-034:on 800302,two Individuals Showed Significant Whole Body Counts of Co-60.Licensee Review Indicated Exposure Occurred While Wiping Down Control Rod Blade Tool W/No Respiratory Protection PNO-I-80-026, on 800125,27 & 0213,pinhole Leaks Found in Transfer Pipe from Condensate Storage Tank During Insp of Pipe.Contaminated Soil Was Removed & Pipe Replaced.Media Interest Expected1980-02-14014 February 1980 PNO-I-80-026:on 800125,27 & 0213,pinhole Leaks Found in Transfer Pipe from Condensate Storage Tank During Insp of Pipe.Contaminated Soil Was Removed & Pipe Replaced.Media Interest Expected ML20216K0561978-10-18018 October 1978 PNO-78-177:during Performance of Inservice Insp of Sys II Core Spray Sparger,Circumferential Crack Identified by Tv Camera.Plant in Refueling Outage,Extent of Delay on Resumption of Operation,Unknown.Region I Inspector on Site ML20249A5801978-10-16016 October 1978 PNS-78-050:on 781015,Lacy Township,New Jersey Police Received Telcon from Unidentified Male Stating Two Men Would Try to Detonate Bomb at Oyster Creek Facility.Police Assisted in Search.No Bomb Found ML20248K9541978-03-17017 March 1978 PNO-78-052:on 780317,licensee Reported That Detonation in Aog Sys Took Place.No Injuries or Releases Occurred from Event.State of Nj Informed ML20151U5561977-06-13013 June 1977 PNO-77-101:on 770610,four Significant Crack Indications Were Identified.Licensee in Process of Removing Cladding & Will Examine Affected Areas for Possible Cracks Which May Have Penetrated Base Metal.State of New Jersey Informed ML20236F4891976-04-27027 April 1976 PNS-76-015:news Media Representative Informed Region I Ofc That He Gained Access to Protected Area at Plant Unchallenged on 760426 While Guards Checking Property Passes & Equipment ML20249B3381976-04-0808 April 1976 PNO-76-068:on 760407,during Insp of Suppression Pool (Torus) supports,31 of 40 Hold Down Nuts Were Found Backed Off Studs.Licensee Developing Procedure to Tighten Nuts in Question to Specified Torque.State of Nj Informed 1999-09-16 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARPNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999
[Table view]PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000219/19980121999-03-0404 March 1999 Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items IR 05000219/19980091998-11-25025 November 1998 Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20196C6071998-11-25025 November 1998 Notice of Violation from Insp on 980914-1025.Violation Noted:On 981014,security Force Vehicle Escort Left Non licensee-designated Vehicle Unattended in Protected Area & Failed to Ensure That Vehicle Ignition Locked & Key Removed IR 05000219/19980081998-10-20020 October 1998 Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19980051998-08-26026 August 1998 Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000219/19980991998-07-17017 July 1998 SALP Rept 50-219/98-99 for 961201-980613 IR 05000219/19980071998-07-0202 July 1998 Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 ML20249B3661998-06-15015 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Prior to 980304, Licensee Failed to Establish Adequate Design Control Measures to Verify Adequacy of Design Voltage ML20237E4491998-06-10010 June 1998 EN-98-047:on 980615,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Inoperability of Three of Five Automatic Depressurization Valves ML20217F6641998-04-22022 April 1998 Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering ML20217F6491998-04-22022 April 1998 Notice of Violation from Insp on 980223-0313 & 0330-0402. Violations Noted:On 980226,seismic Deficiency W/Containment Spray Heat Exchanger,That Had Been Identified in Late 1996 by Licensee,Had Not Been Adequately Corrected ML20216H1911998-04-15015 April 1998 Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20216H1701998-04-15015 April 1998 Notice of Violation from Insp on 980226-0318.Violations Noted:Since Initial Plant Operation,Operators Implemented Procedure 307,isolation Condenser Sys,Permitting Fill & Make Up to Isolation Condensers During Normal Plant Operations ML20216J0181998-04-14014 April 1998 Notice of Violation from Insp on 971229-980208.Violation Noted:Written SE Was Not Performed to Provide Bases for Determination That Change in Facility as Described in SAR Did Not Involve USQ IR 05000219/19970081997-12-0404 December 1997 Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan ML20199G7881997-11-17017 November 1997 Notice of Violation from Insp on 970707-970824.Violation Noted:In Oct 1993,vendor Specification for Emergency Svc Water Pump Bowl Assemblies Was Changed from Cast Iron to Stainless Steel PNO-I-97-045, on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR1997-08-0404 August 1997 PNO-I-97-045:on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR IR 05000219/19970041997-07-29029 July 1997 Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000219/19970051997-07-17017 July 1997 Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering ML20141G9431997-07-0303 July 1997 Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20141G9401997-07-0303 July 1997 Notice of Violation from Insp on 970414-0525.Violation Noted:On 970423,CROs Placed a & B Loops of Shutdown Cooling Sys in Svc W/O Placing Suction Pressure Interlocks in Svc for a & B Pumps by Opening Ps Isolation Valves IR 05000219/19970021997-05-19019 May 1997 Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20141J5221997-05-19019 May 1997 Notice of Violation from Insp on 970224-0413.Violation Noted:Permanent Change,Dec 95,made to Facility,As Described in SAR Involving Removal of Isolation Condenser Radiation Monitors W/O Considering All Relevant Portions of SAR PNO-I-97-024, on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem1997-04-23023 April 1997 PNO-I-97-024:on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention1997-04-10010 April 1997 PNO-I-97-022:on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention ML20137E9411997-03-21021 March 1997 Notice of Violation from Insp on 970113-0223.Violation Noted:Procedure 108.7, Lockout/Tagout Procedure, Rev 4, Did Not Include Appropriate Quantitative or Qualitative Acceptance Criteria ML20137E9491997-03-21021 March 1997 Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19960991997-01-0909 January 1997 SALP Rept 50-219/96-99 for Oyster Creek Nuclear Generating Station for 950625-961130 ML20133D6781997-01-0202 January 1997 Notice of Violation from Insp on 961021-1201.Violation Noted:Written Safety Evaluation Was Not Performed to Provide Bases for Determination That Change to Station Procedure 336.3 Did Not Involve Unreviewed Safety Question PNO-I-96-078, on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event1996-10-29029 October 1996 PNO-I-96-078:on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event IR 05000219/19960101996-09-27027 September 1996 Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program IR 05000219/19960111996-01-0202 January 1996 Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000219/19920991994-01-26026 January 1994 SALP Rept 50-219/92-99 for Period 920719-931211 ML20059B6331993-12-23023 December 1993 Notice of Violation from Insp on 930927-1015.Violation Noted:All NRC Violations & Ten Licensee Event Repts Issued in 1992 & 1993 Did Not Receive Required Independent Safety Reviews IR 05000219/19930811993-12-22022 December 1993 Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions IR 05000219/19930261993-11-18018 November 1993 Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles IR 05000219/19930241993-11-18018 November 1993 Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification ML20058A3791993-11-12012 November 1993 Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise IR 05000219/19930251993-11-0909 November 1993 Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support ML20059M3211993-11-0909 November 1993 EN-93-081A:on 930812,notice of Proposed Imposition of Civil Penalty in Amount of $75,000 Issued to Licensee.Action Based on Five Radiological Controls Violations ML20059F6251993-10-28028 October 1993 Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event IR 05000219/19930181993-10-28028 October 1993 Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing IR 05000219/19930201993-10-19019 October 1993 Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits ML20059A2201993-10-15015 October 1993 Notice of Violation from Insp on 920719-0825.Violation Noted:Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects IR 05000219/19930211993-10-15015 October 1993 Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000219/19930171993-09-14014 September 1993 Exam Rept 50-219/93-17OL on 930810-12.Exam Results:All 16 Licensed Operators Passed All Portions of Exam That Was Administered & All Three Crews Performed Satisfactorily in Simulator ML20149D5021993-09-13013 September 1993 Notice of Violation from Insp on 930629-0809.Violation Noted:On 930709,NRC Identified Condition Adverse to Quality That Had Existed Since 920709 IR 05000219/19930111993-09-10010 September 1993 Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities ML20149D7051993-09-10010 September 1993 Notice of Violation from Insp on 930816-20.Violation Noted: as of 930820,appropriate Measures Were Not Established to Assure Adequate Quality Was Suitably Included in Documents for Procurement of Svcs 1999-09-16 |
Text
DCS: 50-219/860324 Date: March 25, 1986 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNS-I-86-04 This preliminary notification. constitutes EARLY notice of events of POSSIBLE. safety or public interest significance. The information is as initially received without
. verification or evaluation, and is basically all that is known.by the Region I staff on this date.
Facility: GPU Nuclear Corporation Licensee Emergency Classification:
Oyster Creek Nuclear Generating Sta. X Notification of Unusual Event Forked River, New Jersey Alert (D/N50-219) Site Area Emergency General Emergency Not Applicable
Subject:
BOMB THREAT At 4:35 p.m., on March 24, 1986, the station telephone operator received an outside call from a young male caller who stated, " Bomb planted 305," and hung up. The telephone operator notified the security shift commander and bomb threat procedures were implemented at approximately 4:40 p.m. The licensee then declared an Unusual Event at 4:55 p.m. A search was conducted of accessible vital areas, the protected area, and the owner controlled area. The searches were complete at approximately 6:20 p.m. with negative results. The Unusual Event was terminated at 6:24 p.m.
Lacey Township Police, Ocean Township Police, New Jersey State Police, Federal Bureau of Investigation, and the explosive ordinance disposal detachment at Fort Dix, New Jersey were notified by the licensee.
The NRC Operations Center was notified at 5:05 p.m. via the ENS telephone.
The NRC's IAT and the State of New Jersey have been informed.
This PNS is current as of 9:00 a.m., March 25, 1986.
- CONTACT
- J. Dunlap J. Joyner 488-1309 488-1255 DISTRIBUTION:
H. St. MNBB Phillips E/W Willste Mail: ADM:DMB Chairman Palladino EDO NRR IE NMSS DOT:Trans only Comm. Zech PA OIA RES Comm. Bernthal MPA AE0D Comm. Roberts ELD Comm. Asselstine -
ACRS Air Rights INP0 9-* I SECY SP NSAC U ^ I CA PDR Regional Offices TMI Resident Section \'33 RI Resident Office 1: 3o 1
Licensee:
(ReactorLicensees) 8603270164 060325
-1 -004 PDR t f.3q6 l