Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluation, Final Staggered Request for Additional Information
ML20280A741
Person / Time
Site: 07201032
Issue date: 11/06/2020
From: Santos N
Storage and Transportation Licensing Branch
To: O'Mullane C
Holtec
NGSantos NMSS/DFM/FFL 301.415.6999
Shared Package
ML20280A740 List:
References
EPID L-2019-LLA-0231
Download: ML20280A741 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 6, 2020 Christopher OMullane Licensing Engineer Holtec International Holtec Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

SUBJECT:

APPLICATION FOR THE MODEL NO. HI-STORM FW STORAGE SYSTEM, AMENDMENT NO. 6 - FINAL STAGGERED REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. OMullane:

By letter dated October 2, 2019 [Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML19282C357], and as supplemented on June 30, 2020 (ADAMS Package Accession No. ML20182A860), Holtec International (the applicant) requested to amend Certificate of Compliance (CoC) No. 1032, Model No. HI-STORM FW Storage System. The applicant proposes the following changes:

1) Adding an anchored configuration of the HI-STORM FW storage system.
2) Allowing non-single failure proof lifting equipment during handling of heavy loads processes (within the 10 CFR Part 72 jurisdictional boundary).
3) Revising LCO 3.1.2, SFSC Heat Removal System Operability, to allow an engineering evaluation to be performed in lieu of transferring the multi-purpose canister (MPC) into a transfer cask.
4) No longer require the annual submittal of a separate radioactive effluent report for the HI-STORM FW system.
5) For the MPC models MPC-37, -89, and -32ML, revise the following:
a. the allowable contents to clarify the requirements for fuel debris permitted for storage, and
b. the basket Design Features to clarify that the minimum cell inside dimension (ID) and minimum cell wall thickness are nominal dimensions.

The staff is issuing a final staggered request for additional information (RAI). The staff issued the first staggered RAI on September 24, 2020 (ADAMS Accession No. ML20267A166). In connection with our review, we need the information identified in the enclosure to this letter.

The enclosure contains only the questions related to the structural and materials evaluation.

Additional information requested by this letter should be submitted in the form of revised safety analysis report pages, when applicable. Please provide your complete responses to both requests for additional information within the same submittal. To assist us in scheduling, the staff review of your response, we request that you provide this information 45 calendar days from the date of this letter. Inform us at your earliest convenience, but no later than 15 days

C. OMullane from the date of this letter, if you are not able to provide the information by the timeline specified in this letter. If you are unable to provide a response 45 calendar days from the date of this letter, our review may be delayed.

Please reference Docket No. 72-1032 and EPID No. L-2019-LLA-0231 in future correspondence related to this request. The staff is available to meet and discuss your proposed responses. If you have any questions regarding this matter, I may be contacted at Norma.GarciaSantos@nrc.gov.

Sincerely, Norma Garcia Digitally signed by Norma Garcia Santos Santos Date: 2020.11.06 06:02:00 -05'00' Norma García Santos, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-1032 EPID No. L-2019-LLA-0231

Enclosure:

Final Staggered RAI