MONTHYEARML20140A1912020-05-19019 May 2020 Application for the Model No. Hi-Storm FW: Storage System, Amendment No. 6 - Supplemental Information Needed Project stage: Other ML20182A8622020-06-30030 June 2020 Responses to HI-STORM FW Amd. 6 Requests for Supplemental Information Project stage: Supplement ML20182A8632020-06-30030 June 2020 Attachment 1: HI-STORM FW Amendment 6 Rsi Responses Project stage: Other ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes Project stage: Other ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes Project stage: Other ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes Project stage: Other ML20182A8702020-06-30030 June 2020 Attachment 8 - Affidavit Project stage: Other ML20205L5972020-08-10010 August 2020 Transmittal Letter: Application for the Model Hi-Storm FW Storage System, Amendment No. 6 - Accepted for Review Project stage: Other ML20267A1662020-09-24024 September 2020 Transmittal Letter and Rais: Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Staggered First Request for Additional Information, Thermal Evaluation Project stage: RAI ML20315A0172020-10-31031 October 2020 Fuelsolutions Spent Fuel Management System Certificate of Compliance Renewal Application Project stage: Other ML20280A7412020-11-0606 November 2020 Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluation, Final Staggered Request for Additional Information Project stage: RAI ML20280A7432020-11-0606 November 2020 Enclosure (Rais) to Transmittal Letter: Application for the Model No. Historm FW, Amendment 6 - Structural and Materials Evaluations, Final Staggered Request for Additional Information Project stage: RAI ML20356A3322020-12-21021 December 2020 Attachment 4 - Acceptance Tests and Maintenance Project stage: Other ML20356A3362020-12-21021 December 2020 Affidavit for Kimberly Manzione Project stage: Other ML20356A3302020-12-21021 December 2020 Attachment 2 - SFSC Heat Removal System Project stage: Other ML20356A3292020-12-21021 December 2020 Attachment 1 - Responses to Request for Additional Information Certificate of Compliance No. 1032 Docket No. 72-1032 HI-STORM FW Storage System Amendment No. 6 Project stage: Response to RAI ML20356A3282020-12-21021 December 2020 International Responses to HI-STORM FW Amd. 6 Requests for Additional Information Project stage: Other ML21146A0962021-07-0202 July 2021 Application for the Westinghouse Sentry Dry Storage Cask System, Certificate of Compliance No. 1026, Amendment No. 5 - Request for Additional Information Project stage: RAI ML21214A1322021-08-0202 August 2021 International, Supplemental Responses to HI-STORM FW Amendment 6 Requests for Additional Information Project stage: Supplement ML21333A1392021-11-29029 November 2021 Attachment 1 - HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (Non-Proprietary) Project stage: Supplement ML21333A1382021-11-29029 November 2021 International Revised Supplemental Responses for HI-STORM FW Amd. 6 Requests for Additional Information Project stage: Supplement ML21333A1412021-11-29029 November 2021 Attachment 3 - HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (Non-Proprietary) Project stage: Other ML21333A1422021-11-29029 November 2021 Attachment 4 - HI-STORM FW Amendment 6 CoC, Appendix a - Revised November 29, 2021 (Non-Proprietary) Project stage: Other ML21333A1432021-11-29029 November 2021 Attachment 5 - Affidavit of Kimberly Manzione Project stage: Other ML22145A4072022-10-13013 October 2022 User Need Memorandum for Rulemaking for the Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 Project stage: Other ML22145A3132022-10-13013 October 2022, 9 December 2022 Rulemaking Package: Certificate of Compliance No. 1032, Amendment 6, Model No. HI-STORM FW Project stage: Request ML22290A1472022-11-0808 November 2022 Approval of Holtec International Request Withholding Information from Public Disclosure of the Application for Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 (Docket No. 72-1032) Project stage: Other ML22145A4082022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 1: Draft Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4092022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 2: Draft Appendix a, Technical Specifications, Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4102022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 3: Draft Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Draft Other ML22145A4112022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 4: Preliminary Safety Evaluation Report, Certificate of Compliance. No, 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Approval ML23041A4692023-02-15015 February 2023 Enclosure 3 - Final Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4702023-02-15015 February 2023 Enclosure 4 - Final Safety Evaluation Report, Certificate of Compliance. No, 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Approval ML23041A4682023-02-15015 February 2023 Enclosure 2 - Final Appendix a, Technical Specifications, Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML23041A4662023-02-15015 February 2023 Amendment No. 6 to Certificate of Compliance No. 1032 for the Holtec International Storage Module (Hi-Storm) Flood and Wind (FW) Multipurpose Canister (MPC) Storage System (Docket No. 72-1032, CAC No. 001028, EPID: L-2019-LLA-0231) Project stage: Other 2020-09-24
[Table View] |
|
---|
Category:License-Dry Cask
MONTHYEARML24199A2382024-08-13013 August 2024 Enclosure 1 - Certificate of Compliance No. 1032, Amendment 7 ML24199A2402024-08-13013 August 2024 Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B ML23030B7932024-06-27027 June 2024 2. Proposed Certificate of Compliance No. 1032, Amendment 7 ML23030B7952024-06-27027 June 2024 4. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix B ML24002B1332024-01-0404 January 2024 07. FW A9 Proposed Appendix a ML24002B1342024-01-0404 January 2024 08. FW A9 Proposed Appendix B ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22242A2152022-09-0606 September 2022 Amendment No. 8 Certificate of Compliance No. 1032 ML22242A2172022-09-0606 September 2022 Amendment No. 8 TS, Appendix B ML22019A1302022-04-25025 April 2022 HI-STORM FW Amendment 8 Proposed Certificate of Compliance ML21288A5352021-10-15015 October 2021 Attachment 12: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix a Reorganization ML21288A5342021-10-15015 October 2021 Attachment 11: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization ML21237A1762021-08-25025 August 2021 Request for Supplemental Information Re Holtec Intl HI-STORM Flood/Wind Multipurpose Canister Storage System, Coc No. 1032, Amendment 7 ML21126A2692021-05-0606 May 2021 Attachment 2 - HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1922020-08-12012 August 2020 Attachment 2: HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1942020-08-12012 August 2020 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes ML20163A7032020-06-25025 June 2020 Certificate of Compliance No. 1032 Amendment No. 5 ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a ML20052D7912020-02-0707 February 2020 Attachment 2 - Proposed CoC Pages - (Non-Proprietary) ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel ML16323A0152016-11-17017 November 2016 Registration of Spent Fuel Storage Cask Dated 11/17/2016 ML16309A1972016-11-0404 November 2016 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) 2024-08-13
[Table view] Category:ISFSI
MONTHYEARML24199A2382024-08-13013 August 2024 Enclosure 1 - Certificate of Compliance No. 1032, Amendment 7 ML24199A2402024-08-13013 August 2024 Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B ML23030B7932024-06-27027 June 2024 2. Proposed Certificate of Compliance No. 1032, Amendment 7 ML23030B7952024-06-27027 June 2024 4. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix B ML24002B1332024-01-0404 January 2024 07. FW A9 Proposed Appendix a ML24002B1342024-01-0404 January 2024 08. FW A9 Proposed Appendix B ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22242A2152022-09-0606 September 2022 Amendment No. 8 Certificate of Compliance No. 1032 ML22242A2172022-09-0606 September 2022 Amendment No. 8 TS, Appendix B ML22019A1302022-04-25025 April 2022 HI-STORM FW Amendment 8 Proposed Certificate of Compliance ML21288A5352021-10-15015 October 2021 Attachment 12: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix a Reorganization ML21288A5342021-10-15015 October 2021 Attachment 11: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization ML21237A1762021-08-25025 August 2021 Request for Supplemental Information Re Holtec Intl HI-STORM Flood/Wind Multipurpose Canister Storage System, Coc No. 1032, Amendment 7 ML21126A2692021-05-0606 May 2021 Attachment 2 - HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1922020-08-12012 August 2020 Attachment 2: HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1942020-08-12012 August 2020 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes ML20163A7032020-06-25025 June 2020 Certificate of Compliance No. 1032 Amendment No. 5 ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a ML20052D7912020-02-0707 February 2020 Attachment 2 - Proposed CoC Pages - (Non-Proprietary) ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel ML16323A0152016-11-17017 November 2016 Registration of Spent Fuel Storage Cask Dated 11/17/2016 ML16309A1972016-11-0404 November 2016 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) 2024-08-13
[Table view] Category:(Amend) DKT 72
MONTHYEARML24199A2382024-08-13013 August 2024 Enclosure 1 - Certificate of Compliance No. 1032, Amendment 7 ML24199A2402024-08-13013 August 2024 Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B ML23030B7932024-06-27027 June 2024 2. Proposed Certificate of Compliance No. 1032, Amendment 7 ML23030B7952024-06-27027 June 2024 4. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix B ML24002B1332024-01-0404 January 2024 07. FW A9 Proposed Appendix a ML24002B1342024-01-0404 January 2024 08. FW A9 Proposed Appendix B ML23041A4672023-02-15015 February 2023 Enclosure 1 - Final Certificate of Compliance No. 1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22145A4102022-12-0909 December 2022 Rulemaking Memorandum, Enclosure 3: Draft Appendix B, Technical Specifications, Approved Contents and Design Features, CoC No.1032, Amendment No. 6, HI-STORM Flood/Wind Multipurpose Canister Storage System ML22242A2152022-09-0606 September 2022 Amendment No. 8 Certificate of Compliance No. 1032 ML22242A2172022-09-0606 September 2022 Amendment No. 8 TS, Appendix B ML22019A1302022-04-25025 April 2022 HI-STORM FW Amendment 8 Proposed Certificate of Compliance ML21126A2692021-05-0606 May 2021 Attachment 2 - HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1922020-08-12012 August 2020 Attachment 2: HI-STORM FW Amendment 7 Certificate of Compliance ML20225A1942020-08-12012 August 2020 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B ML20182A8662020-06-30030 June 2020 Attachment 4: HI-STORM FW Amendment 6 CoC, Appendix B - RSI-Related Changes ML20182A8642020-06-30030 June 2020 Attachment 2: HI-STORM FW Amendment 6 CoC - RSI-Related Changes ML20182A8652020-06-30030 June 2020 Attachment 3 - HI-STORM FW Amendment 6 CoC, Appendix a - RSI-Related Changes ML20163A7032020-06-25025 June 2020 Certificate of Compliance No. 1032 Amendment No. 5 ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B ML20052D7912020-02-0707 February 2020 Attachment 2 - Proposed CoC Pages - (Non-Proprietary) ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel ML16323A0152016-11-17017 November 2016 Registration of Spent Fuel Storage Cask Dated 11/17/2016 ML16309A1972016-11-0404 November 2016 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) 2024-08-13
[Table view] |
Text
ATTACHMENT 2 TO HOLTEC LETTER 5018078 NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (3-1999) 10 CFR 72 CERTIFICATE OF COMPLIANCE Certificate No. 1032 FOR SPENT FUEL STORAGE CASKS Amendment No. 65 Supplemental Sheet Page 2 of 4 DESCRIPTION (continued)
There are three types of MPCs: the MPC-37, MPC-89 and MPC-32ML. The number suffix indicates the maximum number of fuel assemblies permitted to be loaded in the MPC. All MPC models have the same external diameter.
The HI-TRAC VW transfer cask provides shielding and structural protection of the MPC during loading, unloading, and movement of the MPC from the cask loading area to the storage overpack. The transfer cask is a multi-walled (carbon steel/lead/carbon steel) cylindrical vessel with a neutron shield jacket or neutron shield cylinder attached to the exterior and a retractable bottom lid used during transfer operations.
The HI-STORM FW storage overpack provides shielding and structural protection of the MPC during storage.
The overpack is a heavy-walled steel and concrete, cylindrical vessel. Its side wall consists of plain (un-reinforced) concrete that is enclosed between inner and outer carbon steel shells. The overpack has air inlets at the bottom and air outlets at the top to allow air to circulate naturally through the cavity to cool the stored MPC. The inner shell has supports attached to its interior surface to guide the MPC during insertion and removal and provide a means to protect the MPC confinement boundary against impactive or impulsive loadings. A loaded MPC is stored within the HI-STORM FW storage overpack in a vertical orientation. The HI-STORM FW storage overpack can be arrayed in a free-standing or anchored configuration.
CONDITIONS
- 1. OPERATING PROCEDURES Written operating procedures shall be prepared for handling, loading, movement, surveillance, and maintenance. The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 9 of the FSAR.
- 2. ACCEPTANCE TESTS AND MAINTENANCE PROGRAM Written acceptance tests and a maintenance program shall be prepared consistent with the technical basis described in Chapter 10 of the FSAR. At completion of welding the MPC shell to baseplate, an MPC confinement weld helium leak test shall be performed using a helium mass spectrometer. The confinement boundary welds leakage rate test shall be performed in accordance with ANSI N14.5 to leaktight criterion. If a leakage rate exceeding the acceptance criteria is detected, then the area of leakage shall be determined and the area repaired per ASME Code Section III, Subsection NB, Article NB-4450 requirements. Re-testing shall be performed until the leakage rate acceptance criterion is met.
- 3. QUALITY ASSURANCE Activities in the areas of design, purchase, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning that are important-to-safety shall be conducted in accordance with a Commission-approved quality assurance program which satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and which is established, maintained, and executed with regard to the storage system
- 4. HEAVY LOADS REQUIREMENTS Each lift of an MPC, a HI-TRAC VW transfer cask, or any HI-STORM FW overpack must be made in accordance to the existing heavy loads requirements and procedures of the licensed facility at which the lift is made. A plant-specific review of the heavy load handling procedures (under 10 CFR 50.59 or 10 CFR 72.48, as applicable) is required to show operational compliance with existing plant specific heavy loads requirements.
Lifting operations outside of structures governed by 10 CFR Part 50 must be in accordance with Section 5.2 of Appendix A and Section 3.4.7 of Appendix B.
1 of 1