Letter Sequence RAI |
|---|
CAC:01028, (Approved, Closed) EPID:L-2017-LLA-0030, Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (Approved, Closed) |
|
MONTHYEARML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18060A3322018-02-28028 February 2018 Enclosurequest for Additional Request (Request for Additional Information Regarding GE-Hitachis Decommissioning Funding Plan Update for Morris ISFSI) Project stage: RAI ML18117A4722018-04-27027 April 2018 International - HI-STORM FW Amendment 4 Response to Request for Additional Information Project stage: Response to RAI ML18115A3792018-05-21021 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2 Request for Additional Information Related to License Amendment Request to Incorporate New Technical Specification for Unbalanced Voltage Relays Project stage: RAI ML18166A0032018-06-0808 June 2018 Submittal of License Application Revision 2 and Request to Restart Review of Application for Approval of the WCS CISF Project stage: Request ML18208A6372018-07-27027 July 2018 Supplement to HI-STORM FW Amendment 4 RAIs Responses Project stage: Request ML18291B2292018-10-17017 October 2018 Memorandum to M. Layton Summary of Sept. 12, 2018, Meeting with Holtec International, Inc. to Discuss the Upcoming Submittal of the Application for Renewal If the Storage Certificate of Compliance No. 1008 for the HI-STAR 100 Cask System Project stage: Request ML18291B0812018-10-17017 October 2018 Summary of Meeting with Holtec International, Inc. to Discuss the Upcoming Submittal of the Application for Renewal If the Storage Certificate of Compliance No. 1008 for the HI-STAR 100 Cask System Project stage: Meeting ML18360A0052018-12-26026 December 2018 Letter to J. Isakson Approval of Interim Storage Partners Request for Withholding Information from Public Disclosure - Waste Control Specialists Consolidated Interim Storage Facility Project stage: Withholding Request Acceptance ML19011A1272019-01-29029 January 2019 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Second Request for Additional Information (W/Enclosure) Project stage: RAI ML19093A0472019-03-18018 March 2019, 4 April 2019 Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 Project stage: Request ML19093A0482019-04-0404 April 2019 Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (W/Enclosure 1) Project stage: RAI ML19109A1812019-04-12012 April 2019 International - HI-STORM FW Amendment 4 Response to Second Request for Additional Information Project stage: Request ML19120A2172019-04-26026 April 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for Energy Northwest Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72,30(b) and 72.30(c) for Humboldt Bay ISFSI Project stage: Other ML19120A2162019-04-26026 April 2019 Package: Environmental Assessment and Finding of No Significant Impact for Energy Northwest Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72,30(b) and 72.30(c) for Humboldt Bay ISFSI Project stage: Request ML19162A1142019-06-11011 June 2019 Affidavit Pursuant to 10 CFR 2.390 Project stage: Other ML19162A1032019-06-11011 June 2019 Submittal of Supplement to HI-STORM FW Amendment 4 Second Round RAI Response Project stage: Supplement ML19162A1042019-06-11011 June 2019 HI-STORM FW FSAR (Report HI-2114830 Proposed Rev. 5.G), Changed Pages (non-proprietary) Project stage: Other ML19165A1142019-06-14014 June 2019 Package: Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted Project stage: Request ML19165A1152019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.S Decommissioning Funding Plans Submitted Project stage: Other ML19186A2102019-07-0505 July 2019 International HI-STORM FW Amendment 4 Second Supplement to 2nd Round RAIs Project stage: Supplement ML19186A2112019-07-0505 July 2019 International Certificate of Compliance No. 1032 Project stage: Other ML19186A2122019-07-0505 July 2019 International - Attachment 2, Table 3.2.2, Limiting Parameters Project stage: Other ML19193A0172019-07-11011 July 2019 Letter to R. Ngwayah Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Updated Review Schedule Project stage: Other ML19198A1402019-07-15015 July 2019 Letter to R. Ngwayah Approval of Holtec International Request for Withholding Information from Public Disclosure - Certificate of Compliance No. 1032, HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment Request No. 4 Project stage: Withholding Request Acceptance ML19158A2722019-12-20020 December 2019 Memorandum to J. Cai User Need for Rulemaking for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Other ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2712019-12-20020 December 2019 Package: User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Request ML19158A2762019-12-20020 December 2019 Enclosure 4: Preliminary CoC 1032 Amendment No. 4 SER (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML20155K7452020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Final Safety Evaluation Report Project stage: Approval ML20155K7402020-06-15015 June 2020 Issuance of Certificate of Compliance No 1032 Amendment No. 4 for HI-STORM Flood/Wind Mulitpurpose Canister Storage System Project stage: Request ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B Project stage: Other ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a Project stage: Other ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Project stage: Other ML20155K7412020-06-15015 June 2020 Letter to Holtec Issuing Certificate of Compliance No. 1032 Amendment No. 4 for HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML22286A0012022-10-12012 October 2022 NRC Form 699 for Technical Discussions from March 15 to 17 of 2022 Related to the Application of the Castor geo69 Storage System (Docket No. 72-1052) (Redacted) Project stage: Other ML23076A2722023-03-17017 March 2023 HI-STORM 100 Amendment 16 RAI 3-3 Clarification Project stage: Other ML23235A0662023-08-23023 August 2023 Proposed Additional Alternative to the ACI Code, Concrete Temperature Limits, Docket 72-1042, CoC 1042 Amendments 1, 2, and 3 Project stage: Other ML23277A1272023-10-24024 October 2023 Proposed Additional Alternative to the American Concrete Institute Code, Concrete Temperature Limits, for Certificate of Compliance No. 1042, Amendment Nos. 1, 2 & 3 Project stage: Other ML24002B1432024-01-0202 January 2024 Attachment (Redacted) - Email Dated 1/2/24 Dbussmann (Gns) to Ngarcia (Nrc), Staggered RAIs Castor geo69 Storage, Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application-Shielding Evaluation (Public) Project stage: RAI ML24067A1852024-02-0808 February 2024 Attachment 1 - Conversation Record HI-STORM Flood/Wind Storage System Amendment 7: Staffs Observation on 1/26/2024 Meeting Project stage: Meeting L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) Project stage: Response to RAI 2019-04-04
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 29, 2019 Ms. Kimberly Manzione Licensing Manager Holtec International Holtec Technology Campus One Holtec Boulevard Camden, NJ 08104
SUBJECT:
AMENDMENT NO. 4 TO CERTIFICATE OF COMPLIANCE NO. 1032 FOR THE HI-STORM FLOOD/WIND MULTIPURPOSE CANISTER STORAGE SYSTEM -
SECOND REQUEST FOR ADDITIONAL INFORMATION
Dear Ms. Manzione:
By letter dated March 11, 2016 [Agencywide Document Access and Management System (ADAMS) Accession No. ML16190A158], as supplemented by letters dated September 16, 2016, January 31, 2017, April 27, 2018, and July 27, 2018 (ADAMS Accession Nos.
ML16265A491, ML17032A398, ML18117A472, and ML18208A637, respectively), Holtec International submitted an amendment request to the U.S. Nuclear Regulatory Commission (NRC) for the HI-STORM Flood/Wind Multipurpose Canister Storage System Certificate of Compliance (CoC) No. 1032.
The NRC staff reviewed your application and determined the need for additional information as identified in the second request for additional information (RAI) in the enclosure to this letter.
We request that you provide the response to the RAI within 30 days from the date of this letter.
If you are unable to meet this deadline, please notify us in writing, within two weeks of receipt of this letter, of your new submittal date and the reasons for the delay.
K. Manzione Please reference Docket No. 72-1032, CAC No. 001028, and EPID No. L-2017-LLA-0030 in future correspondence related to this licensing action. If you have any questions, please contact me at 301-415-1018.
Sincerely,
/RA/
Yen-Ju Chen, Sr. Project Manager Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1032 CAC No.: 001028 EPID No.: L-2017-LLA-0030
Enclosure:
HI-STORM 100 FW Amendment No. 4 Second RAI
ML19011A127
DSFM DSFM DSFM DSFM DSFM DSFM NAME:
YChen WWheatley EGoldfeiz TTate TTaylor for JMcKirgan CRegan For MLayton DATE:
11/14/2018 11/14/2018 11/14/2018 1/11/2019 11/14/2018 1/11/2019 1/28/2019 1/29/2019
Enclosure Second Request for Additional Information Docket No. 72-1032 Holtec International HI-STORM 100 Flood/Wind Multipurpose Canister Storage System Certificate of Compliance No. 1032 Amendment No. 4 By letter dated March 11, 2016 [Agencywide Document Access and Management System (ADAMS) Accession No. ML16190A158], as supplemented by letters dated September 16, 2016, January 31, 2017, April 27, 2018, and July 27, 2018 (ADAMS Accession Nos.
ML16265A491, ML17032A398, ML18117A472, and ML18208A637, respectively), Holtec International submitted an amendment request to the U.S. Nuclear Regulatory Commission for the HI-STORM Flood/Wind Multipurpose Canister Storage System Certificate of Compliance (CoC) No. 1032.
The staff identified additional information needed in connection with its review of the application as provided in the second request for additional information discussed below. The question describes information needed by the staff to complete its review of the application and to determine whether the applicant has demonstrated compliance with regulatory requirements in 10 CFR Part 72.
Chapter 5 Shielding Evaluation 5-5 Verify whether the combinations of burnup, initial enrichment, and cooling time (BECT) presented in Table 5.4.9 of the Safety Analysis Report (SAR) represent the bounding source terms for the new 16x16D fuel and associated fuel loading patterns in the HI-STORM FW system to be authorized under Amendment 4. Alternatively, provide a complete list of the BECT combinations for the 16x16D fuel so that the staff can determine if the radiological source terms result in radiological dose rates that are within the HI-STORM FW system design limits.
In the letter dated January 19, 2018 (ML18022A612), the staff requested, in RAI 5-4, the applicant to clarify if the radiation source term used in the shielding evaluation is bounding.
The applicant stated in its response that: Shielding analysis [were] performed considering a wide range of conservative combinations of burnups, enrichments and cooling times. These combinations sufficiently bound all possible fuel loadings. The applicant revised the SAR to include combinations of BECT in Table 5.4.9. The applicant stated that these BECT combinations used in calculations result in source terms that are reasonably bounding for all realistically expected assemblies. The staff notes that these BECT combinations do not mirror the BECT limits in Table 2.1-1.III of the Technical Specifications (TS) Appendix B. The applicant provided the decay heat limits for each fuel cell in the fuel basket that is to be loaded with the new 16x16D fuel in TS Appendix B Table 2.3-5 and states, in the SAR, that the decay heat is used to bound the design basis source terms to demonstrate compliance with 10 CFR 72.236(d). However, there is no information provided on the relationship between the decay heat and the radiological source terms. There are BECT combinations for which an assembly could produce the same decay heat but potentially have higher than design basis radiation source terms (neutron, gamma, or both).
It is important to note that the recommendations published in NUREG/CR-6716 are based on a balanced evaluation of parameters important to safety while alleviating limitations in the TS to provide the CoC holders flexibility to make design changes under the provisions in 10 CFR 72.48. The staff requests this information to determine if the HI-STORM FW Amendment No. 4 system, with the requested new contents, meets the regulatory requirements of 10 CFR 72.236(d).