International Revised Supplemental Responses for HI-STORM FW Amd. 6 Requests for Additional Information
ML21333A138
Person / Time
Site: 07201032
Issue date: 11/29/2021
From: O'Mullane C
Holtec
To: Santos N
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21333A137 List:
References
5018092, CoC No. 1032, EPID L-2019-LLA-0231
Download: ML21333A138 (3)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 November 29, 2021 Norma Garcia Santos - Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 EPID L-2019-LLA-0231

Subject:

Revised Supplemental Responses to HI-STORM FW Amd. 6 Requests for Additional Information Reference(s):

[1] NRC Letter, Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Staggered First Request for Additional Information, from Norma Garcia Santos (NRC) to Christopher OMullane (Holtec), dated September 24, 2020.

[2] NRC Letter, Application for the Model No. HI-STORM FW Storage System, Amendment No. 6 - Final Staggered Request for Additional Information, from Norma Garcia Santos (NRC) to Christopher OMullane (Holtec), dated November 6, 2020.

[3] Holtec Letter 5018081, Holtec Responses to HI-STORM FW Amd. 6 Requests for Additional Information, from Christopher OMullane (Holtec) to Norma Garcia Santos (NRC), dated December 21, 2020.

[4] NRC Conversation Record, Conference Call with Holtec International--Clarify Thermal, Materials, and Structural RAI Responses Regarding HISTORM FW, Amendment 6 (Docket No. 72-1032), dated March 8, 2021.

Document ID 5018092 Page 1 of 3

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909

[5] NRC Conversation Record, Conference Call with Holtec International--

Discuss response to Structural RAI 3-3 Regarding HISTORM FW, Amendment 6 (Docket No. 72-1032), dated March 24, 2021.

[6] Holtec Letter 5018089, Supplemental Responses to HI-STORM FW Amd. 6 Requests for Additional Information, from Christopher OMullane (Holtec) to Norma Garcia Santos (NRC), dated August 2, 2021.

Dear Ms. Garcia Santos:

By letters dated September 24, 2020 [1] and November 6, 2020 [2], the NRC staff sent staggered Requests for Additional Information (RAIs) needed to complete their detailed technical review of Amendment 6 of the HI-STORM FW Certificate of Compliance (CoC) 72-1032. Holtec provided responses to the RAIs by letter dated December 21, 2020 [3]. Subsequent to submittal of these responses, Holtec and the NRC staff participated in two telephone conference calls on March 8, 2021 [4] and March 24, 2021 [5], during which it was determined that clarification was warranted for Holtecs responses to Thermal RAIs 4-1 & 4-2, Materials RAI 4-1, and Structural RAIs 3-1, 3-2, & 3-3. Holtec provided supplemental responses to these RAIs by letter dated August 2, 2021

[6]. Following submittal of the supplemental responses, further discussion between Holtec and the NRC staff regarding Thermal RAIs 4-1 & 4-2 and Structural RAIs 3-1, 3-2, & 3-3 determined additional clarification was necessary. Holtec is pleased to submit its revised supplemental responses in Attachment 1 of this letter.

Attachments 2 & 3 contain the proprietary and non-proprietary versions of the HI-STORM FW FSAR with changes specifically resulting from the latest revisions of the supplemental responses.

Note that any previous changes associated with Amendment 6 remain tracked in Attachments 2 &

3, while only the latest changes are highlighted for clarity. contains Appendix A of CoC 72-1032 with changes specifically resulting from the latest revisions of the supplemental responses. Note that any previous changes associated with Amendment 6 remain tracked in Attachment 4, while only the latest changes are highlighted for clarity.

As Attachment 2 is considered proprietary, an affidavit requesting that this information be withheld from public disclosure in accordance with 10CFR2.390 is contained in Attachment 5.

Document ID 5018092 Page 2 of 3

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 If you have any questions, please contact me at c.omullane@holtec.com or 856-912-1162.

Sincerely, Christopher OMullane Licensing Engineer, Holtec International cc:(via email)

Yoira Diaz-Sanabria (USNRC)

Kimberly Manzione (Holtec)

Attachments : HI-STORM FW Amendment 6 RAI Supplemental Responses Revised November 29, 2021 (NON-PROPRIETARY) : HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (PROPRIETARY) : HI-STORM FW FSAR Proposed Revision 7.D Revised November 29, 2021 (NON-PROPRIETARY) : HI-STORM FW Amendment 6 CoC, Appendix A - Revised November 29, 2021 (NON-PROPRIETARY) : Affidavit in Accordance with 10CFR2.390 Document ID 5018092 Page 3 of 3