IR 05000213/1987004

From kanterella
Revision as of 23:16, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Physical Security Insp Rept 50-213/87-04 on 870127-29.No Violation Noted.Major Areas Inspected:Licensee Program for Protection of Safeguards Info Per 10CFR73.21,including Use of Required Storage Repositories & Handling Procedures
ML20207S559
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/27/1987
From: Keimig R, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20207S555 List:
References
50-213-87-04, 50-213-87-4, NUDOCS 8703200033
Download: ML20207S559 (2)


Text

-. U.S. NUCLEAR REGULATORY COMMISSION .

REGION I

Report N /87-04 Docket N License N DPR-61 Licensee: Connecticut Yankee Atomic Power Company P. O. Box 270 Hartford, Connecticut 06101 Facility Name: Haddam Neck Plant Inspection At: Haddam Neck, Connecticut Inspection Conducted: January 27-29, 1987 Date of Last Physical Security Inspection: November 14-21, 1986 Inspector: /- r s - 7-# 7

/WilliamMad8en. Physica ecur y Inspector date Approved by: ', 'v cJ .27_ g 7

. R. Keimig, t.ntet,1afe rds Section, DRSS date-Inspection Summary: Unannounced, Phy ical Security Inspection on January 28, 1987 (Report No. 50-213/87-04)

Areas Inspected: Licensee's program for the protection of Safeguards Infor-mation in accordance with 10 CFR 73.21, including the use of required storage repositories and handling procedures.

'

Results: The licensee was found to be in compliance with NRC requirements in the areas inspecte p 32%hk G

._ _ _ . . _

-i- . .

DETAILS Key Persons Contacted N. Tasker, Director, Systems Security E. DeBarbra, Station Services Superintendent G. Hallberg, Security Supervisor P. Marcase, Assistant Security Supervisor J. Chiarella, Assistant I&C Supervisor W. Olney, Assistant I&C Supervisor D. Bement, Nuclear Records Supervisor The inspector.also interviewed other licensee personne . Exit Interview The inspector met with Mr. N. Tasker at the conclusion of the inspection on January 29, 1987 and summarized the scope and findings of the inspec-tio At no time during this inspection was written material provided to the licensee by the inspecto . Physical Protection of Safeguards Information The inspector confirmed by a review of licensee procedures and records, discussions with personnel, and a random inspection of safeguards infor-mation repositories that the licensee's program for the protection of Safeguards Information meets the general performance requirements of 10 CFR 73.21. This inspector's review encompassed the types of informatian to be protected, physical protection (in use and in storage), markings, access, reproduction, destruction and external transmissions, including automatic data processing systems.

,

i l'

!

(

!

l r

._ ._

.. - _. _