Insp Rept 50-213/88-01 on 880111-21.Violations Noted.Major Areas Inspected:Inservice Test Program Which Included Review of Procedures,Witnessing of Test & Interviewing Test Personnel
ML20148E998
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/11/1988
From: Eapen P, Hunter J, Kucharski S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20148E964 List:
References
50-213-88-01, 50-213-88-1, NUDOCS 8803280044
Download: ML20148E998 (6)


See also: IR 05000213/1988001

Text

~

.

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-213/88-01

Docket No. 50-213

License No. DPR-61

Licensee: Connecticut Yankee Atomic

Power Company

Facility Name: Haddam Neck

Inspection At: Haddam Neck, Connecticut

Inspection Conducted: January 11-21, 1988

.

1 .

-

'

3!Mb

Inspectors: _Staney{.Kucharski Lead Reac or gin r dite /

dA /k 4 4. d

Jghn Huntet, Reactor Engideer ~

^ 3/uf

dste /

Approved by: K f.a/t~t_

P.K. Eapen, Chfef, Special Test

34/Pr

date

Programs Section, E.B. , DRS

Inspection Summary: Inspection on January 11-21,1988 (Inspection Report

No. 50-213/88-01)

Areas Inspected: Routine announced inspection of the Inservice Test program,

which included review of procedures, witnessing of test and interviewing test

personnel.

Results: One violation and one unresolved item was identified. Failure to

reco W opening time for the Service Water Isolation Valve SW-A0V-129 resulted

in the violation. Completion of Surveillance Procedure improvement program

is the subject of the unresolved item. The inspector noted that the IST pro-

cedures are very confusing to the test personnel. The Quality Assurance

department was not adequately involved to identify and correct problems in the

IST area.

BSO3%0044

PDR

DOCK Oo DCD8$0hb13

O

-

,

-

l

l

,

1

Details j

l

1.0 Persons Contacted

A. Connecticut Yankee Atomic Power Company

1

J.E. Beauchamp, Quality Service Supervisor

G. Bouchard, Unit Superintendent

J.W. Calderone, ISI Engineer

J.L. Delawrence, ISI Assistant Supervisor

P. L'Heureux, Engineering Supervisor l

D.J. Ray, Operation Supervisor l

M.A. Smith, ISI Associate Engineer

B. NRC Personnel

A.A. Asars, Resident Inspector

2.0 Inservice Testing (IST) Program for Pumps and Valves

2.1 Scope of Review

The inspector reviewed the licensee's IST program implementation to l

ascertain compliance with 10 CFR 50.55a(g) which requires Inservice

Testing (IST) of pumps and valves in accordance with Section XI of

the ASME Boiler and Pressure Vessel Code. A major portion of this

review was an evaluation of the licensee's IST prograrr with respect

j to procedures, conduct of test and analysis of results.

2.2 Procedure Review

The inspector reviewed the surveillance p.ocedures listed in

Appendix A for technical adequacy and to ascertain compliance with

requirements of Technical Specifications, Section XI of the ASME

Boiler and Pressure Vessel Code, and 10 CFR 50.55a. During the

review process the inspector noted that the surveillance procedures

were not clearly written. The inspector identified such concerns as

mislabeled valves, and confusing terminology for the test personnel

to follow. Parts of the surveillance procedures were written to

allow test personnel to enter test data easily and parts were written

such that data were omitted (see Secti M 2.3). The licensee ack-

nowledged the inspector's concerns and stated that they are imple-

menting a surveillar.ce procedure improvement program to review all

the procedures and improve them as needed. This item is unresolved

pending completion of the improvement program. (UNR 50-213/88-01-01),

i

_ _ _

O

.

%

..

es

>

L

ds g

'

-'S -L

}* *

3

gf

.\~ . .Qa  %

N , *

J

'

.*% Y.a t

= 'n

%

IN s

4

a

as i

A

L

g

<' o

e

%

N 4

%, A * %

%A

  • %% -

' ,

g , Ar , ^ N

8

w

.y

~ ,. - *

sy ' ,

r

3,,

  • * g PO

5 '

{ s ,

- .A~ '4s <,

s

.

, M

%,,

.~ S

V. k

, .

% - 5> 9 y,A-

. 3 N

,

&

%

L &

, ,

\

s e- w V

7

j b

,

i

e

A

( 8

=

On

.

s

J

+

.' \

%

  1. *

G

. .

.

3

2.3 Test Witnessing

On January 12, 1988, the inspector witnessed the surveillance test of

Service Water Isolation Valves SW-A0V-129, SW-A0V-130, SW-A0V-8, and

SW-A0V-9. The test was being conducted with approved procedures

No. SUR 5.7-67 Inservice Inspection of Service Water Isolation Valves

SW-A0V-129, SW-A0V-130, SW-A0V-8 and SW-A0V-9, Revision 8,

April 22, 1987. The inspector observed the performance of the test

to ascertain that the prerequisites were met, the proper precautions

were taken, the instrumentation used for the test had the required

calibration stickers and the personnel involved in performing the

test were knowledgeable of the procedure and its requirements. The

inspector noted during the performance of the test that the personnel

performing the test did not comply with the procedure in that they

did not enter the opening time for SW-A0V-129. The test personnel

initialed the step and continued on with the test without properly

recording the data as required. This is in violation of the licensee's

Technical Specifications 6.8.1 which states in part that written

procedures shall be established, implemented and maintained that meet

or exceed the requirements and recommendations of Sections 5.1 and 5.3

of ANSI N18.7-1976 and Appendix "A" of USAEC Regulatory Guide 1.33

(50-213/88-01-02).

2.4 IST Results Evaluation

Tho inspector reviewe d iadividual data Sheets and trend charts for a

sample of the tests listec in Appendix A. All the data were analyzed

by the responsible personnel within two days of the test. Thr. in-

spector ncted several problems with documentation. The licensee

agreed to include this in their procedure enhancement program. The

inspector had no further questions,

l

3.0 QA/QC Involvement i

During the review of the IST program, the inspector interviewed the QA j

department personnel to determine their involvement with the program. The i

inspector noted that QA does a very limited review of the IST procedures.

In regard to test witnessing, QA had limited involvement (two tests in the

past year). The QA department has agreed to plan increase coverage of I

this area. The inspector had no further questions at this time. l

4.0 Review of Third Ten-Year Interval Inservice Test (IST) Program Submittal

A working meeting was held onsite on January 13, 1988 to discuss questions

and cor.ments resulting from the NRC review of the licensee's IST Program

Submittal. The questions and comments that served as the agenda for the

meeting and the response to those questions and comments are documented

separately in the meeting minutes.

a

.

.

4

.

The licensee representatives were given a brief introduction outlining the

agenda and the methods used for documentation of the questions and

responses. The introduction was followed by detailed discussions of the

specific IJRC questions and comments regarding the IST submittal. The

discussions resulted in eight open items for the licensee and twenty-three

items that will be corrected in their revised submittal.

The licensee was requested to provide the Region I office with the

required information necessary to resolve the open items and to also

ensure that their revised submittal incorporated all of the resolutions

of the items discussed in the meeting minutes.

5.0 Exit Meeting

A meeting was held on January 21, 1988 to discuss the scope and findings

of the inspection as delineated in this report with licensee representa-

tion denoted in Paragraph 1. At no time during this inspection was

written information provided to the licensee. The licensee representatives

did not indicate that this inspection involved any proprietary information.

_ _

>

. .

.

.

APPENDIX A

Documents Reviewed

--

Surveillance Procedure No. SUR 5.7-10, Inservice Inspection Pump

Analysis and Documentation, Revision 6, May 23, 1985

--

Surveillance Procedure No. SUR 5.7-19, Inservice Inspection Pump

Surveillance, Revision 5, August 1, 1983

--

Surveillance Procedure No. SUR 5.7-20, Inservice Inspection of

Charging Line Stop Valves, Revision 5, July 3, 1987

--

Surveillance Procedure No. SUR 5.7-22, Feedwater Supply to Steam

Generator Check Valves, Revision 3, June 20, 1986

--

Surveillance Procedure No. SUR 5.7-27, Steam Generator

Atmospheric Dump Valves, Revision 6, July 3, 1987

--

Surveillance Proccdure No. SUR 5.7-30, Spent Fuel Pit Pump A and

B Discharge Check Valves, Revision 5, November 29, 1985

--

Surveillance Procedure No. SUR 5.7-67, Inservice Inspection of

Service Water Isolation Valves SW-A0V-130, SW-A0V-129, SW-A0V-8,

SW-A0V-9, Revision 8, April 22, 1987

--

Surveillance Procedure No. SUR 5.7-68, Inservice Inspection of

Metering Pump Suction MOVs, Revision 5, July 3, 1987

--

Surveillance Procedure No. SUR 5.7-69, Inservice Inspection of I

Boric Acid Pump Discharge Check Valves, BA-CV-361, BA-CV-370,

Revision 6, July 3,1987

--

Surveillance Procedure No. SUR 5.7-70, Auxiliary Feedwater MOV's

FW-MOV-35 and FW-MOV-160, Revision 4, October 18, 1985

--

Surveillance Procedure No. SUR 5.7-87, Auxiliary Steam Generator

Feed Pump Control Valves (MS-PICV-1206A and 12069), Revision 2,

May 7, 1986

l

!

--

Surveillance Procedure No. SUR 5.7-88, Inservice Inspection of

PORV Block Valves (PR-MOV-567 and PR-MOV-569), Revision 7, l

February 19, 1987

.-. .

r-

.

.

. .

.

,

-

APPENDIX A 2

--

Surveillance Procedure No. SUR 5.7-89, Service Water Pump

Discharge Check Valves, Revision 4, October 18, 1985

--

Surveillance Procedure No. SUR 5.7-95, Main Steam Drain Valves,

Revision 2, June 20, 1986

--

Surveillance Procedure No. SUR 5.7-117, Inservice Inspection of

Charging System Valves, Revision 1, May 29, 1987

--

Surveillance Procedure No. SUR 5.7-118, Service Water

Punctuation Check Valves, Revision 1, April 18, 1987

--

Surveillance Procedure No. SUR 5.7-119, Inservice Inspection of

Fill Header FH-MOV-344 Bypass Valve, Revision 0, April 6, 1987

--

Surveillance Procedure No. SUR 5.7-121, Inservice Inspection of

RCP Seal Water Supply Check Valves CH-CB-305A, 305B, 305C, 305D,

Revision 0, April 6, 1987

--

Surveillance Procedure No. SUR 5.7-131, Inservice Inspection of

RC-MOV-501, 512, 513, 514, 526, 537, 538 and 546, Revision 0,

July 17, 1937

--

Surveillance Procedure No. SUR 5.5-28, Testing ISI Program

Safety and Relief Valves, Revision 3, July 3, 1987

--

Preventive Maintenance Procedure, PMP 9.5-114, Safety Relief and

Relief Valves, Revision 9, February 19, 1987

--

Surveillance Procedure No. SUR 5.1-12, Main Steam Line Isolation

Trip Valve Tests, Revision 11, May 19, 1987