ML20207T755

From kanterella
Revision as of 18:38, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Suppls Response to Violations Noted in Insp Repts 50-348/86-13 & 50-364/86-13.Corrective Actions:Date of Full Compliance Changed from 870201 to 0601 & Review of Single Line Drawings Complete & Discrepancies Corrected
ML20207T755
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/23/1987
From: Mcdonald R
ALABAMA POWER CO.
To: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NT-87-0059, NT-87-59, NUDOCS 8703240308
Download: ML20207T755 (1)


Text

-- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Alibsms Powsr Company NT 87-0059

- 600 North 1Gth Strtet Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 R. P. Mcdonald Senior Vice President q7 fEB27 All : g4 Alabama Power A

the southem electrc system February 23, 1987

'1 Docket No. 50-348 Docket No. 50-364 Mr. D. M. Verrelli U. S. Nuclear Regulatory Comission Region II 101 Marietta Street, N. W.

Suite 3100 Atlanta, Georgia 30323

SUBJECT:

J. M. Farley Nuclear Plant NRC Inspection of June 11 - July 10, 1986 RE: Report Number 50-348/86-13 Report Number 50-364/86-13

Dear Mr. Verrelli:

his is an update on the violation cited in the subject inspection reports.

Alabama Power Company's original response ind!cated that the date of full compliance would be February 1, 1987. This revision changes that date to June 1, 1987. Items #2 and #3 of the corrective action have been completed.

The review of all 125V DC and 120V AC single line drawings discussed in

Item #1 has also been completed; however, when these drawings were compared i to the appropriate connection drawings, several discrepancies not previously identified were found. Wese discrepancies are still being corrected by drawing changes and the expected date of full compliance is June 1, 1987.

Yours ve truly, R. P. Mcdonald RPM:emb l

l fl0

_ _ _ _ _ _ _ _ _ _ _ 7E00