ML20155G779

From kanterella
Revision as of 07:50, 17 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-508/98-201 on 981027-28.No Violations Noted.Insp Included Review of Activities to Terminate Construction Permit CPPR-154
ML20155G779
Person / Time
Site: Satsop
Issue date: 11/02/1998
From: Weiss S
NRC (Affiliation Not Assigned)
To: Coleman D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20155G785 List:
References
50-508-98-201, NUDOCS 9811090185
Download: ML20155G779 (4)


See also: IR 05000508/1998201

Text

. . . . _ _ .. - -

Dr. D:ug W. Cct: man

November 2,-1998

-

- P.O. Box 968

Mail Drop PE20

.. Richland, Washington 99352-0968

SUBJECT: NRC INSPECTION REPORT NO. 50-508/98-201

Dear Mr. Coleman:

This letter refers to the inspection conducted on October 27-28,1998, at your Washington

Nuclear Project Unit 3 facility. The inspection included a review of activities to terminate

the Construction Permit No. CPPR-154 for your facility. The enclosed report presents the

results of that inspection.

Various aspects of your safety program were inspected ircluding selective examinations of

procedures and representative records, and interviews with personnel. Based on the

results of _this inspection, no significant safety issues were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

If there are any questions concerning this letter, please contact Mr. Marvin Mendonca of

my staff at (301) 415-1128.

Sincerely,

s

ORIGINAL SIGNED BY:

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-508

Construction Permit No. CPPR-154

Enclosure: NRC Inspection Report No. 50-508/98-201

cc w/ enclosure: See next page

Distribution: w/ enclosure  !

E-MAIL HARD COPY

TBurdick TDragoun N Docket File 50-508

Pisaac TMichaels PUBLIC SWeiss

EHylton PDND r/f

{

CBassett

AAdams

WEresian

SHolmes MMendonca GTracy, OEDO

{'"(

-

'

~ " ~

JRoe RJolly JWilson

~

l PDND:PM W PDN J.A' .

! MMendonca EMton SW '

l 11/ d-/98 11/S/98 11/2.-/98

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\MENDONCA\WNP3lR.WPD

9811040135 981102 '

PDR ACOCK 05000508

G PDR

h $,.

l

. . . _ _

C.. Dr. Doug W. Col:m n November 2, 1998

P.O. Box 968

V

,

Mail Drop PE20-

Richland, Washington 99352-0968

SUBJECT:- NRC INSPECTION REPORT NO. 50-508/98 201

Dear Mr. Coleman:

This letter refers to the inspection conducted on October 27-28,1998, at your Washington

Nuclear Project Unit 3 facility. The inspection included a review of activities to terminate

the Construction Permit No. CPPR-154 for your facility. The enclosed report presents the

results of that inspection.

Various aspects of your safety program were inspected including selective examinations of

procedures and representative records, and interviews with personnel. Based on the

results of this inspection, no significant safety issues were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

,

if there are any questions concerning this letter, please contact Mr. Marvin Mendonca of

my staff at (301) 415-1128.

Sincerely,

ORIGINAL SIGNED BY:

Seymour H. Weiss, Director i

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-508

Construction Permit No. CPPR-154

Enclosure: NRC Inspection Report No. 50-508/98-201

cc w/ enclosure: See next page

Distribution: w/ enclosure

E-MAIL HARD COPY

TBurdick TDragoun PDoyle Docket File 50-508

Pisaac TMichaels PUBLIC SWeiss

I CBassett WEresian EHylton PDND r/f

AAdams SHolmes MMendonca GTracy, OEDO

j JRoe RJolly JWilson

l

.

, /

PDND:PM S PDNGVJ.A (ED .

MMendonca EJ3 piton

11/ e/98 11/1/98 11/2.-/98

i

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\MENDONCA\WNP31R.WPD

-- . . . - - . - - . - ..

? .

'

,pmo u

v  % UNITED STATES

j

,

!

y NUCLEAR REGULATORY COMMISSION

"

2 WASHINGTON, D.C. 20666 4)o01

I

%*****# November 2, 1998

,

Mr. Doug W. Coleman

P.O. Box 968

Mail Drop PE20 l

Richland, Washington 99352-0968

i

SUBJECT: NRC INSPECTION REPORT NO. 50-508/98-201

l.

Dear Mr. Coleman:

This letter refers to the inspection conducted on October 27-28, 1998, at your Washington

Nuclear Project Unit 3 facility. The inspection included a review of activities to terminate

the Construction Permit No. CPPR-154 for your facility. The enclosed report presents the ,

results of that inspection.

Various aspects of your safety program were inspected including selective examinations of

procedures and representative records, and interviews with personnel. Based on the

results of this inspection, no significant safety issues were identified,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

If there are any questions concerning this letter, please contact Mr. Marvin Mendonca of

my staff at (301) 415-1128.

Sincerely,

4

f

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-508

Construction Permit No. CPPR 154

Enclosure: NRC Inspection Report No. 50-508/98 201

'

cc w/ enclosure: See next page

l

l

. . . . _ _ - _ - - - - - _ _ - - - _ _ - - - _ _ - - - - - - - _ - - - - - - - _ - _ _ - - - - - - - . .

.. .. . . ..

".

..

>

2

'cc:

Charles Butros

Washington Public Power Supply System

P.O. Box 1223

Mail Drop 760

Elma, Washington 98541-1223-

William A. Kiel

. Washington Public Power Supply System

~ P.O. Box 968

Mail Drop PE20

- Richland, Washington 99352-0968

Michael E. Mills -

' Energy Facility Site Evaluation Council

Department of Community, Trade and Economic Development

925 Plum St., SE, Bldg.4 '

P. O. Box 43172

Olympia, Washington 98504-3172

William Banks

' Grays Harbor Regional Planning Commission

2109 Sumner Avenue, Suite 202

Aberdeen, Washington 98520

<

i

_ _ - - . _ _ - - _ - - - - - - - -