Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A5291999-10-0505 October 1999 Notification of 991026 Meeting with Vynpc in King of Prussia,Pa to Discuss Licensee Responses to Maint Rule Violation of 10CFR50.65(a)(3), Balancing Reliability with Unavailability ML20207M7641999-03-16016 March 1999 Forwards Monthly Rept of Status of 10CFR2.206 Petitions as of 990228.During Feb Director'S Decision DD-99-01,DD-99-02, DD-99-03 & DD-99-04,became Final Agency Actions & Closed. Attachment 3 Filed in Central Files ML20205J2731999-03-0909 March 1999 Forwards Request for Addl Info Transmitted on 990224 to T Silko of Vermont Yankee Nuclear Power Corp.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20202E4021999-01-28028 January 1999 Forwards Draft RAI Re Proposed Amend on SFP Assemblies Storage Expansion.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20196A9541998-11-19019 November 1998 Notification of 981217 Meeting with Util in Rockville,Md to Discuss Util Plans & Activities Related to long-term Spent Fuel Storage at Vermont Yankee Nuclear Power Station ML20239A2961998-09-0101 September 1998 Notification of Significant Licensee Meeting 98-078 W/Util on 980916 to Discuss NRC Systematic Assessment of Licensee Performance of Vermont Yankee Nuclear Power Station for Period 970119-980718 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248H7531998-06-0303 June 1998 Notification of 980623 Meeting W/Vermont Yankee Nuclear Power Corp in Rockville,Md to Discuss Util Plans & Activities Related to Long Term Spent Fuel Storage at Plant ML20248L5181998-06-0202 June 1998 Forwards Document Developed by Cecil & R Croteau to Be Forwarded to V Dricks as Response to Mulligan ML20217F4151998-04-22022 April 1998 Forwards Facility Submittal of Initial/Operating Retake Exam Administered on 980209 ML20217B8571998-03-23023 March 1998 Notification of 980407 Meeting W/Util in Rockville,Md to Discuss Plant Plans & Activities Re Assurance of Adequate NPSH for Certain safety-related Pumps ML20216G1321998-03-13013 March 1998 Notification of 980324 Meeting W/Util to Discuss Licensee Plans & Activities Re Torus Strainer Replacement & Containment Issues.Meeting Will Take Place in Rockville,Md ML20217N4481998-03-10010 March 1998 Responds to 971110 Request for Assistance in Reviewing Technical Adequacy of Vermont Yankee Assessment & Repair of Structural Defects in Skid Mounted Piping for Edgs.Noted No Immediate Safety Concerns.Nrr Evaluation Encl ML20217N4721998-02-27027 February 1998 Forwards SER Re Structural Integrity of skid-mounted Piping Associated W/Edgs at Vermont Yankee.Based on Review,Staff Finds No Immediate Safety Concerns Re near-term Operability of EDGs ML20203H9091998-02-23023 February 1998 Notification of 980305 Meeting W/Utility in Rockville,Md to Discuss Vynpc Plans & Activities Re Containment Analysis, Bases for Maintaining Operations Related to Startup ML20203A9321998-02-17017 February 1998 Notification of Significant Licensee Meeting 98-17 W/Util on 980302 in King of Prussia,Pa to Discuss Apparent Violations in NRC Insp Rept 50-271/97-10 (EA-97-531) ML20198L2221998-01-0808 January 1998 Notification of 980112 Meeting W/Utility in Rockville,Md to Discuss Utility Plans & Activities Re Implementation of Torus Strainers at Vermont Yankee Nuclear Power Station. Meeting Cancelled ML20198G1441997-12-23023 December 1997 Notification of Meeting W/Vynpc on 980112 in Rockville,Md to Discuss Plans & Activities Re Implementation of Torus Strainers at Plant.Participants Listed.Agenda Encl ML20217J5131997-10-14014 October 1997 Notifies on 971103 Meeting W/Util in Rockville,Md to Discuss Util Plans & Activities Re Future Submittal on Imporved TSs for Plant ML20236N4551997-10-0606 October 1997 Submits Revised Response to Work Request Requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee ML20236N3571997-09-0808 September 1997 Responds to Work Request Dtd 970804,requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee,Revised Response ML20216E9851997-09-0404 September 1997 Notification of 970917 Meeting W/Vynp in Rockville,Md to Discuss Submittals & 970815 Re Implementation of ASME Code Case N560 at Vermont Yankee Nuclear Power Station ML20236N2711997-08-11011 August 1997 Discusses Work Request Requesting Review of Region I TIA Re Interpretation of TS at Vermont Yankee ML20198K8521997-07-0303 July 1997 Informs That Enforcement Action Not Appropriate for OI Rept 1-96-005, Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys, Because OI Did Not Substantiate Allegation ML20198K8311997-06-23023 June 1997 Forwards OI Rept of Investigation Re Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys,Case 1-96-005 ML20248L9751997-05-19019 May 1997 Responds to 970519 Memo from H Eichenholtz.Informs That D Vito Also Spoke W/Alleger on 970516 Re Allegation 96-128/97-0066.Alleger Was Barely Coherent & Complained About Delays in NRC Followup.Encl Partially Deleted ML20248L9671997-05-16016 May 1997 Informs That Alleger Called on 970517 & Threatened to Talk to Public & Media Unless NRC Addressed All Issues in Favor of Alleger Re Allegation 96-128/97-0066 ML20138E2001997-04-22022 April 1997 Notification of 970515 (Revised Date) Meeting W/Myaps in King of Prussia,Pennsylvania to Discuss Performance Improvements in Engineering Area:Design Basis Project;Sys Engineering Function;Other Process & Organization Lessons ML20140D6181997-04-17017 April 1997 Notification of 970514 Meeting Mn 97-45 W/Util in King of Prussia,Pa to Discuss Performance Improvements in Engineering Area,Design Basis Project,Sys Engineering Function & Other Process/Organization Lessons Learned ML20198K6861997-04-10010 April 1997 Submits Conversation W/H Eichenholz ML20137P4011997-04-0707 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Analyses & Code Use Relative to Fuel Cycle 20 ML20137C1441997-03-20020 March 1997 Notification of Meeting on 970326 W/Util in Rockville,Md to Discuss Continuous Improvement Initiatives for Vermont Yankee Nuclear Power Station ML20135F7851997-03-11011 March 1997 Notification of 970331 Meeting W/Licensee in Rockville,Md to Discuss Licensing Activities & Schedules for Vermont Yankee Nuclear Power Station ML20136C6071997-03-0505 March 1997 Notification of Significant Licensee Meeting 97-22 W/Util on 970312 to Discuss SALP Mgt Meeting for Period of 950716 Through 970118 ML20247G4121997-01-10010 January 1997 Informs That on 970110,B Ruland & Reporting Agent Contacted J Massey So Ruland Could Inform of When NRC Planned to Complete Insp Activities of Concerns W/Plant ML20198K6771996-12-18018 December 1996 Submits Plants Workers Comp Files from 1989 to Current.Lists Three Incidents Where Shock Was Involved ML20149M4011996-12-11011 December 1996 Reissued Notification of 961223 Meeting W/Util in Rockville, MD to Discuss Plant Plans for Cycle 20 Core Reload Using GE-13 Rather than GE-9 Fuel ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20135C5541996-12-0404 December 1996 Notification of 961216 Meeting W/Util in Rockville,Md to Discuss Plans to Use Different Fuel Type for Cycle 20 Core Reload ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C3361996-10-18018 October 1996 Notification of 961021 Meeting W/Officials of Vynpc to Discuss Status of Licensees Activities to Restore Fire Protection Program at VT Yankee Nuclear Power Station to Full Compliance W/App R to 10CFR50 ML20198K6701996-07-10010 July 1996 Forwards 960619 Interview Rept & 960605 Deposition Providing Info from Ej Massey Re Case 1-96-005.W/o Encl ML20248L8471996-03-29029 March 1996 Informs That Vermont Yankee Engineer Called D Reid on 960329 & Reported That PE Appeared to Be Under Influence & Threatened to Go to NRC If Vermont Yankee Did Not Settle Early Retirement Package.Related Matls Encl ML20248L8441996-03-27027 March 1996 Discusses 960327 Telcon W/B Sherman Re Status of Insp & Investigation Efforts Re Allegations Raised by Daly of New England Coalition on Nuclear Pollution in Dec 1995 ML20248L8421996-03-19019 March 1996 Refers to 960319 Telcon W/D Gibson,Informing That Massey Would Not Be Willing to Talk to J Calvert.Informs That Matter Turned Over to Region I Counsel ML20248L8391996-03-18018 March 1996 Provides Documentation of Attempts by J Calvert to Interview E Massey of Vermont Yankee During Insp of Vermont Yankee Advanced Off-Gas Sys Conducted on 960303-08 ML20248L8371996-02-0909 February 1996 Refers to 960209 Telcon W/B Sherman Who Indicated That Vermont Dept of Public Safety May Soon Be Less than Satisfied W/Nrc Handling of Allegation of H&I Re Work to Be Performed on Vermont Yankee Aog Sys 1999-03-09
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A5291999-10-0505 October 1999 Notification of 991026 Meeting with Vynpc in King of Prussia,Pa to Discuss Licensee Responses to Maint Rule Violation of 10CFR50.65(a)(3), Balancing Reliability with Unavailability ML20207M7641999-03-16016 March 1999 Forwards Monthly Rept of Status of 10CFR2.206 Petitions as of 990228.During Feb Director'S Decision DD-99-01,DD-99-02, DD-99-03 & DD-99-04,became Final Agency Actions & Closed. Attachment 3 Filed in Central Files ML20205J2731999-03-0909 March 1999 Forwards Request for Addl Info Transmitted on 990224 to T Silko of Vermont Yankee Nuclear Power Corp.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20202E4021999-01-28028 January 1999 Forwards Draft RAI Re Proposed Amend on SFP Assemblies Storage Expansion.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20196A9541998-11-19019 November 1998 Notification of 981217 Meeting with Util in Rockville,Md to Discuss Util Plans & Activities Related to long-term Spent Fuel Storage at Vermont Yankee Nuclear Power Station ML20239A2961998-09-0101 September 1998 Notification of Significant Licensee Meeting 98-078 W/Util on 980916 to Discuss NRC Systematic Assessment of Licensee Performance of Vermont Yankee Nuclear Power Station for Period 970119-980718 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20248H7531998-06-0303 June 1998 Notification of 980623 Meeting W/Vermont Yankee Nuclear Power Corp in Rockville,Md to Discuss Util Plans & Activities Related to Long Term Spent Fuel Storage at Plant ML20248L5181998-06-0202 June 1998 Forwards Document Developed by Cecil & R Croteau to Be Forwarded to V Dricks as Response to Mulligan ML20217F4151998-04-22022 April 1998 Forwards Facility Submittal of Initial/Operating Retake Exam Administered on 980209 ML20217B8571998-03-23023 March 1998 Notification of 980407 Meeting W/Util in Rockville,Md to Discuss Plant Plans & Activities Re Assurance of Adequate NPSH for Certain safety-related Pumps ML20216G1321998-03-13013 March 1998 Notification of 980324 Meeting W/Util to Discuss Licensee Plans & Activities Re Torus Strainer Replacement & Containment Issues.Meeting Will Take Place in Rockville,Md ML20217N4481998-03-10010 March 1998 Responds to 971110 Request for Assistance in Reviewing Technical Adequacy of Vermont Yankee Assessment & Repair of Structural Defects in Skid Mounted Piping for Edgs.Noted No Immediate Safety Concerns.Nrr Evaluation Encl ML20217N4721998-02-27027 February 1998 Forwards SER Re Structural Integrity of skid-mounted Piping Associated W/Edgs at Vermont Yankee.Based on Review,Staff Finds No Immediate Safety Concerns Re near-term Operability of EDGs ML20203H9091998-02-23023 February 1998 Notification of 980305 Meeting W/Utility in Rockville,Md to Discuss Vynpc Plans & Activities Re Containment Analysis, Bases for Maintaining Operations Related to Startup ML20203A9321998-02-17017 February 1998 Notification of Significant Licensee Meeting 98-17 W/Util on 980302 in King of Prussia,Pa to Discuss Apparent Violations in NRC Insp Rept 50-271/97-10 (EA-97-531) ML20198L2221998-01-0808 January 1998 Notification of 980112 Meeting W/Utility in Rockville,Md to Discuss Utility Plans & Activities Re Implementation of Torus Strainers at Vermont Yankee Nuclear Power Station. Meeting Cancelled ML20198G1441997-12-23023 December 1997 Notification of Meeting W/Vynpc on 980112 in Rockville,Md to Discuss Plans & Activities Re Implementation of Torus Strainers at Plant.Participants Listed.Agenda Encl ML20217J5131997-10-14014 October 1997 Notifies on 971103 Meeting W/Util in Rockville,Md to Discuss Util Plans & Activities Re Future Submittal on Imporved TSs for Plant ML20236N4551997-10-0606 October 1997 Submits Revised Response to Work Request Requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee ML20236N3571997-09-0808 September 1997 Responds to Work Request Dtd 970804,requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee,Revised Response ML20216E9851997-09-0404 September 1997 Notification of 970917 Meeting W/Vynp in Rockville,Md to Discuss Submittals & 970815 Re Implementation of ASME Code Case N560 at Vermont Yankee Nuclear Power Station ML20236N2711997-08-11011 August 1997 Discusses Work Request Requesting Review of Region I TIA Re Interpretation of TS at Vermont Yankee ML20198K8521997-07-0303 July 1997 Informs That Enforcement Action Not Appropriate for OI Rept 1-96-005, Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys, Because OI Did Not Substantiate Allegation ML20198K8311997-06-23023 June 1997 Forwards OI Rept of Investigation Re Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys,Case 1-96-005 ML20248L9751997-05-19019 May 1997 Responds to 970519 Memo from H Eichenholtz.Informs That D Vito Also Spoke W/Alleger on 970516 Re Allegation 96-128/97-0066.Alleger Was Barely Coherent & Complained About Delays in NRC Followup.Encl Partially Deleted ML20248L9671997-05-16016 May 1997 Informs That Alleger Called on 970517 & Threatened to Talk to Public & Media Unless NRC Addressed All Issues in Favor of Alleger Re Allegation 96-128/97-0066 ML20138E2001997-04-22022 April 1997 Notification of 970515 (Revised Date) Meeting W/Myaps in King of Prussia,Pennsylvania to Discuss Performance Improvements in Engineering Area:Design Basis Project;Sys Engineering Function;Other Process & Organization Lessons ML20140D6181997-04-17017 April 1997 Notification of 970514 Meeting Mn 97-45 W/Util in King of Prussia,Pa to Discuss Performance Improvements in Engineering Area,Design Basis Project,Sys Engineering Function & Other Process/Organization Lessons Learned ML20198K6861997-04-10010 April 1997 Submits Conversation W/H Eichenholz ML20137P4011997-04-0707 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Analyses & Code Use Relative to Fuel Cycle 20 ML20137C1441997-03-20020 March 1997 Notification of Meeting on 970326 W/Util in Rockville,Md to Discuss Continuous Improvement Initiatives for Vermont Yankee Nuclear Power Station ML20135F7851997-03-11011 March 1997 Notification of 970331 Meeting W/Licensee in Rockville,Md to Discuss Licensing Activities & Schedules for Vermont Yankee Nuclear Power Station ML20136C6071997-03-0505 March 1997 Notification of Significant Licensee Meeting 97-22 W/Util on 970312 to Discuss SALP Mgt Meeting for Period of 950716 Through 970118 ML20247G4121997-01-10010 January 1997 Informs That on 970110,B Ruland & Reporting Agent Contacted J Massey So Ruland Could Inform of When NRC Planned to Complete Insp Activities of Concerns W/Plant ML20198K6771996-12-18018 December 1996 Submits Plants Workers Comp Files from 1989 to Current.Lists Three Incidents Where Shock Was Involved ML20149M4011996-12-11011 December 1996 Reissued Notification of 961223 Meeting W/Util in Rockville, MD to Discuss Plant Plans for Cycle 20 Core Reload Using GE-13 Rather than GE-9 Fuel ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20135C5541996-12-0404 December 1996 Notification of 961216 Meeting W/Util in Rockville,Md to Discuss Plans to Use Different Fuel Type for Cycle 20 Core Reload ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C3361996-10-18018 October 1996 Notification of 961021 Meeting W/Officials of Vynpc to Discuss Status of Licensees Activities to Restore Fire Protection Program at VT Yankee Nuclear Power Station to Full Compliance W/App R to 10CFR50 ML20198K6701996-07-10010 July 1996 Forwards 960619 Interview Rept & 960605 Deposition Providing Info from Ej Massey Re Case 1-96-005.W/o Encl ML20248L8471996-03-29029 March 1996 Informs That Vermont Yankee Engineer Called D Reid on 960329 & Reported That PE Appeared to Be Under Influence & Threatened to Go to NRC If Vermont Yankee Did Not Settle Early Retirement Package.Related Matls Encl ML20248L8441996-03-27027 March 1996 Discusses 960327 Telcon W/B Sherman Re Status of Insp & Investigation Efforts Re Allegations Raised by Daly of New England Coalition on Nuclear Pollution in Dec 1995 ML20248L8421996-03-19019 March 1996 Refers to 960319 Telcon W/D Gibson,Informing That Massey Would Not Be Willing to Talk to J Calvert.Informs That Matter Turned Over to Region I Counsel ML20248L8391996-03-18018 March 1996 Provides Documentation of Attempts by J Calvert to Interview E Massey of Vermont Yankee During Insp of Vermont Yankee Advanced Off-Gas Sys Conducted on 960303-08 ML20248L8371996-02-0909 February 1996 Refers to 960209 Telcon W/B Sherman Who Indicated That Vermont Dept of Public Safety May Soon Be Less than Satisfied W/Nrc Handling of Allegation of H&I Re Work to Be Performed on Vermont Yankee Aog Sys 1999-03-09
[Table view] Category:NRC TO ASLP
MONTHYEARML20247B5301989-09-0101 September 1989 Request for Hearing of State of Vt.* Forwards Petition for Leave to Intervene & Request for Evidentiary Hearing in Response to Notice of Consideration of Issuance of Amend to OL Extending,For Appropriate Action,Per 10CFR2.772(j) ML20248D6061989-08-0303 August 1989 Informs That NRC Does Not Intend to File Response to Necnp Motion Re Expansion of Environ Contentions 1 & 3,filed on 890719,due to Appeal Board Decision ALAB-919 Rendering Motion Moot ML20245A4681989-06-13013 June 1989 Forwards Executed Affidavits of Fc Sturz & Mb Fairtile,Per NRC 890609 Pleadings ML20245A7731989-06-0909 June 1989 Forwards Listed Documents,Including NRC Motion to Strike Testimony of G Thompson,Nrc Reply to Briefs of Necnp & Vermont Yankee on Environ Contention 3 & Unexecuted Affidavit of Fc Sturz & Ma Fairtile Re Environ Contention 3 ML20236D6391989-03-20020 March 1989 Forwards Unexecuted Responses by J Kudrick for NRC to Bridenbaugh/Sholly 890301 Affidavit Upon Which NRC Will Rely in Oral Argument on New England Coalition on Nuclear Pollution Contention.W/Certificate of Svc ML20247A7791989-03-10010 March 1989 Forwards J Kudrick Executed Affidavit & Prof Qualifications ML20235V6681989-03-0101 March 1989 Forwards NRC Testimony in Form of Unexecuted Affidavit on Which NRC Will Rely in Oral Argument on New England Coalition on Nuclear Pollution Contention Scheduled for 890322-23.Certificate of Svc Encl ML20204G0451988-10-17017 October 1988 Informs That NRC Issued SER Re Plant Spent Fuel Pool Expansion Application on 881014 ML20151P4551988-08-0101 August 1988 Informs Board That Environ Assessment Issued on 880725,per 880712 Order ML20197D9561988-05-20020 May 1988 Forwards Documents Issued by NRC on 880520 Re Issuance of Amend Authorizing Util to Place New Racks Designed to Accommodate 2,870 Spent Fuel Assemblies in Spent Fuel Pool. Amend Authorizes Use of Racks for Only 2,000 Assemblies ML20150A9701988-03-0404 March 1988 Forwards Commonwealth of Ma & State of VT Request for Hearing & Petitions to Intervene Re Util Request to Eliminate Certain ECCS & Standby Liquid Control Sys Testing Requirements,For Appropriate Action.Served on 880311 ML20150A8941988-03-0404 March 1988 Forwards State of VT Petition to Intervene for Appropriate Action in Accordance w/10CFR2.772 (J).Petition Submitted in Response to Fr Notice at 53FR2115 on 880126.Served on 880311 ML20237B6481987-12-0707 December 1987 Advises That NRC Unable to Meet Schedule for Issuance of Review Documents by 871101.Environ Assessment Re Spent Fuel Pool Amend Will Be Available Before End of Jan 1988 & SER to Be Issued Shortly Afterward.Related Correspondence ML20237G9511987-08-21021 August 1987 Forwards SA Varga 870815 Memo to Wj Olmstead Indicating That Staff Estimates Issuance of Review Documents for Util Spent Fuel Pool Expansion,Ser & Environ Assessment by 871101. Related Correspondence 1989-09-01
[Table view] |
Text
's - $125
'o, UNITED STATES SERVED MAR 111933 s ,/
, NUCLEAR REGULATORY COMMISSION f .$ W ASHIN CTON, D.C. 20555 [;( g [ ,; -
March 4, 1988
% . . . . . ,o*
OF FICE OF THE 'E HAR -4 P3 :29 SECRETARY CFCu... n.. .u.
00cKEPw A .i ..v:r.r' BRANCu MEMORANDUM FOR: B. Paul Cotter, Jr.
Chief Administrative Judge Atomic Safety and Licensing Board Panel FROM: Samuel J. Chilk, Secreta'y@O
SUBJECT:
PETITION TO INTERVENE Vermont Yankee (50-271{-SPA- 3 The State of Vermont submitted the attached Petition to Intervene pursuant to a notice published in the Federal Register at 53 FR 2115 on January 26, 1988.
The petition to intervene is being referred to you for appropriate action in accordance with 10 CFR 2.772 (j).
cc: w/o attachments OGC H Street EDO NMSS ljj3160000080304 o ADocK 05000:27j PDR ybb
. J. t : i..
ST ATE OF VERMONT DEPARTMENT OF PUBLIC SERVICE 120 ST ATE STR EET p $ e.g l- ,, 7 _.
ST ATE OFFICE BUl'. DING QQCM I .% .*, & , ,[ [
MONTPELIER 05:02 SFANC-TEL. 00182828tt February 25, 1988 Secretary of the Commission .
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i ATTN: Docketing and Service Branch RE: No. 50-271 Vermont Yankee Nuclear Power Corp: Consideration of Issuance of Amendment to Facility Operating License and Opportunity For Prior Hearing
Dear Secretary:
Enclosed please find for filing the State of Vermont's Petition For Leave to Intervene and Notice of Appearance in the above-styled matter, pursuant to the notice contained at 53 FR 2115 (Jan. 26, 1988).
Very truly yours, I, < ai --.
l ; .
David J. Mbliett Special Counsel Vermont Department of Public Service Special Assistant Attorney General kv enclosures ,
i i
i
- uxtro sw:
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD 18 F03 29 P4 Ni{, ,f, ',
No. 50-271 Vermont Yankee Nuclear Power )
Corps Consideration of Issuance )-
of Amendment to Facility Operating )
License and Opportunity for Prior )
Hearing re: Proposed Amendment )
Noticed at 53 FR 2115 (Jan. 26,1988) )
VERMONT YANKEE NUCLEAR POWER CORPr CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR PRIOR HEARING PETITION OF THE STATE OF VERMONT FOR LFAVE TO INTERVENE NOW COMES the State of Vermont, by and through the undersigned counsel, and petitions for leave to intervene in the above-styled cause pursuant to 10 CFR 2.714 and the notice published at 53 FR 2115 (Jan. 26,1988) . In support of said petition it is stated:
I. RIGHT OF PETITIONER TO BE A PARTY.
The proposed license amendment involves the Vermont Yankee Nuclear Power Station located in Vernon, Vermont. The amendment seeks a revision of surveillance frequency requirements for trip system logic testing and calibration from once every six months to once per operating cycle. Such a reduction in testing the plant's safety systems has a
2 potentially significant effect on the health, welfare and safety of the people of Vermont, and the State of Vermont has a clear right to participate in the proceedings.
II. EXTENT OF PETITIONER 'S PROPERTY , FINANCIAL, OR OTHER INTEREST IN THE PROCEEDING.
The State of Vermont has a responsibility to ensure that the health, welfare and safety of the people of Vermont is not compromised or adversely affected by an improvident granting of the requested license amendment. Issuance of the license amendment under the circumstances proposed could, if State het.lth, safety and environmental concerns are not adequatel-( addressed, result in a significant increase in risk to Vermont and its citizens f rom the Vermont Yankee plant.
III. POSSIBLE EFFECT OF ANY ORDER WHICH MAY BE ENTERED IN THE PROCEEDING ON THE PETITIONER'S INTEREST.
As noted, the requested amendment involves a plant which is physically located in Vermont. Any order permitting the requested amendment would have both direct and indirect effect on Vermont and its citizenry. Eliminating the present requirements to test the remaining train (s) of the ECCS and SLC Systems when one train has a component out of service could create increased risk to the public if such a change ;
would operate to lessen the reliability or availability of !
the plant's safety systems. Moreover, undet 20 v.s.A. 5 1 gi .
[
f
~
3 ggg. , Vermont of ficials are charged with the responsibility of setting forth and effectuating plans to "prevent, minimize, and repair injury and damage" resulting from radiological incidents (Egg 20 V.S.A. S2); any proceeding involving potential compromise of Vermont Yankee's safety is thus of significant concern to the State of Verront.
IV. SPECIPIC ASPECTS OF THE SUBJECT MATTER AS TO WHICH PETITIONER WIEHES TO INTERVENE.
At this stage of the proceedings, Vermont has identified the following questions which the proposed amendment raises, and with respect to which Vermont wishes to intervene.
- a. Questions concerning whether the proposed reduction in testing will in any way compromise the reliability of the safety systems installed in the Vermont Yankee plant;
- b. Questions in to whether Yankee's planned increase in the time between testing (due to a planned increase in the length of the operating cycle) adversely effects the reliability of the safety system components that would be subject to the tests involved in the proposed amendment, thereby adversely effecting public safety,
- c. Questions concerning whether the proposed reduction in testing further reduces the reliability of the safety systems during a period
4 when the increasing age of the facility also threatens the reliability of the safety system components, thereby rendering the proposed l
amendment inconsistent with public safety.
WHEREFORE, having met the applicable tests for intervention, Petitioner prays that_it be allowed to intervene in this matter, and that further hearings be scheduled in accordance with Commission rules.
T. E STATE OF RMOITT
/: ,14 By:
i)/ nw f
[d dAf/ N DavFd'J. Mullqtt Special Counsel
- Department of'Public Service Special Assistant Attorney General All pleadings related to this matter should be served on:
David J. Mullett Vermont Department of Public Service 120 State Street Montpelier, VT 05602
i e
- :".e l '; ~
9.-
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD E FEB 29 P4 0F51.: -
00CKE*-w , ,;r No. 50-271 Bont-Vermont Yankee Nuclear Power )
Corps Consideration of Issuance )
of Amendment to Facility Operating )
License and Opportunity for Prior )
Hearing re: Proposed Amendment )
Noticed at 53 FR 2115 (Jan. 26,1988) )
NOTICE _OF APPEARANCE The undersigned counsel hereby files ti.is notice of appearance in this proceeding.
Name: David J. Mullett Address: 120 State Street Montpelier, Vermont 05602 Telephone No.: 802-828-2811 Admissions: State of Illinois State of Missouri State of Vermont U.S. Dist. Ct. for the Southern District of Illinois Party Represented: State of Vermont Respectfully submitped, f slI By: ! > 3x - i' J I ~
David J. Mullet't i Special Assistant Attorney General Special Couhsel Vermont Department of Public Service 120 State Street Montpelier, Vermont 05602 i (802) 828-2811 cc: Parties
i Q
d.( at . . ~
8.-
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD 18 FB 29 P4 :10 E0cNh.su .; (,,,,2l McNe No. 50-271 Vermont Yankee Nuclear Power )
Corp: Consideration of Issuance )
of Amendment to Facility Operating )
License and Opportunity for Prior )
Hearing re: Proposed Amendment )
Noticed at 53 FR 2115 (Jan. 26, 1988) )
CERTIFICATE OF SERVICE I hereby certify that I served a copy of the foregoing Petition to Intervene by causing a true copy hereof to be placed in the United States mail, postage prepaid, addressed as follows:
Secretary of the Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Office of the General Counsel-Bethesda U.S. Nuclear Regulatory Commission Washington, D.C. 20555 John A. Ritcher, Esq.
Roper and Gray 225 Franklin Street Boston, MA 02110 William Griffin, Esq.
Actorney General's Office State of Vermont Montpelier, VT 05602 New England Coalition on Nuclear Pollution, Inc.
P.O. Box 545 Brattleboro, VT 05301
a 2
George B. Dean Assistant Attorney General Nuclear Safety Unit Department of the Attorney General One Ashburton Place Boston, HA 02108 DATED at Montpelier, Vermont this 25th day of February, 1988.
VERMONT DEPARTMENT OF PUBLIC SERVICE
\ l
/ ,
" __. / 'A w / ,- gfyy BY: 4 David'J. Mu L1ctt
~
I Special Counsel l l t
I r
l 6
i I