ML20151P790

From kanterella
Revision as of 01:30, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Change Notice 002 to Rev 2 to Instruction QI-055, Reinsp of Instrument Pipe/Tube Supports/I-S-INSP
ML20151P790
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/29/1987
From: Schauf J, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20151P557 List:
References
QI-055-02, QI-55-2, NUDOCS 8804260254
Download: ML20151P790 (2)


Text

M

. Pcg] 1 of 2 1

EVALUATION RESEARCH CORPORATION l Fait l&Di! Mailed ONLY l

COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 002 INSTRUCTION NO.: QI-055 REVISION NO.: 2 ISSUE DATE: 09-29-87 REINSPECTION OF INSTRUMENT PIPE / TUBE SUPPORTS /I-S-INSP The QI identified above is hereby changed as shown on the attached page of this notice.

Prepared by: AL_ AQn M Date: 9/t&/6'l Approved by: #', _. Date: Y- 89-$ 7 1 sue Coordinator  !

9 / \

Approved by: Date: h kh-On-site QA Rep ntative '

Approved by: A+t,[ Date: 2 #) [

QA Review Team ' Leader /

8804260254 880415 PDR ADOCK 05000445 A DCD

Y .

. Chengo Notico: 001 QI-055 Revision 2

1. Revise Note 1 on page 14 From: "1. In the course of inspection, the inspector shall note any item not covered by reinspection / verification which appear out of the ordinary as related to the construction of the inspected item or surrounding area.

Note such in the remarks column of inspection checklist and initiate an out-of-scope observation.

To: "1. DELETED" l

l l

l i

I