ML20151P790
| ML20151P790 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/29/1987 |
| From: | Schauf J, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20151P557 | List: |
| References | |
| QI-055-02, QI-55-2, NUDOCS 8804260254 | |
| Download: ML20151P790 (2) | |
Text
M Pcg] 1 of 2 1
EVALUATION RESEARCH CORPORATION l
Fait l&Di! Mailed ONLY l
COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE:
002 INSTRUCTION NO.: QI-055 REVISION NO.:
2 ISSUE DATE: 09-29-87 REINSPECTION OF INSTRUMENT PIPE / TUBE SUPPORTS /I-S-INSP The QI identified above is hereby changed as shown on the attached page of this notice.
Prepared by: AL_
AQn M Date:
9/t&/6'l Approved by:
Date:
Y-89-$ 7 1 sue Coordinator 9 /
\\
h kh-Approved by:
Date:
On-site QA Rep ntative Approved by:
A+t,[
Date:
2 #)
[
QA Review Team ' Leader
/
8804260254 880415 PDR ADOCK 05000445 A
Y Chengo Notico: 001 QI-055 Revision 2 1.
Revise Note 1 on page 14 From:
"1.
In the course of inspection, the inspector shall note any item not covered by reinspection / verification which appear out of the ordinary as related to the construction of the inspected item or surrounding area.
Note such in the remarks column of inspection checklist and initiate an out-of-scope observation.
To:
"1.
DELETED" l
l l
l i
I