ML20151P712

From kanterella
Jump to navigation Jump to search
Change Notice 002 to Rev 1 to Instruction QI-022, Documentation Review of Piping Sys Bolted Joints/Matls
ML20151P712
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/22/1987
From: Schauf J, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20151P557 List:
References
QI-022-02, QI-22-2, NUDOCS 8804260237
Download: ML20151P712 (3)


Text

V P:g] 1 of 2 EVALUATION RESEARCH CORPORATION FOR INFORMATION ONLY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-5PECIFIC ACTION PLAN VII.c CHANGE NOTICE:

002 INSTRUCTION NO.: QI-022 REVISION NO.:

1 ISSUE DATE: 09-22-87 DOCUMENTATION REVIEW OF PIPING SYSTEM BOLTED JOINTS / MATERIALS The QI identified above is hereby changed as shown on the attached pages of this notice.

sc//

Date:

J//5/S7 Prepared by u

3 7

)

Approved by:

Date:

9 -//p -Q I

e Coordinator Approved by:

Date:

h-lTr - 3 7 On-Site QA Re @ entative Approved by:

4 Date:

9 2./

@7 QC Review Team Leader

/

/

8804240237 890415

'DR ADOCk 05000445 DCD

l Ching2 Notico 002 QI-022 Rev. 1 ITEM CHANGE TO QUALITY INSTRUCTION 1.

Page 5, Section 5.2 Revise Section 5.2 to read: Deleted 2.

Page 5, Section 5.3 Revise Section 5.3 to read' Deleted 3.

Page 5, Section 5.5 Revise Section 5.5 to read: Deleted 4.

Page 1 of 2 of the Documentation Review Checklist (Attachment 6.1)

Revise Attribute 2, 3 and 5 to read: Deleted

l II Attach;cnt 6.1

~ !

COMANCHE PEAK RESPONSE TEAM 91 022 i

CHECKLIST Rev. 1 i

Chance Notice 002 1

POPULATION DESC VERIFICATION PKG NO.

1 Piping System Bolted R-M-PBOM-PAGE 1 0F 2 Joints / Material QUALITY INSTRUCTION QI-022

([] REINSPECTION

[)) UNIT 1 EQUIPMENT MARK / TAG NO.

@ DOCUMENTATION REVIEW UNIT 2

((] COMMON VERIFICATION

^

RN ACCEPT REJECT DATE

1) Bolt / Stud / Cap Screw Verification IA) Q.C. Verification / Sign Off IB) Bolt / Stud / Cap Screw Nut Certification 1" Nominal Diameter and Smaller IC) Bolt / Stud / Cap Screw and Nut Color Code Verification-1" l

Nominal Diameter and l

Smaller l

ID) Bolt / Stud / Cap Screw and Nut Certi-fication-Greater than 1" Nominal Diameter

2) Deleted
3) Deleted l
4) Alignment Verification
5) Deleted l

PREPARED BY:

APPROVED BY:

DISCIDLINE ENGR.

DATE LEAD DISCIPLINE ENGR.

DATE l

INSPECTED BY:

APPROVED BY:

f

(

INSPECTOR DATE LEAD INSPECTOR DATE l

CPP-007.lA. Revision 0

-