I Pegs 1 of 2 FDPiINFORMAT10E ONLY EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLAN CHANGE NOTICE NO: 001 PROCEDUPI NO: CPP-006 REVISION:
3 ISSUE DATE:
12-21-87 SAMPLE SELECTION The CPP identified above is hereby changed as shown on the attached page of this notice.
Date:
/M -/7' E 7 Prepared by:
f Approved by:
Date:
/M /6-9 7 On-Site QA Regj;4sentative Approved by:
uu Date:
/2- / P ik7 Q
C Rsview Team Leader
/
/
t 8804260205 880415 PDR ADOCK 05000445 A
T-ri Ching2 Notica 001 CPP-006 Revision: 3 Page 2 of 2 1.
Page 7, Table 5.2-1, Systems Required for Safe Shutdown Add the following systems:
Reactor Coolar.t System Piping Feedwater - Auxiliary Feedwater Connection to Steam Generators This change was inadvertently omitted from previous revisions to the CPP. The change is a clarification of those systems required for safe shutdown as described in the CPSES FSAR and in the Attachment to Memo QA/QC-RT-2204. This change has no impact on previously performed work.