ML20151P624

From kanterella
Jump to navigation Jump to search
Notice of Cancellation of Rev 3 to Procedure CPP-018, Qa/Qc Interface W/Design Adequacy Program
ML20151P624
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/15/1987
From: Hodge D, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20151P557 List:
References
CPP-018, CPP-18, NUDOCS 8804260215
Download: ML20151P624 (1)


Text

VI Peg 2 1 of 1 EVALUATION RESEARCH CORPORATION FOR INFORMATION ONLY COMANCHE PEAK RESPONSE TEAM (CPRT)

PROJECT PROCEDURE FOR QA/QC ISSUE SPECIFIC ACTION PLANS NOTICE OF CANCELLATION PROCEDURE NO: CPP-018 REVISION: 3 ISSUE DATE: 12-16-87 QA/QC INTERFACE WITH THE DESIGN ADEQUACY PROGRAM The CPP identified above is hereby cancelled. Due to CPRT Program Plan changes (refer to the Senior Review Team Chairman's memorandum to Review Team Leaders [CPRT-876))he Director of Projects any future design-related concerns should be addressed directly to t

, TU Electric for further processing.

PREPARED BY:

h DATE:

/

/f/f7 v

(

/

APPROVED BY:

DATE:

Ik*/$-T ON-f/TEQAREPR NTATIVE APPROVED BY:

_,vA-DATE:

[/s QA/

REVIER TEAM LEADER

/

I l

i l

8804260215 880415 l

PDR ADOCK 05000445 l

A DCD L

p., q, \\

O FOR INi'ORMAJ!ON ONLY EVALUATION RESEARCH CORPORATION COMMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS NOTICE OF CANCELLATION

_ PROCEDURE NO: CPP-021 REVISION NO:

1 CHANGE NOTICE:

001 ISSUE DATE: 06-30-87 i

CPSES PROJECT CORRECTIVE ACTION l

l The CPP identified above is hereby cancelled. Implementation of CPSES Project corrective action is currently the responsibility of the CPRT.

(o[M [73-dj k Dater Prepared by:

i i v

Approved by:

Date:

[,-2d-T7 On-SiteQARepsentative

!Jd 87 Date:

Approved by:

u i

i y R.v1..,. t....r c 's.

ws g,a

--