Notice of Violation from Insp on 880808-19.Violation Noted: Records of Visual Insp Performed as Part of Safety Sys Outage Mod for Safety Insp Tank B Union Weld & Tib 3B & 3C Transformers Base Welds Not Prepared
ML20154L283
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/19/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20154L281 List:
References
50-285-88-25, NUDOCS 8809260138
Download: ML20154L283 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

. APPENDIX A NOTICE OF VIOLATION OmahaPublicPowerDistrict(OPPD) Docket: 50-285 Fort Calhoun Station Operating License: DPR-40 During an NRC inspection conducted on August 8-19, 1988, a violation of NRC requirements was identified. The violation involved the failure to maintain records. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFA Part 2. Appendix C (1988), the violation is listed below:

Failure to Maintain Records J,

j Criterion V of Appendix B to 10 CFR Part 50 and the licensee's approved quality assurance program require that the activities affecting quality be accomplished in accordance with documented instructions. Visual 2

i Examination Procedure Standing Order No. 26, Appendix G. Revision 26, 4 dated August 7, 1988, requires that a Visual Weld Examination Report Form No. FC-1103 be prepared after an examination.

i Contrary to the above, in ! e cases, records of inspection were not a prepared. In particular, :ords of visual inspection perfonned as part

of the safety system outage ' edification inspection followup for Safety 1 Inspection Tank B union weld and the TIB 3B and 3C transformers' base welds wer* not prepared.

This is a Severity Level V violation. (Supplement 1.0)(285/8825-01) j Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to submit to this office, within 30 deys of the date of the

! letter transmitting this Notice, a written statement or explanation in reply.

including for each violation: (1) the reason for the violation if admitted, j the corrective steps which have been taken and the results achieved, i the corrective steps which will be taken to avoid further violations, and

) the date when full compliance will be achieved. Where good cause is shown,

consideration will be given to extending the response time.