Forwards Insp Rept 50-285/88-25 on 880808-19 & Notice of Violation
ML20154L275
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20154L281 List:
References
REF-PT21-88 NUDOCS 8809260137
Download: ML20154L275 (2)


See also: IR 05000285/1988025

Text

, ._ _____ . _ - _ _ _ _ _ _ . ___ . - _ __ ._ _

, ,

h

' '

SEP l 919%

In Reply Refer To: $

'

Docket: 50-285/88-25

-

I

!

Omaha Public Power District l

ATTN: Kenneth J. Morris, Division Manager '

Nuclear Operations  !

1623 Harney Street

Omaha, Febraska 68102

Gentlemen:  ;

f

This refers to a special, announced inspection conducted by Region IV personnel l"

during the period August 6-19, 1988, of activities authorized by NRC Operating

License DRP-40 for Fort Calhoun Station, and to the discussion of our findings t

with Mr. W. G. Gates and other members of your staff at the conclusion of the  !

inspection. [

t

Areas examined during the inspection included followup to previous inspection

findings, licensee event reports (LERs), temporary instructions, 10 CFR Part 21 i

reports, bulletins, and the safety cystem outage modification inspection (SSOMI). i

Within these areas, the inspection consisted of selective examination of i

procedures and representative records, interviews with personnel, and  !

observations by the NRC inspectors. The inspection findings are documented in l

the enciesed inspection report. L

During this inspection, it was found that certain of your activitiet were in i

violation of NRC requirements. Consequently, you are required te respond to i

this violation, in writing, in accordance with the provisions of Section 2.201 f

of the NRC's "Rules of Practice," Part 2 Title 10. Code of Federal r

Regulations. Your response should be based on the specifics contained in the l

Notice of Violation enclosed with this letter. E

i

During this inspection, five items were identified that could not be closed due )

to the lack of generic corrective action. These items are identified in 6

paragraphs 2.1.6, 7.0.2, 7.0.3, 7.0.4, and 7.0.5 of the enclosed report. Your

acticns, to date, have addressed only the specific problem that was identified in 7

each case. In paragraph 7.0.5, guidance is provided relating to generic i

corrective action. This guidance addresses the potential for previous events

of a similar nature. We request that you review this guidanco and take action

on the generic o pects of these events. T

One unresolved item is identified in paragraph 2.5 of the enclosed inspection  !

report.

  • RIV:RI * R1 *RI *RI *C:TPS *D:DRS

TOMcKernon/cz JPStewart WMMcNeill JRBoardman WCSeidle JLHilhoan

/ /88 / /88 / /88 / /88 / /88 / /88  !

t

  • D:DRP i

LJCallan i

/ /88

  • previously concurred ph( l

!

b

D S b5

PNU '

'

gg  ;

O

l

_ _ _ _ _ _ - _ _ _ ____

_ _ _ _ _

, ,

1 i ,

Omaha Public Power District -2-

The response directed by this letter and the accompanying Notice is not subject

'

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions corcerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Oshinal sig,mt i',.

n. U. lt n 's

  • L. J. Callan, Director

i

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-285/88-25

cc w/enclost. ras:

Fort Calhoun Station

,

ATTN: W. G. Gates, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt. Esq.

LeBoeuf Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C. 20036

Nebraska Radiation Control Program Director

bec to DMB (IE01)

I

bec distrib. by RIV:

  • R.D. Martin, RA *RPB-DRSS
  • Section Chief (DRP/B) * MIS System
  • RIV File *DRP
  • RSTS Operator * Project Engineer DRP/B

Lisa Shea, RM/ALF *P. Milano, NRR Project Manager

  • DRS *RRI
  • J. Boardman *W. Seidle
  • T. McKernon *P. Stewart
  • W. McNeil
  • w/766