ML20127M812

From kanterella
Revision as of 14:38, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-341/92-21 on 921208-930119.No Violations Noted
ML20127M812
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/22/1993
From: Phillips M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Orser W
DETROIT EDISON CO.
Shared Package
ML20127M814 List:
References
NUDOCS 9301290019
Download: ML20127M812 (3)


See also: IR 05000341/1992021

Text

_ __ _ _-

, *

hCb(O(fb

JM"'FB qd$

Docket No. 50-341

The Detroit Edison Company

AllN: W. S. Orser

Senior Vice President

Nuclear Generation

6400 North Dixie Highway

Newport, MI 48166

Dear Mr. Orser:

This refers to the routine safety inspection conducted by Messrs. W. J. Kropp,

K. Riemer, and R. Twigg of this office from December 8, 1992, through

January 19, 1993. The inspection included a review of activities at your

fermi 2 facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed report.

Areas examined ouring the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

p

fp by& '

M. P. Phillips, Chief

Reactor Projects Section 28

Enclosures:

Inspection Report

No. 50-341/92021(DRP)

See Attached Distritmtion

8 4

fo 19 se

2800Nk SchumacMr

"h iillips

01/2s/93 01/p/9! 01/21/93 0-

'

9301290019 930122 Q

PDR ADOCK 05000341

0 PDR

_ . _

-

_

.

y .

.. ..- ,

1

The Detroit' Edison Co',,,pany 2

D_liitihUlie

cc w/ enclosure:

D. R. Gipson, Vice President,

,

' -

)

Nuclear Operations  !

John A. Tibai, Supervise l

of Compliance  :*

P. A. Marquardt, Corpt> rate

Legal Department

.

- DCD/DCB (R105)

OC/LTDCB -4

. Resident Ingoctor, Rll! .

James il Padgett, Michigan Public  :

Service Commission >

Michigan Department of *

-Public Health

Honroe County office of

Civil Preparedness

Fermi, LPM, NRR j

.

5

m i

,

'

,

k

N '

4

'

,

F

f

i

=

T

+ -

e 4.w b.r , wee _w +v ---e . .w-,,, , .ww.-, m - ~ .. - - ,,d ,,#w. - , ~ , . .--vr mi,- -<->- , . , . , , , - - - - - - , -.-w , , - - , , * , , - , , , , - , me 3. w

- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ - . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

g>stato UNITto ST Af ts

g- *g NUCLEAR REGULATORY COMMIS$10N

$ REGION lil

5

8, 4

f 199 ROOSEVELT RO AD

QL ON ELLYN, BLLlhOli 60137

%, /

  • ...* JAN .

'9

l

Docket tio. 50-341

l

The Detroit Edison company

ATill: W. S. Orser

Senior Vice President

flutlear Generation

6400 flerth Dixie Highway

Newport, MI 48166

Dear Mr. Orser:

Triis refers to the routine safety inspection conducted by Messrs, W. J. Kropp,

K. Riemer, and R. Twigg of this office from December 8, 1992, through

January 19, 1993. The inspection included a review of activities at your

fermi 2 facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with personnel.

No violations of f1RC requirements were identified during the course of this

inspection.

In accordance with 10 CfP, 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document roc,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

sQJ -

'

M. P. Phi lips, Chief

Reactor Projects Section 2B

Enclosures:

Inspection Report

No. 50-341/92021(DRP)

_Sre Attached Dist ributim