ML20127M812
| ML20127M812 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/22/1993 |
| From: | Phillips M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Orser W DETROIT EDISON CO. |
| Shared Package | |
| ML20127M814 | List: |
| References | |
| NUDOCS 9301290019 | |
| Download: ML20127M812 (3) | |
See also: IR 05000341/1992021
Text
_
__
_ _-
,
hCb(O(fb
qd$
JM"'FB
Docket No. 50-341
The Detroit Edison Company
AllN:
W. S. Orser
Senior Vice President
Nuclear Generation
6400 North Dixie Highway
Newport, MI
48166
Dear Mr. Orser:
This refers to the routine safety inspection conducted by Messrs. W. J. Kropp,
K. Riemer, and R. Twigg of this office from December 8, 1992, through
January 19, 1993.
The inspection included a review of activities at your
fermi 2 facility.
At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed report.
Areas examined ouring the inspection are identified in the report.
Within
these areas, the inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
p
fp by& '
M. P. Phillips, Chief
Reactor Projects Section 28
Enclosures:
Inspection Report
No. 50-341/92021(DRP)
See Attached Distritmtion
8 4 2800Nk
"h
fo 19 se
SchumacMr
iillips
01/2s/93
01/p/9!
01/21/93
0-
'
Q
9301290019 930122
ADOCK 05000341
0
_
_ .
.
_
-
y
.
. .
..-
,
1
The Detroit' Edison Co',,,pany
2
D_liitihUlie
cc w/ enclosure:
,
' -
D. R. Gipson, Vice President,
)
Nuclear Operations
John A. Tibai, Supervise
of Compliance
- *
P. A. Marquardt, Corpt> rate
Legal Department
- DCD/DCB (R105)
.
OC/LTDCB
- 4
Resident Ingoctor, Rll!
.
.
James il Padgett, Michigan Public
Service Commission
>
Michigan Department of
-Public Health
Honroe County office of
Civil Preparedness
Fermi, LPM, NRR
j
.
5
i
m
,
'
,
k
N '
4
'
,
F
f
i
=
T
+
-
e 4.w b.r , wee _w
+v
---e
.
.w-,,,
,
.ww.-,
m
- ~ .. - -
,,d
.
-
,,#w. - , ~ , .
.--vr
mi,-
-<->- , . , . , , , - - - - - - ,
-.-w
, , - - , , * , , - , , , , - , me
r---
3.
w
- - _ _ _ _ _ _ _ _
_
_ _ _ _ _ . - _ _ _
_ _ _ _ _ - .
_
_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
g>stato
UNITto ST Af ts
g-
- g
NUCLEAR REGULATORY COMMIS$10N
$
REGION lil
5
f
8,
4
QL ON ELLYN, BLLlhOli 60137
%,
/
- ...*
JAN
'9
.
l
Docket tio. 50-341
l
The Detroit Edison company
ATill:
W. S. Orser
Senior Vice President
flutlear Generation
6400 flerth Dixie Highway
Newport, MI
48166
Dear Mr. Orser:
Triis refers to the routine safety inspection conducted by Messrs, W. J. Kropp,
K. Riemer, and R. Twigg of this office from December 8, 1992, through
January 19, 1993.
The inspection included a review of activities at your
fermi 2 facility. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with personnel.
No violations of f1RC requirements were identified during the course of this
inspection.
In accordance with 10 CfP, 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document roc,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
QJ
'
-
s
M. P. Phi lips, Chief
Reactor Projects Section 2B
Enclosures:
Inspection Report
No. 50-341/92021(DRP)
_Sre Attached Dist ributim