Forwards Insp Repts 50-445/93-06 & 50-446/93-06 on 930113-22.No Violations Noted
ML20128L898
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/10/1993
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20128L903 List:
References
NUDOCS 9302220040
Download: ML20128L898 (5)


See also: IR 05000445/1993006

Text

  • .

jo asco,

y, f., NUCLEAR REGULATORY COMMISSION

,

ffW j nraioN ev

o, . " [ 611 RYAN PLAZA DHIVE SUITE 400

g- g An uNQ10N,1 E M AS M0118064

    • "*

FEB l 01993

Dockets: 50-445

50-446

License: NPF-87

Construction Permit: CPPR-l?7

TU Electric

ATTN: W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT 50-445/93-06; 50-446/93-06

This refers to the inspection conducted by Mr. P. Wagner, and the inspectors.

identified in the enclosed report, of this office on January 13-22. 1993. The

inspection included a review of activities authorized for your Comanche Peak

Steam Electric Station, Units 1 and 2, facility. At the conclusion of the-

inspection, the findings were discussed with those members of your Staff

identified in the enclosed report.

Areas examined during this inspection are identified in the enclosed report.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and review

of completed activities.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sir >c rely, I /

Co) ins, Direc

'

u

Division of(Reactor Safety

Enclosure:

Appendix - NRC Inspection Report

50-435/93-06 w/ Attachments.

50-446/93-06 w/ Attachments

cc w/ Enclosure: (see next page) l

I

9302220040 930210

PDR

Q

ADDCK 05000445-

PDR

% I

-)

_

-

.

.

.

TV Electric -2-

cc w/ Enclosure:

1U Electric

ATIN: Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

Engineering Organization

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

10 E!ectric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

Jorden, Schulte, and Burchette

ATTH: William A. Burchette, Esq.

Counsel for Tex-la Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

Washington, D.C. 20007

Newman & Holtzinger, P.C.

ATIN: Jack R. Newman, Esq.

1615 L. Street, N.W.

Suite 1000

Washington, D.C. 20036

Texas Department of Licensing & Regulation

ATTN: G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose Texas 76043

i

_ _ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _

._ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

.

-

,

i

.

10 Electric -3-

Texas Radiation Control Program I erector

1100 West 49th Street

Austin, Texas 78756

Owen L. Thero, President

Quality Technology Company

Lakeview Mobile Home Park, Lot 35

4793 E. Loop 820 South

fort Worth, Texas 76119

___ _________ -

. _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _

o ..

FEB l 01993

TV Electric -4-

NRC Inspection Report 50-445/93-05; 50-446/93-06

TL bec to-DMB (IE01) - DRS.

bec distrib. by RIV:

J. L. Milhoan Resident inspector (2)

DRP Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System

DRSS-flPS RSTS Operator

ProjectEngineer(DRP/B) RIV file

DRS Section Chief (DRP/TSS)

T. Westerman C. Johnson

P. Wagner W. McNeill

01 / st/

RIV:TL:DRS DRS/MS DRS/ES h /b RS:C:E b D: DRPH D:DRSdf

PWagner:cs CJohnson WMcNeill TFWesterman ABBeach / SJCollins

i /fft93 L /M/93 8

/d/93 A/ 9/93 2. /9 /93  %/ (Q93

19000<1

- _ - _ - _ _ _ _ _ _

FEB i 01993

l

TV Electric -4-

NRC Inspection Report 50-445/93-06; 50-446/93-06

bcc te DMB (IE01) - DRS

bec distrib. by RIV:

J. L. Milhoan Resident Inspector (2)

DRP Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503 HIS System

DRSS-FIPS RSTS Operator

Project Engineer (DRP/B) RIV File

DRS Section Chief (DRP/TSS)

T. Westerman C. Johnson

P. Wagner W. McNeill

_01 i s t&b

UV:ll:DRSR DRS/MS DRS/ES N hk RS:C:E b0:DRPkf D:DRS,M)

PWagner:cs CJohnson WMcNeill TFWesterman ABBeach

Y

SJCollin[

l 1/2893 I /;'/93 '///93 A/$/93 L /9 /93 S / ((793