Forwards Insp Repts 50-445/96-16 & 50-446/96-16 on 961221. Violations Noted:Operator Inattentiveness,Potential Supervisory Oversight Weaknesses & Inadequate self-verification
ML20133K923
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/16/1997
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20133K926 List:
References
NUDOCS 9701210406
Download: ML20133K923 (5)


See also: IR 05000445/1996016

Text

..

e

A

g* Nog UNiiED ST ATE S

  • J, ,. t, NUCLEAR REGULATORY COMMISSION

i HE GION IV

'. '

f 011 R Y AN PL AZA DRIVE, SUIT E 400

't AR LINGTON. T E X AS 76011 8064

3...+"

JAN I 61997

Mr. C. L. Terry

TU Electric

Group Vice President, Nuclear

ATTN: Regulatory Affairs Department

P.O. Box 1002

Glen Rose, Texas 76043

SUBJECT: NRC INSPECTION REPORT 50-445/96-16:50-446/96-16

Dear Mr. Terry:

On December 21,1996, the NRC completed an inspection at your Comanche Peak Steam

Electric Station, Units 1 and 2, reactor f acility. The enclosed report presents the scope

and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities was

generally characterized by safety-conscious operations and sound engineering and

maintenance practices. We are concerned, however, with the operations findings within

j Sections 01 and 05 of the enclosed report which reflect operator inattentiveness, potential

supervisory oversight weaknesses, and inadequate self-verification. Since a number of

these issues involve newly qualified reactor operators, we are concerned that the errors

may reflect operator training weaknesses and we plan to monitor the effectiveness of your

corrective actions to prevent these operator performance issues from recurring.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

'

) I h

"

h J. E. Dyer, Director

I Division of Reactor Projects

Docket Nos. 50-445

50-446

License Nos. NPF-87

NPF-89

9701210406 970116

PDR ADOCK0500g5

G

.

0

,

TU Electric 2-

Enclosure: l

NRC Inspection Report l

50-445/96-16:50-446/96-16 '

cc w/ enclosure:

Mr. Roger D. Walker

TU Electric

Regulatory Affairs Manager

P.O. Box 1002

Glen Rose, Texas 76043

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

TU Electric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

Washington, D.C. 20036

G. R. Bynog, Program Manager /

Chief Inspector

Texas Department of Licensing & Regulation

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

.

e

TU Electric -3-

Susan Rieff, Director

Environmental Policy

Office of the Governor

P.O. Box 12428

Austin, Texas 78711

!

.

4

s

TU Electric -4-

JAN I 6 IE7

l

l

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Richard Correia (RPC)

E-Mail report to Ronald Frahm, Jr. (RKF)

bec to DMB (IE01)

bec distrib. by RIV:

L. J. Callan Resident inspector (2)

DRP Director DRS PSB j

Branch Chief (DRP/A) MIS System

]

Project Engineer (DRP/A) RIV File i

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

1

1

l

1

DOCUMENT NAME: R:\ CPSES\CP616RP.ATG

To receive copy of document. indicate in box: "c" = Copy without enclosures "E" = Copy with e res "N" = No copy

RIV: SRI ,l C:DRP/A l_ D:DRP (p) EO N P(,}/ l

ATGody CC h JITapia (b JEDyerMD GFSanpofn

1/(397 f ( 1/l)/97 /~ 1/6/97

/ 1/ / 7 'j

OFFICIAL RECORD COPV

l

210001

_ _ _ _ . _ _ . _ _ _ . . _ - ._.__.m .m._

I

l

'

l

TU Electric -4- g lg gy

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Richard Correia (RPC)

E-Mail report to Ronald Frahm, Jr. (RKF)

bec to DMB (IE01)

bec distrib. by RIV:

L. J. Callan Resident inspector (2)

DRP Director DRS-PSB

Branch Chief (DRP/A) MIS System

Project Engineer (DRP/A) RIV File

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

DOCUMENT NAME: R:\ CPSES\CP616RP.ATG

To receive copy of document, Edicate in box: "c" = Copy without enclosures "E" = Copy with e res "N" = No copy

RIV: SRI ,

C:DRP/A D:DRP (of EO N P(/

ATGody CQ h JITapia Q][/ JEDyerMD GFSanpdrn

1/ ('j97  !) ( 1/[)/97 f 1// (,/97 1/,497

OFFICIAL RECORD COPV

_ _ . , , _ , _ - . . _

, ._.