ML20133N781

From kanterella
Revision as of 13:16, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 2 to EALs Which Incorporates Guidelines Contained in NUMARC/NESP-007, Methodology for Development of EALs & RAI Re Proposed Rev for NRC Review & Approval
ML20133N781
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/16/1997
From: Peveler K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Miraglia F
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133N784 List:
References
NEP-97-0001, NEP-97-1, TAC-M93692, NUDOCS 9701230405
Download: ML20133N781 (2)


Text

IES Utrlities Inc.

200 First Street S E.

PO. Box 351 Cedar Rapds. IA $2406-0351 Telephone 319 398 4411 UTILITIES January 16,1997 NEP-97-0001 Mr. Frank J. Miraglia, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-37 Washington, DC 20555-0001

Subject:

Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Proposed Revision to Emergency Action Levels

References:

1) Letter from L. Heckert (IES) to W. Russell (NRC) dated September 15,1995, NEP-95-0184
2) Letter from G. Kelly (NRR) to L. Liu (IES) dated December 6,1995 Duane Arnold Energy Center - Request for Additional Information on EAL Revision To NUMARC/NESP-007 Methodology (M93692)
3) Letter from K. Peveler (lES) to W. Russell (NRC) dated September 23,1996, NEP-96-0036 File: A-221

Dear Mr. Miraglia:

In Reference 1, IES Utilities Inc. submitted a Duane Arnold Energy Center (DAEC) proposed revision to the Emergency Action Levels for NRC review and approval. This submittal incorporates the guidelines contained in NUMARC/NESP-007," Methodology for Development of Emergency Action Levels (EALs)".

In Reference 2, your Staff requested additional information regarding the DAEC's proposed revision. Additionalinformation, along with a revised version of DAEC's proposed revision to EALs was submitted (Reference 3).

On October 23,1996 a teleconference was conducted between IES Emergency Planning staff and the NRR staff reviewer, at which time additional clarification of the utility f y' q responses was requested. These additional clarifications have been incorporated into DAEC's proposed revision as identified by " revision bars" along with a revised response document.

\ {

9701230405 970116 PDR ADOCK 05000331 F PDR. An IES Industnes Cornpary

Mr. Frank J. Miraglia NEP-97-0001 January 16,1997 Page 2 Should you have any questions regarding this matter, please contact Larry Heckert at 319-851-7016 or my office at 319-851-7801.

Sincerely, l

Kenneth E. /eveler Manager, Regulatory Performance l

KP/CT/kd  ;

Attaclunent l l cc: L. Root l G. Kelly (NRC-NRR)

A. B. Beach (Region III)

NRC Resident Office DOCU 4

I j