|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] Category:NRC TO ASLAP
[Table view] |
Text
- . _ _ _ _ _ _ _ _ - _ _ -___ _
,, CM MMDconam m*mRPrf;g
/ 'o, UNITED STATES
[ ' ; f.
,p, NUCLEAR REGULATORY COMMISSION 4 g cj W ASHINGTON, D. C. 20555
\ . . . . . p# .
August 19, 1985 h((ED Alan 5. Rosenthal, Chairman Thomas S. Moore 20 E2 '53 Atomic Safety and Licensing Appeal Board Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Howard A. Wilber Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, DC 20555 In the M'atter of DUKE POWER COMPANY, ET AL.
(Catawba Nuclear Station, Units 1 and 2)
Docket Nos. 50-413 and 50-414 0 L
Dear Members of the Appeal Board:
It has recently come to my attention that Duke Power Company has amended its Application for Licenses for the Catawba Nuclear Station, Units 1 and 2, to reflect the addition of Piedmont Municipal Power Agency--which now owns 25 percent of Unit 2--as one of the Applicants. For your information, I am forwarding to each of you and to each member of the service list a copy of Revision 3 to the License Application.
Sincerely, l Q'\ ./
b" ./ /N_
-eorge E Johnsbn Counsel for NRC Staff
Enclosure:
As stated cc w/ enclosure: Service list
/
g6 0
[BRS ABas!Si8*$a3 ;
DLHcE POWEIt GOMPANY P.O. box 33189 N* nmTTT., N.C. 28242 RAL B. TUCKER retarucu
== rea==== (704) or& sess May 17, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branc No. 4 Re: Catawba Nuclear Station' Docket Nos. 50-413 and 50-414
Dear Mr. Denton:
Duke Power Company is filing herewith Amendment 34 to its Application for Licenses for the Catawba Nuclear Station, Unit I which is in operation pursuant to facility operating license NPF-35 and Unit 2, which is under construction pursuant to Construction Permit CPPR-117. This filing includes three signed original copies of the amendment with the following attachment:
- 1. Revision 12 to the Final Safety Analysis Report for the Catawba Nuclear Station.
- 2. Revision 3 to the License Application.
This filing also includes 61 copies of Revision 12 to the Final Safety Analysis Report, 16 copies of Revision 3 to the License App 1tcation and 2 large scale copies of the piping and instrumentation diagrams which were revised by Revision 12 to the FSAR.
Changes to the Final Safety Analysis Report which are includnd in Revision 12 are identified in Enclosure 1.
Copies of this Amendment 34 have been distributed in accordance with the requirements of 10CFR 2.101 and the instructions contained in Mr. Darrell G.
Eisenhut's letter of June 2, 1981.
Respectfully submitted,
&b ,
91U Hal B. Tucker 3o 9 !
HBT/sfc .
3 L
"[
-eSos2ij g h ,, d
?"
4,65s w (w4p'f s ..
g
o I
CATAWBA NUCLEAR STATION License Application j Insertion Sheet l l
i l
Remove These Pages Insert These Pages Cover Sheet Through Page 18 Cover Sheet Through Page 20
(
(
)
i
} BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION I
l DOCKET NOS. 50-413 and 50-414 In the Matter of DUKE POWER COMPANY
( APPLICATION FOR LICENSES UNDER THE AT0!!IC ENERGY ACT OF 1954 AS AMENDED for CATAWBA NUCLEAR STATION Units 1 and 2 i
m
BEFORE THE
( UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-413 and 50-414 In The Matter of DUKE POWER COMPANY APPLICATION FOR LICENSES Duke Power Company for itself and as agent for the North Carolina Municipal Power Agency Number 1 (NCMPA-1), the North Carolina Electric Membership Corporation (NCEMC), the Saluda River Electric Cooperative,
( Inc. (Saluda River), and the Piedmont Municipal Power Agency (PMPA) hereby l
makes application, pursuant to the provisions of the Atomic Energy Act of 1954, ;
I as amended, and the Nuclear Regulatory Commission's Rules and Regulations 1 thereunder, for the necessary licenses to own, use and operate the utilization facilities herein after described as an integral part of a nuclear electric generating station to be located in York County, South Carolina, and to be known as the " Catawba Nuclear Station, Units 1 and 2".
This application has been combined for two proposed generating units pursuant to the provisions of 10 CFR 50.31. It consists of the following four parts:
1 (a) the general information required by 10 CFR 50.33, which is set out herein; -
(b) the technical information and safety analysis report required by 10 CFR 50.34, which is set out in a separate document entitled, " Duke Power Company, Catawba Nuclear Station, Units 1 & 2, Final Safety Analysis Report", forwarded herewith and made a part hereof; (c) the environmental information required by 1 Rev. 3
10 CFR 51, which is set ott in a separate document entitled, " Duke Power Company, Catawba Nuclear Station, Units 1 and 2, Environmental Report - Operating License Stage", forwarded herewith and made a part hereof; and (d) other material filed by Westinghouse Electric Corporation, Duke, or others independent of this application but made a part hereof where specifically referenced in one of the above documents.
GENERAL INFORMATION
- 1. Name of Applicants The applicants are Duke Power Company; North Carolina Municipal Power Agency Number 1 which owns a 75% undivided interest in Unit 2 and a 37.5%
interest in the Support Facilities; North Carolina Electric Membership Corporation which owns 56.25% of Unit 1 and 28.125% of the Support Fac-ilities; Saluda River Electric Corporative which owns 18.75% of Catawba Unit 1 and 9.375% of the Support Facilities; and Piedmont Municipal Power Agency which owns 25% of Unit 2 as tenants in common. Duke has exclusive responsibility for the design, construction and operation of the Catawba Nuclear Station.
- 2. Address of Applicants Duke Power Company 422 South Church Street Charlotte, NC 28242 North Carolina Municipal Power Agency Number 1 Suite 600 3100 Smoketree Ct.
Post Office Box 29513 Raleigh, NC 27G26-0513 North Carolina Electric Membership Corporation 3400 Sumner Boulevard Post Office Box 27306 Raleigh, North Carolina 27611 Saluda River Electric Cooperative, Inc.
P.O. Box 929 Laurens, South Carolina 29360 2 Rev. 3
Piedmont Municipal Power Agency 100 Memorial Drive
, Greer, SC 29651
- 3. Description of Business and Organization of Applicants Duke Power Company is primarily engaged as a public utility in the production, transmission and sale of electric energy in the central portion of North Carolina and the western portion of South Carolina, com-prising the area in both states known as the Piedmont Carolinas. Its service area covers approximately 20,000 square miles and has an estimated population of 4,300,000.
Duke serves more than a million customers and is the principal supplier of electric energy in 44 of 56 counties located in its service area. It supplies service directly to retail customers in 216 cities, towns and unincorporated communities. It also sells electricity through con-tractural arrangements to NCMPA-1, NCEMC, Saluda River and PMPA. It also sells at wholesale to approximately 8 other incorporated municipalities and to private utilities. The total installed capacity of Duke's electric utility plant as of March 1, 1984 was 13,594,000 KWe consisting of eight conventional steam electric stations with a capacity of 6,603,000 KWe, two nuclear steam electric stations with a capacity of 4,940,000 KWe, twenty-five conventional hydroelectric plants with a capacity of 842,000 KWe, a four unit pumped storage hydroelectric station with a capacity of 610,000 KWe, and twenty-eight independent combustion turbine and diesel generator peaking units with a capacity of 599,000 KWe.
NCMPA-1 is a public body corporate and politic and an instrumentality of the State of North Carolina, incorporated under North Carolina statutes on January 19, 1976. NCMPA-1 was created to plan, develop, construct, and
(
3 Rm. 3
operate generation and transmission facilities.
NCMPA-1 has become, I as of July 1,1983, the sole and exclusive bulk power supplier for nineteen political subdivisions in excess of any allotment of federal power from Southeastern Power-Administration.
NCEMC is a cooperative non profit electric membership corporation incorporated under North Carolina statutes on January 20, 1949. NCEMC has all of the powers necessary and convenient to engage in the generation, transmission, sale and supply of electric power and energy to rural districts in North Carolina. NCEMC is composed of twenty-seven (27) member cooperatives of whom ten (10) receive power and energy from Duke through the Catawba Agreements as of November 1, 1983, and who will directly participate in the output of Catawba Unit 1.
Saluda River is an electric cooperative incorporated under the laws of
( South Carolina on November 21, 1958. Saluda River has all of the powers necessary and convenient to engage in the generation, transmission, sale and supply of electric power and energy to rural areas in South Carolina.
Saluda River is composed of five (5) member cooperatives, all of whom receive power and energy from Duke through the Catawba Agreements as of November 1, 1983, and who will directly participate in the output of Catawba Unit 1.
PMPA is a public body corporate and politic of the state of South Carolina, incorporated under South Carolina statutes in 1979. PMPA was created to plan, develop, construct, and operate generation and transmission facilities. PMPA expects to become not later than July 1985, the sole and exclusive bulk power supplier for its ten municipal
- members for all power supply requirements in excess of any allotment of federal power from Southeastern Power Administration.
A hv 3
- 4. Organization and Management of Applicants I
Duke Power Company is a corporation organized and existing under the laws of the State of North Carolina, and its principal office is located in Charlotte, North Carolina ' ta the address stated above. It is domesti-cated and authorized to transact business as a public utility in the State of South Carolina.
Duke Power Company is not owned, controlled or dominated by an alien, a foreign corporation or foreign government. All of Duke's principal offi-cers and its directors are citizens of the United States.
Their names and business addresses are as follows:
DIRECTORS
( Name Address Naomi G. Albanese Greensboro, North Carolina Douglas W. Booth Charlotte, North Carolina Thomas H. Davis Winston-Salem, North Carolina Robert C. Edwards Clemson, South Carolina John L. Fraley Cherryville, North Carolina Alester G. Furman, III Greenville, South Carolina Steve C. Grif fith, Jr. Charlotte, North Carolina William H. Grigg Charlotte, North Carolina Paul H. Henson Kansas City, Missouri George H. Herbert Durham, North Carolina John D. Hicks Charlotte, North Carolina James V. Johnson . Charlotte, North Carolina a
W. W. Johnson Columbia, South Carolina 5 Er- 3
d DIRECTORS (cont'd)
I f
Name Address William S. Lee Charlotte, North Carolina Buck Nickel Greenville, South Carolina Reece A. Overcash, Jr. Dallas, Texas Warren H. Owen Charlotte, North Carolina James C. Self Greenwood, North Carolina Marceo A. Sloan Durham, North Carolina Austin C. Thies Charlotte, North Carolina 4
(
PRINCIPAL OFFICERS i
W. S. Lee, Chairman of the Board and Chief Executive Officer Charlotte, North Carolina D. W. Booth, President and Chief Operating Officer Charlotte, North Carolina W. H. Grigg, Executive Vice President, Finance Administration Charlotte, North Carolina A. C. Thies, Executive Vice President, Transmission, Distribution, & Electric Operations Group Charlotte, North Carolina W. H. Owen, Executive Vice President, Engineering, Construction and Production Group Charlotte, North Carolina John D. Hicks, Senior Vice President, Public Affairs Charlotte, North Carolina Steve C. Griffith, Jr., Senior Vice President General Counsel Charlotte, North Carolina Donald H. Denton, Jr., Senior Vice President, Marketing and Rates Charlotte, North Carolina Henry L. Cranford, Senior Vice President Division Operations Charlotte, North Carolina W. A. Coley, Vice President Operation Charlotte, North Carolina John F. Lomax, Vice President, Western Division Hickory, North Carolina James R. Bavis, Vice President Human Resources Charlotte, North Carolina Thnmas C. Berry, Vice President, Southern Division Greenville, South Carolina S. K. Blackley, Jr. , Vice President Transmission Charlotte, North Carolina Robert L. Dick, Vice President Construction Charlotte, North Carolina George W. Ferguson, Jr., Vice President and Deputy General Counsel, Governmental Affairs Charlotte, North Carolina E. O. Ferrell III, Vice President Northern Division Winston-Salem, North Carolina r
PRINCIPAL OFFICERS (cont'd) l
(
E. N. Hedgepeth, Jr., Vice President, ;
Distribution Charlotte, North Carolina !
D. E. Lennon, Vice President & Tax Counsel Charlotte, North Carolina Dwight B. Moore, Vice President, Central Division. Charlotte, North Carolina William O. Parker, Jr. , Vice President, Fossil Production Charlotte, North Carolina R. B. Priory, Vice President Design Engineering Charlotte, North Carolina Hal 8. Tucker, Vice President, Nuclear Production Charlotte, North Carolina Ralph W. Bostian, Vice President, Production Support Department Charlotte, North Carolina Paul G. Martin, Jr. , Vice President, Eastern Division Charlotte, North Carolina J. Kenneth Clark, Vice President, t Corporate Communications Charlotte, North Carolina George E. Stubbins, Vice President, Information Systems Charlotte, North Carolina Fred E. West, Jr. , Vice President, Charlotte Division Charlotte, North Carolina William R. Stimart, Vice President, Regulatory Affairs Charlotte, North Carolina James W. White, Vice Fresident, General Services Charlotte, North Carolina S Rev. 3
NCMPA-1 is not owned, controlled or dominated by an alien, a foreign corporation
, or foreign government. NCMPA-l's office is located in Raleigh, North Carolina at the address stated above.
The names and business addresses of NCMPA-l's Board of Commissioners and its staff, all of whom are citizens of the United States are as follows:
BOARD OF COMMISSIONERS Name Address George W. Clay, Jr. , Chairman Shelby, North Carolina Earle E. Riddle, Vice Chairman Lexington, North Carolina David Lowe, Secretary-Treasurer Lincolnton, North Carolina Jack F. Neel Albemarle, North Carolina H. Max Gunter Bostic, North Carolina William M. Edwards Cherryville, North Carolina
( James L. Dorton Concord, North Carolina Nannie H. Potts Cornelius, North Carolina Morris Baker Drexel, North Carolina Ronnie E. Ransom Gastonia, North Carolina A. W. Huf fman, Jr. Granite Falls, North Carolina Judy Mendenhall High Point, North Carolina Marion Sparrow Huntersville, North Carolina W. C. Deadmond Landis, North Carolina David R. Walker Maiden, North Carolina J. E. Hinkel Monroe, North Carolina Molly M. Darwin Morganton, North Carolina R. Duke Whisenant Newton, North Carolina Margaret Wingate Pineville, North Carolina William T. Gill Statesville, North Carolina 9 Rev. 3
STAFF
, James T. Bobo, General Manager Raleigh, North Carolina Open Director - Finance and Administration William G. Wemhoff, Director - Raleigh, North Carolina Engineering NCEMC is not owned, controlled or dominated by an alien, a foreign cor-poration or foreign government. NCEMC's office is located in Raleigh, North Carolina at the address stated above.
The names and business addresses of NCENC's Board of Directors, all of whom are citizens of the United States, are as follows:
President: Mr. Marvin 0. Marshall South River EMC 701 East Broad Street Post Office Drawer 931
( Dunn, North Carolina 28334 Vice President: Mr. Phillip L. Wally Union EMC 610 Patton Avenue Post Office Box 430 Monroe, N.C. 28110 Secretary / Mr. Wayne Keller Treasurer: Blue Ridge EMC Caller Service 112 Lenoir, NC 28645 l Mr. Dorris B. White Mr. David M. Chadwick Albemarle EMC Carteret-Craven EMC U.S. 17 Business North Route 2 - Box 620 Post Office Box 86 Beaufort, NC 28516 Hertford, NC 27944 Mr. Donald D. Rice Mr. L. Reid Harris Crescent EMC Central EMC Post Office Box 1150 304 South Steel Street p Statesville, NC 28677 Post Office Box 1107 Sanford, NC 27330 i
10 Rev. 3
Mr. David J. Batten Mr. Wayne Wilkins Brunswick EMC Davidson EMC i Post Office Box 826 South Main Street Shallotte, NC 28459 Post Office Box 948 Lexington, NC 27292 Mr. Fred J. Neuman Mr. Noel Lee, Jr.
Cape Hatteras EMC Edgecombe-Martin Co. EMC Pcst Office Box 9 Route 3 - Box 556 Buxton, NC 27920 Washington, NC 27889 l Mr, Mark A. Suggs Mr. Ronnie Hunt l
Pitt & Greene EMC Lumbee River EMC West Wilson Street 601 East Fourth Avenue Post Office Box 249 Post Office Box 830 Farmville, NC 27828 Red Springs, NC 28377 Mr. Bob McDuffie Mr. Emmett Patterson Randolph EMC Pee Dee EMC Corner Patton Ave./ Hwy. 42 201 East Morgan Street Post Gffice Box 40 Post Office Box 859 l Asheboro, NC 27203 Wadesboro, NC 28170 Mr. Eugene W. Brown, Jr. Mr. Earl J. Ross Roanoke EMC Piedmont EMC l Highway 250 North 129 East Tryon Street Fost Office Box 440 Post Office Drawer 1179 Rich Square, NC 27869 Hillsborough, NC 27278 7
Mr. Joseph N. Quinn Mr. J. Kelly Hutchens Rutherford EMC Surry-Yadkin EMC Route 3, Box 194-X 812 South Main Street Marion, NC 28752 Post Office Box 305 Dobson, NC 27017 Mr. Michael Finney Mr. Glenn A. Carowan Halifax EMC Tideland EMC 208 West Whitfield Street Post Office Box 158 Post Office Box 667 Pantego, NC 27860 Enfield, NC 27823 Mr. E. Travis Davis, Jr. Mr. Robert S. Holmes Harker*, Irland EMC Tri-County EMC Post Office Box 198 1304 North William Street Harkers Island, NC 28531 Post Office Box 28 Goldsboro, NC 27530 Mr. John Browning Mr. James E. Mangum Haywood EMC Wake EMC j 1819 Asheville Road 414 East Wait Avenue
! Post Office Drawer 9 Post Office Box 872
} Waynesville, NC 28786 Wake Forest, NC 27587 I
11 Pev. 3
Mr. Alvin C. Morton Mr. L. P. Beverage Jones-Onslow EMC Four County EMC
, 259 Western Boulevard 605 Fremont Street Jacksonville, NC 28540 Post Office Box 667 Burgaw, NC 28425 l
l Saluda River is not owned, controlled, or dominated by an alien, a foreign corporation or foreign government. Saluda River's office is located in Laurens, South Carolina at the address stated above.
The names and business addresses of Saluda River's Board of Directors, all of whom are citizens of the United States, are as follows:
President: Mr. James A. Darby York Electric Cooperative, Inc.
York, South Carolina 29745 Executive Vice- Mr. Joseph W. Mulholland President: P.O. Box 929 Laurens, South Carolina 29360 Vice President: Mr. Joe L. White Little River Electric Cooperative, Inc.
Abbeville, South Carolina 29620 Secretary / Mr. J. David Wasson, Jr.
Treasurer: Laurens Electric Cooperative Laurens, SC 29360 Mr. Charles E. Dalton Mr. Joe L. White Mr. David W. Stribling Mr. John M. Gantt Blue Ridge Electric Little River Electric Cooperative, Inc. Cooperative, Inc.
Gaffney, SC 29340 Abbeville, SC 29620 Mr. R. C. Carroll Mr. Robert O. Williams Mr. Conway Sutton York Electric Broad River Electric Cooperative, Inc.
Cooperative, Inc. York, SC 29745 Gaffney, SC 29340 Mr. J. David Wasson, Jr.
Mr. Ralph Hendrix Laurens Electric Cooperative, Inc.
I Laurens, SC 29360 12 Rev. 3
PHPA is not owned, controlled, or dominated by an alien, a foreign
- corporation or foreign government. PHPA's office is located in Greer, South Carolina at the address stated above.
The names and business addresses of PMPA's Board of Directors, all of i
whom are citizens of the United States, are as follows:
Chairman: Joe B. Lanford City of Rock Hill P.O. Box 11706 Rock Hill, SC 29371-1706 Vice-Chairman: J. Russell Allen City of Clinton P.O. Drawer 748 Clinton, SC 29325 Secretary: Kenneth Barnett Utilities Department P.O. Box 'K' Union, SC 29379 Treasurer: Terry Hill
( Board of Public Works P.O. Box 64 l Gaffney, SC 29342 1 David H. Krumwiede City of Abbeville Richard S. Hale City of Easley Jack E. Millwood City of Gaffney I
Kenneth Smith City of Greer Samual R. Wallace City of Laurens John C. Eargle, Sr. City of Newberry T. D. Sherbert, Jr. City of Union Howard S. Adams Town of Westminster l
)
None of the applicants are acting as an agent or representative of i
another person in filing this application.
'. l l
l
}) Or- ? )
{
J
- 5. Class and Period of License Applied for and Use to Which Facilities I Will be Put The license hereby applied for is a class 103 operating license as defined by 10 CFR 50.22. It'is requested for a period of forty (40) years from the date of issuance of the operating license. Applicants further request such additional source, special nuclear, and by product material licenses as may be necessary or appropriate to the acquisition, construction, possession, and operation of the licensed facilities and for authority to store irradiated fuel from other Duke nuclear facilities.
At present, Duke has no specific plans to utilize this storage alternative but, rather, considers it prudent planning to have this storage as one of the alternatives available.
This application also requests that the operating license so issued authorize the NCMPA-1, NCEMC, Saluda River and PMPA an undivided owner-
[
ship interest in source, special nuclear and by product material to be possessed by Duke in operation of the Catawba Nuclear Station.
The facilities will be used for the generation of commercial electric energy for transmission and sale to customers of Duke, NCMPA-1, NCEMC, Saluda River and PMPA. They will include two pressurized water reactors to be known as " Catawba Nuclear Station, Units 1 and 2." It is expected that each unit will be capable of an output of 3427 MWt (including 16 MWt contribution from reactor coolant pumps) corresponding to a net electrical capability of about 1145 MWe. All physics and core thermal hydraulics in-formation in the attached Final Safety Analysis Report is based upon the )
l reference core design of 3411 MWt. Site parameters, Containment, l Engineered Safety Features, and certain hypothetical accidents are la Pev. 3 l
4
evaluated for an NSSS power output of 3581 MWt. The Westinghouse
( Electric Corporation will supply the design and fabrication for the first core for each of the two nuclear generating units.
- 6. Financial Qualifications of Applicants Duke estimates that the total cost of the Catawba Nuclear Station, Units 1 and 2, including the initial core for each unit, will be approximately
$4,135,846,000 based on the following breakdown:
INITIAL TOTAL PLANT TOTAL PLANT FUEL CORES PLUS INITIAL FUEL Direct Cost at Commercial OperationU)2,530,945,000 160,081,000 2,694,994,000 Allowance for Funds ( )
During Const. 1,369,055,000 71,797,000 1,440,852,000 Property Taxes During Const. - - -
( Total Costs ( ) 3,900,000,000 235,846,000 4,135,846,000 (1) Excludes profits and fees paid Duke by NCMPA-1, NCEMC, Saluda River and/or PMPA (2) Reflects Duke AFOC on entire station and does not reflect NCMPA-1, NCEMC, Saluda River or PMPA financing costs.
(3) Reflects approved 1/84 cost estimate.
The financial qualifications of Duke Power Company to engage in the pro-l posed activities are evidenced by the financial data contained in its an-nual report to shareholders for the year 1979 a copy of which is attached hereto as Exhibit I. The financial qualifications of NCMPA-1 and PMPA to engage in the proposed activities are evidenced by the financial statements attached hereto as Exhibit II and Exhibit III respectively.
Construction of the Catawba Nuclear Station will be financed as an ,
l integral part of Duke's total construction program. Funds required of l 15 Pe. 3
i i
I Duke for the construction program will be obtained from' retained 4 earnings, provisions for depreciation and other internal sources, and through shortterm borrowings and the issuance and sale of securities.
NCMPA-1 intends to issue and sell its electric revenue bonds in amounts sufficient for NCMPA-1 to pay to Duke its obligations for the cost of the planning, design, licensing, acquisition, construction and completion of ,
1 75% of Catawba Unit 2 and 371/2% of the cost of the Support Facilities. j PMPA intends to issue and sell its electric revenue bonds in amounts j sufficient for PMPA to pay to Duke its obligations for the cost of the i planning, design, licensing, acquisition, construction and completion of ;
25% of Catawba Unit 2.
NCEMC and Saluda River have obtained loans from the Federal Financing Bank guaranteed by the Rural Electrification Administration ("REA") in i
amounts sufficient for NCEMC and Saluda River to pay to Duke amounts equal to the following percentages applied to the aggregate cost of the planning, design, licensing, acquisition, construction, and completion of Catawba Unit 1, Catawba Unit 2, and the Support Facilities: NCEMC -
28.125% of Catawba Units 1 and 2 and 28.125% of the Support Facilities; Saluda River - 9.375% of Catawba Units 1 and 2 and 9.375% of the Support Facilities.
The estimated annual costs for the first five full years of operation '
I for Catawba Nuclear Station are noted in Table 1.3.1-3 of the Environmental Report - Operating License Stage.
The estimated cost of decommissioning the station, considering the
( immediate dismantlement option currently considered most appropriate y Nv, 3
1
+ 1 by the MRC, is $100 million ($1978) for both Catawba units; The funds i necessary to operate and shutdown the facility will be derived from the electrical operating revenues. l Duke will obtain on behalf of the owners all required and appropriate property and liability insurance for the Catawba Nuclear Station and its fuel and will advise the Commission accordingly.
- 7. Site Location and Completion Dates The Catawba Nuclear Station site is located on the shore of Lake Wylie which is impounded by Applicant's Wylie Dam completed in 1925. The dam, lake and hydroelectric station are covered by Federal Energy Regulatory Commission license #2232 granted to the Duke in 1958 for the Catawba-Wateree Project. That license specifically covers the use of Lake Wylie waters as condenser cooling water for a steam generating plant at this site.
Duke's projected load requirements will necessitate full power operation of Catawba Nuclear Station, Unit 1, by June 1985, and Unit 2, by June 1987. The date for completion of construction of Unit 1 is estimated to be May 1984. While the official schedule for construction completion on Unit 2 is October 1986, an accelerated target schedule of January 1986 l
has been set and is currently being met.
l Construction Permit No. CPPR-116 currently indicates the date for completion of Unit 1 is March 1, 1984. An application for an extension l of the construction permit has been filed requesting a new completion l
date of November 1, 1984. Construction permit No. CPPR-117 indicates the l
1, ~ ,
date for completion of Unit 2 is September 1, 1985. A request for an extension of the construction permit will be filed at the appropriate time.
- 8. Regulatory Agencies and Area Newspapers The applicants are located in the Piedmont section of North and South Carolina. The following regulatory agencies have jurisdiction over the rates and services that would be incident to the Catawba Nuclear Station:
The Public Service Commission of South Carolina Owen Building 1321 Lady Street P. O. Box Drawer 11649 Columbia, South Carolina 29211 North Carolina Utilities Commission P. O. Box 991 Raleigh, North Carolina 27602 Federal Energy Regulatory Commission
( Washington, DC 20426 The following are the news publications which circulate in the area uf the Catawba Nuclear Station:
South Carolina FORT MILL TIMES (weekly)
Fort Mill, SC 29715 CLOVER HERALD (weekly)
Clover, SC 29710 YORK OBSERVER (weekly)
P. O. Box 2913 CRS York, SC 29730 YORKVILLE ENQUIRER (weekly)
York, SC 29745 ROCK HILL EVENING HERALD (daily)
Herald Publishing Company 132-136 W. Main Street Rock Hill, SC 29730
\
ROCK HILL TIMES (weekly)
P. O. Box 10146 Rock Hill, SC 23731 Pet '
i
North Carolina BELMONT BANNER (weekly)
Belmont, NC 28012 THE GASTONIA GAZETTE (daily) 2500 Wilkinson Boulevard Gastonia, NC 28052 THE CHARLOTTE OBSERVER (daily)
Knight Publishing Company 600 South Tryon Street Charlotte, NC 28201 THE CHARLOTTE NEWS (daily)
Knight Publishing Company 600 South Tryon Street Charlotte, NC 28201
- 9. Restricted Data This application does not contain any Restricted Data or other defense information, and it is not expected that any will become involved.
However, the applicants agree that they will not permit anyone to have access to such information if it does become involved and will not permit
( any individual to have access to Restricted Data until the Civil Service Commission shall have made an investigation and a report to the Nuclear Regulatory Commission on the charac'ter, association and loyalty of such individual, and the Nuclear Regulatory Commission shall have determined that permitting such person to have access to Restricted Data will not endanger the common defense and security.
i
- 10. Communications It is requested that communications pertaining to this application be sent to:
Hal B. Tucker Vice President, Nuclear Production Duke Power Company ,
i P. O. Box 33189 l 422 South Church Street l Charlotte, North Carolina 28242 19 Rev. 3
i In addition, it is requested that ;opies of each communication be sent to:
Mr. W. L. Porter Duke Power Company P. O. Box 33189 422 South Church Street Charlotte, NC 28242 North Carolina Municipal Power Agency Number 1 Suite 600 3100 Smoketree Ct.
Post Office Box 29513 Raleigh, North Carolina 27626-0513 Mr. C. D. Markham Power Systems Division Westinghouse Electric Corporation P. O. Box 355 Pittshrgh, Pennsylvania 15230 J. Michael McGarry, III, Esq.
Bishop, Liberman, Cook, Purcell and Reynolds 1200 Seventeenth Street, N.W.
/ Washington, DC 20036 Manager Licensing Information Service NUS Corporation ,
2536 Countryside Boulevard Clearwater, Florida 33515 North Carolina Electric Membership Corporation 3400 Sumner Boulevard Post Office Box 27306 Raleigh, North Carolina 27611 Saluda River Electric Cooperative, Inc. i P.O. Box 929 '
Laurens, South Carolina 29360 l
Piedmont Municipal Power Agency '
100 Memorial Drive Greer, South Carolina 29651 i
20 Kev. 3