Text
~ ~ ~
p reau
[*-
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20555-0001
/
April 12,1999 MEMORANDUM FOR:
Docket File FROM:
Peter S. Tam, Senior Project Manager, Sect' 1
]
Project Directorate ll Division of Licensing Project Managemen Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 176 and 168 TO OPERATING LICENSES (TAC MA4623 AND MA4624)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.176 (for Unit 1) and 168 (for Unit 2),
regarding the Fuel Handling Ventilation Exhaust System on March 26,1999.
I Docket Numbers 50-413 and 50414 Distribution Docket file PUBLIC l
R. Emch 9904190225 990412
~
PDR ADOCK 05000413 P
PDR I
1
04/12/99 MON 12:44 FAI
[d002 Nuclear Policy Manual-Volume 2 NSD Appendix D. 221. Implementation Sheet j
APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET i
\\
)QCNS O MNS O ONS UNIT NO. Q 1 (2 0 3 TS NO.
'3. 7,l3 DATE RECEPICD 3 Il-AMENDMENT. NO.D /It DESCRIPTION MD p,
JR 5. 7. / 7, y Jo t
PLOW /h7r is lv0sc ernt/r n F Tu r:Aur PmTh/A/
l
- 1. BIPLEMENTATJ N DATES clf T/
A. NRC ISSUE DATE (Date of NRC Cover letter):
l B. NRC IMPLEMENTATION DATE (From Text of NRC letter): l#dJ/P/
l C. STATION IMPLEhESTATION DATE r/r/PfM 4C/ii/c#'
l
~ ' '
l (No later than NRC Implementation Date):
- 2. PLAST NOTIFICAllON
/
Via E-Mail Distribution; Include Site Techmeal Contacts
- 3. RGC TECIINICAL CONTENT REVIEW CRFIERIA O
A. All Discrepancies llave Been Resolved Via NRC Interface.
5 B. No Inadvertent Changes Were Made To TS Sheets involved.
Ri C. TS Change Was Issued As R ed By DPC.
vw O k!f[
TECHNICAL REVIEWER:
(List Discrepancies Attached Date CIIECKED BY:
fl1M%
nA./
9!&hf (List Discrepancies On Attached Page)
Date
- 4. PIP NUMBER (If generated):
'D-C'I847f7 0-M-Ef8I j
[MO
- 5. bl ALL APPLICABLE RRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED 3kl.!'77 gVERIFIED BY:
i/
fitz.) vNTIL
[egulatory Compliance Date
- 6. )( ALL PRE IMPLEMENTATION IFEMS (ITEMS 1-5) COMPLETED3 Ik7 VERIFIED BY:
r -
v MVRegulatory Compiance Date l
- 7. FINAL BIPLEMENTATION iPPROVAL rJlA n!{n Managh, Regulatory Compliance Date j
Afffr nff A Manager, Safety Assurance Date
/
- Approval may be waived (see 221.8 Item 6).
(30 SEPT 1998)
D-221-33