ML20154N266
| ML20154N266 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/16/1998 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-MA2461, TAC-MA2462, NUDOCS 9810210232 | |
| Download: ML20154N266 (2) | |
Text
-.
~.
.~
_.~
.p+***vq,k
~
UNITED STATES p
g j
NUCLEAR REGULATORY COMMISSION o
4 WASHINGTON, D.C. 20666-0001 l
s
/
October 16,1998 MEMORANDUM FOR:
< Docket File -
FROM:
Peter S. Tam, Senior Project Manage Project Directorate ll-2 m
Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation /
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 171 and 164 TO OPERATING LICENSES (TAC MA2461 AND MA2462)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the Implementation of operating license Amendment Nos.171 (for Unit 1) and 164 (for Unit 2) on October 7,1998.
f Docket Numbers 50 413 and 50-414 Distribution Docket file PUBLIC
)
H. Berkow 9810210232 981016 PDR ADOCK 05000413 P
' ' n'43 c{u,\\ y p.a.:
L..
a _ a W,l ti lt t *J L.
~;
e n, myy i
g (.
10/16/98 FRI 00:20 FAI
[iD 003 Nuclear Eolicy Manual - Velume 2 NSD Appendix D. 221. Implementulon Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET 1
j FACILITY OPERATING LICENSE / TECHNICAL SPECIHCATIONS AMENDMENT IMPLEMENTATION SHEET WCNS O MNS O ONS UNIT NO dEPd O 3 j
7,kk8[Vb T/.dhk6 TS NO.
'f. 8. l. l.1.b A DATE RECEIVED AhENDMENT. NO.
MI N DESCRIPTION De O f' d
'4.F.I.1.A.h,'.L.
/
twcA.6 FD risk-m.rr,rw +<rMc..
U sV d
- 1. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover Letter):
- 7 #T
[UI Nel2[Tf [U L B. NkC. EFFECTIVE DATE (From Text of NRCIetter): 9!T!M[Uf 9!
T((V.b l
C. STATION IMPLEMENTATION DATE (No later than NRC Effective Date): 9[(Ohf[U J.$hf[
- 2. PLANT NOTIFICATION dtye, 4f20hf initial.t I
f4 / / 9 fro #fVia E-Mail Distribution; Include Site Technical Contacts 1
- 3. RGC TECHNICAL CONIENT REVIEW CRITERIA 0). All Discrepancies Have Been Resolved Via NRC Interface.
W B. No inadvertent Changes Were Ma To TS Sheets Involved.
7' C. TS Change Was issued As Re d y DPC.
9,!/0!92
[
TECHNICAL' EVIEWER:-
R v
(List Discrepancies Att Page)
Date 4/ /#/96 [4[F*[f9 CHECKED BY:
(I.ist Dtscrepancie[On Attached Page)
Date *
- 4. PIP NUMBER (If generated):
V[A l
5.h ALL APPLICAELE C CTIVE ACTIONS FROM ASSIGNED PIP COMPLETED
- 7 nb 9,!f0,fff VERIFIED BY:
,(,
Reguidory Compliance Date l
- 6. Ef"ALL PRE-IMP ON ITEMS (ITEMS 1-5) COMPLETED 9 !70 [7 7 l
VERIFIED BY:
O l
Regbory Compliance Date l
- 7. FINAL IMPLEMENTATION APPROVAL A/
[#L._
I l
Manager, Regulatory Compliance L6te t\\l"lfr WlA l
l Manager, Safety Assuance.
Date
.