ML20248A960

From kanterella
Jump to navigation Jump to search

Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526
ML20248A960
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/26/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA0359, TAC-MA0360, TAC-MA359, TAC-MA360, NUDOCS 9806010114
Download: ML20248A960 (2)


Text

_ _ _ _ - _ _ _ _

? "% 4,, . ~ ~

p & UNITED STATEE g j

'f NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C. 20565 4001

%4 4o May 26,1998 MEMORANDUM FOR: Docket File -

FROM: Peter S. Tam, Senior Project Manage Project Directorate ll-2 +

Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

[ ~

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 164 and 156 TO OPERATING LICENSES (TAC MA0359 AND MA0360)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.164 (for Unit 1) and 156 (for Unit 2) on May 26,1998.

Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC H. Berkow I

l

\

9806010114 980526 9?

I PDR ADOCK 05000413 l P PDR

'. J U gne RLE CENTB3 CM

e, e 0.s r~ .%

Nuclesr Policy Mammal - Volemne 2 NSD Appendix D. 221. Implementation Sheet i

APPENDIX D. 221. FACILITY OPERATING I LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACIIIIY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEER CNS O MNS O ONS UNIT NO. Ik203 TS NO.k(.umOpeynw. Ide@ ATE RECEIVED S f 27 / 9 gr AMENDMENT. NO.I (A fI% DESCRIPTION Rs st tu , yq i,%

N CG6 UE'Y io (ji dalda km4,_ <Ma-L CAllu0 (a dd2A wm

{g ggg% m* (::0m.M. oN c_oim.hs., a-4(c0tw.oq W%.

A. NRC ISSUE DATE (Date of NRC Cover Letter):

B. NRC EFFECTIVE DATE (From Text of NRC letter): 4 23b P l C. STATION IMPLEMENTATION DATE C',1 ^-- ' M".C ~ -l- ' -): 5bbp

2. PLANT NOTIFICATION initialr date P%L

~

l / 'lh3bvVia E-Mail Distnbution: Include Site Techniem1 Contacts

3. RGC TECHNICAL CONTENT REVIEW CRTIERIA

[A. All Discrepancies Have Been Resolved Via NRC Interface.

O B. No Inadvertent (~hanes Were Made To TS Sheets Involved.

f A am ,

l 0 C. TS Change Was Issued As ysted B DPC. SM  %~

TECHNICAL REVIEWER: [ f 2 f!98 (Ilst Discrepancies On At Page)s Dah CHECKED BY: '

M ideg E 'd^'

(I.ist Discrepancies On Attached PaEt)

@M.%- f% .

4. PIP NUMBER (If generated): O-C % - la 2_. l l 5 ALL APPLICABLE CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY: b $ M--[n . # # 2_l9V

'\ '

I u - a <.a..; .

w a st. w imas..:. )

Regulatory Compliatse Date l

,l l 6.% ALL PRE IMPLEMENTATION ITEMS (ITEMS 1-5) COMPLEIED 7 l VERIFIED BY: N M,b g I 1 t-

'l f l Regulatory Comphance Date O k M(ol7P *oold cdl d's@b (31 MAR 1998) D-22131 .

m memwm amRmmm E@U@H@@@@@ M G8:0I N 86/93/S0