ML20153H095
| ML20153H095 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/28/1998 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC |
| References | |
| TAC-MA1301, TAC-MA1302, NUDOCS 9809300307 | |
| Download: ML20153H095 (2) | |
Text
.
,ps % q g
4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2061 5 0001 O'%
,5 September 28,1998 MEMORANDUM FOR:
Docket File FROM:
Peter S. Tam, Senior Project Manage Project Directorate 11-2
,y Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 168 and 160 TO OPERATING LICENSES (TAC MA1301 AND MA1302)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implemer.tation of operating license Amendment Nos.168 (for Unit 1) and 160 (for Unit 2) on September 22,1998.
Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC H. Berkow l.
/
pf o' 9809300307 980928 PDR ADOCK 05000413 P
PDR P
f
09/23/98 GD 04:24 FAX.
- ~
Nuclear Policy Man:al - Volume 2 NSD Appendix D. 221. Implernentsfion Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSE / TECHNICAL SPECIHCATIONS AMENDMENT IMPLEMENTADON SHEET ICNS O MNS O ONS UNIT NO. Bi(2 0 3
'1,[4. (.. 5~ /
DATE RECEIVED _I!.%r[9/P TS NO.
AMENDMENT. NO. /b7 / L0 DESCRIPTION 1 cE co9061v.cfre Ie tJE1CHT" Rc0ue:7,o s)
- 1. IMPLEMENTATION DATES 81!
TEf A. NRC ISSUE DATE (Date of NRC Cover Letter):
B. NRC EFFECTIVE DATE (From Text of NRC letter): _.tT~b7 l
C. STATION IMPLEMENTATION DATE (No later than NRC Effective Date): T[1@[47
- 2. PLANT NOTIFICATION initials e
l g(/
r Via E-Mail Distribution; Include Site Technical Contacts
- 3. RGC 'ECHNICAL CONTENT REVIEW CRITERIA j
O A. All D,2screpancies Have Been Resolved Via NRC Interface.
4 9
B. No Inadvertent Changes were Made To TS Sheets Invofve'd.
7 C. TS Change Was Issued As Re d By DPC.
TECHNICAL REVIEWER:
[
..t.J ~ 17'
~
(List D2screpancies On Attached Page)
Date CHECKED BY:
b m
(List Discrepancies On Attached Page)
I Date *
- 4. PIP NUMBER (If generated):
D - C -#
"I O Y 7 Y5kh aYba
~
S f
c4 lW-p Regulatory Compliance Date 4f
}
l
- 6. [ALL PRE-IMP UON ITEMS (FEMS I-5) COMPLETED
/
l VERIFIED BY:
7
- 1lf, 0
l Re latory Compliance Date
~
2h W l
Manager, Regulatory Compliance j Date i
E N/ A M!A
~m l
Manager, safety Assurance Date l
- Approval may be waived (see'221.8 Item 61 i