Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423
ML20206H186
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/06/1999
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA4950, TAC-MA4951, NUDOCS 9905110084
Download: ML20206H186 (2)


Text

fV

?

e nezug>.,.

)

g%

UNITED STATES i

i NUCLEAR REGULATORY COMMISSION o

wAaHINGTON, D.C. 20066-0001 g

May 6,1999 a -

MEMORANDUM FOR:

Docket File ;

Peter S. Tam, Senior Project Manager, Sectio FROM:

Project Directorate 11 Division of Licensing Project Management gM M

Office of Nuclear Reactor Regulation CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

SUBJECT:

lMPLEMENTATION OF AMENDMENTS 177 and 169 TO OPERATING LICENSES (TAC MA4950 AND MA4951)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.177 (for Unit 1) and 169 (for Unit 2),

regarding the Control Room and Auxiliary Building ventilation actuation instrumentation on April 23,1999.

Docket Numbers 50-413 and 50-414 Distribution Docket file l/

PUBLIC R. Emch.

10026.

o\\

N 9905110084 990506' PDR ADOCK 05000413 P

PDR

E 05/05/09 WED 05:41 FAI

@ 002 v

~~

~

,s.

Nuclear Policy Manual - Volume 2 NSD Appendix D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET I

%CNS O MNS O ONS UNTT NO. R 1 R2 0 3 TS NO. T 3. '7 b,3,8 DATE RECEIVED

/N DESCRIPTION @LGTF~7S 3.17/118 FC4 AMENDhbNT NO. I cMR, oFws ALTvened wertumanwncn/

1. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover Ieter):

8 l

B. NRC IMPLEMENTATION DATE (From Te o NRCl'et er) J8/T/,

l C. STATION IMPLEMENTATION DATE 4h' 7YM ' t#M#'/

l (No later than NRC Implernentation Date):

' ' ~ ' ~

2. PLANT NOTIFICARON

/

Via E-Mail Distribution; Include Site Techmeal Contacts

3. RGC TECHNICAL CONTENT REVIEW CRITERIA O J All Discrepancies Have Been Resolved Via NRC Interface.

Er B. No Inadvettent Changes Were Made To TS Sheets Involved.

(C. TS Change Was Issued As sted By DPC.

TECHNICAL REVIEWER:

(List Discrepancies On Atta d Page)

Date h

4/df7 CHECKED BY:

(List DiscrepancihOn Attached Page)

Date

4. PIP NUMBER (If generated):

0 - c.cl8-46M 0 - C '18 ~ % 0 4

5. [ALL APPLICABLE CORRECTIVE ACTIONS FR LETED Y.17./

VERIFIED BY:

., /

y r Regulatory Compliance Date

6. [ALL PRE IMPLEMENTATION ITEMS (ITEMS 1-5) COMPLETED VERIFIED BY:

-s Regulatory Compliance Date

7. FINALIMPLEMENTATION APPROVAL klh WlA Manager tory Compliance Date Manager, Slfety Assurance Date