ML20248A273

From kanterella
Jump to navigation Jump to search

Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526
ML20248A273
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/26/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA1111, TAC-MA1112, NUDOCS 9805290332
Download: ML20248A273 (2)


Text

l

~~

, 3e* Ct!

f 41 UNITED STATES g j f

NUCLEAR REGULATORY COMMISSION e WASHINGTON, D.C. 2066tKlo01 49 po l May 26,1998

)

MEMORANDUM FOR: Dceket File FROM: Peter S. Tam, Senior Project Ma Project Directorate ll-2 4

  • Division of Reactor Projects - I Office of Nuclear Reactor Regula i n

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 165 and 157 TO OPERATING LICENSES (TAC MA1111 AND MA1112)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.165 (for Unit 1) and 157 (for Unit 2) on May 26,1998.

Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC ~

H. Berkow

\ \

g po r J s a 'e h 9805290332 980526

" ^=ckosoo=3 ffE BI WRE Mi$v
  • '~~'

,p.

Nuclear PoNey Manual - Volume 2 NSD Appendix D. 221. Isaricsoentation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSETIECHNICAL SPEC]MCATIONS AMENDMENT IMPLEMENTATION SHEET -

NNS O MNS O ONS UNIT NO. #$ [2 O 3 TS NO. 0.2. 3.2-- DATE RECEIVED 4/1?/9P (IAx)

AMENDMENT. NO. %5 / 8 D DESCRIPTION Cey esMw e4 44.~6 Da (ab y k s' ew Y q _ _

1. IMPLEMENTA* DON DATES A. NRC ISSUE DATE (Date of NRC Cover letter): '/[47[Ti B. NRC EFFECTIVE DATE (From Text of NRC letter): .S'/17/92 l

C. STATION IMPLEMENTATION DATE (No later than NRC FEactive Date):

2. PLAST' NOTIFICATION ..

inijialr date l

g/ 4/t3 . Via E-Mail Distribution; Include Site Technical Contacts

3. RGC IECHNICAL CONTENT REVIEW CRITERIA

[A. All Discrepancies Have Been Resolved Via NRC Interface.

  1. B. No Inadvertent Changes were Made To TS Sheets Involved.

VC. TS Change Was Issued As Re dB PC.

  • TECHNICAL REVIEWER: '

M o V[7-P[92 I*

(Ilst Discrepancies On A Page)

/

Da CHECKED BY: -

MN

, (List Discrepancies On ttachedPage) .

Date '

4. PIP NUMBER (If generated): C~*F - tCO 3 l S.

ALL APPLICABLE CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY: M 4 ( C /4 mM ele--  % b__. hea Regulatory Compliance Date 1 6. VALL PRF< IMPLEMENT ON S(ITEMS 1-5) COMPLETED l VERIFIED BY: 4 y l

'/[2S[9 P Regulatory Cornpliance Date (31 MAR 199g)

D-221-31 C00 @ 33NVI'IdK03 AHO.T.V'ISD3B T6TCTC9c09 IVd 0C:9T 33.T. 96/93/SO