Letter Sequence Approval |
---|
|
|
MONTHYEARML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 Project stage: Approval 1999-05-03
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] |
Text
. 'yY?f%
44 UNITED STATES g j 2
NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C. 2066Hm01
% ,, # May 3,1999 1
i MEMORANDUM FOR: Docket File 1
1 FROM: Peter S. Tam, Senior Project Manager, Sectio % l Project Directorate 11 / >
Division of Licensing Project Management Office of Nuclear Reactor Regulation M[N%
)
SUBJECT:
CATAWBA NUCLEAR STATION - FACSIMILE l TRANSMISSION, ISSUES TO BE ADDRESSED DURING THE I ONSITE REVIEW OF 10 CFR 50.59 CHANGES, MAY 10 AND !
11,1999 (TAC MA5226 AND MA5227)
The attached questions were transmitted by fax today to Mr. Gary Gilbert of Duke Energy Corporation (DEC) to prepare him and others for an upcoming onsite review of changes made per
)
10 CFR 50.59 during 1998 (reference letter, G. R. Peterson to NRC, April 1,1999). This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.
I Docket Numbers 50-413 and 50-414 qol Distribution PUBLIC Q h k[% @{ 9 R. Emch 9905050276 990503 3 l PDR ADOCK 0500 P
P50039 i
O u e
Comments and Questions Catawba 10 CFR 50.59 Changes Made in 1998 (Reference letter, G. R. Peterson to NRC,4/1/99)
For the May 10 and 11,1999, onsite review of the Catawba changes made under 10 CFR 50.59, please have the following ready:
- 1. The current procedure regarding 10 CFR 50.59 changes ll, The following 10 CFR 50.59 evaluations:
. Minor Modification CE-08710, Setpoint Change for Instruments NDPG5040 and NDPG5050
. Minor Modifications CE-09316 and CE-09317, Leave Fuel Pool Ventilation System Train Motor Operated Isolation Dampers in the Open Position at All Times
. Minor Modification CE-09584, Remove the Control Room Floor as a Committed Fire Boundary
. Minor Modification CE-09681, ice Condenser Intermediate Deck Door Enhancements
- Calculation CNC-1553.26-00-0193, Rev. O, increased Burnable Poison Rod Assembly B4C Concentration
. Procedure OP/1/A/6150/001, Revision 80, and OP/1/B/6100/010G, Relision 51, Changing the Reactor Vessel Leakage Detection System Alignment from the Inner O-Ring to the Outer O-Ring til. Answers for the following questions / comments:
- 1. Minor Modification CE-07779. This refers to Tech. Spec. LCO 3.4.9.b, which requires 2 x 150 kW = 300 kW. After abandoning the three heaters, heating capacity is now 347 kW. If another set of three heaters fails in the future,
" impractical" will no longer be the reason not to repair / replace them. Is impracticality due to high cost? High man-rem? Physically not possible to repair / replace?
2 CE-08578. What system / component are these valves part of?
3 CE-08772. You have shown that the fire barrier is not needed. But it is already in place. Does removing it create unnecessary work? 1 4 CE-08806. What system / component does this change pertain to?
5 CE-09316 and CE-09317. Would the ventilation system, with the !
modification, stillisolate should there be an accident condition in the area?
6 CE-09326, CE-09872. Please confirm if "WL" refers to the ligt'id radwaste system. A reader using the NRC Public Document Room would have trouble understanoing this term "WL." l I
- 7. CE-09998. Please confirm if *NV" refers to the chemical and volume control i system. Same comment as 6. Above. j
s ..
- 8. CE-10059. Amendment Nos.175 (Unit 1) and 167 (Unit 2), dated 1/15/99, approved the correction in diesel sump tank capacity. This is not a question, just an observation.
- 9. CE-10062. Please confirm if "NI" refers to safety injection. Same comment as 6. Above.
- 10. CE-61118. The licensee faxed both CE-61117 (Unit 1) and CE-61118 to the staff during review that led to Amendment Nos.177 (Unit 1) and 169 (Unit 2), I dated 4/8/99. Thus both these Minor Modifications have been reviewed then.
This is not a question, just an observation.
11 CE-61396. The evaluation says "....the bases for this specification will be revised to reflect that the CACST [ auxiliary feedwater condensate storage tank) will no longer be a normal CSS [ condensate storage system] s.ource."
Has TS Bases 3.7.6 been revised?
12 Calc. CNC-1553.26-00-0194, Rev.1. It appears that the main change is going from single-encapsulated to double- encapsulated? What is the auvantage?
13 PIP 0-C98-4098. What section of the UFSAR would be affected when the l long-term solution has been made? When would the long-term solution be made?
14 Temporary Modification Work Order 98066402-01. "UFSAR Section 10.4.9.2..... Due to the short duration of the Tempering Flow isolation, less than one fuel cycle, a UFSAR change to reflect this isolation is not required."
I checked Section 10.4.9.2 where the auxiliary feedwater nozzle tempering flow is described, and agree with this assessment. This is not a question, just an observation.
15 ' Miscellaneous items, Topical Report DPC-NE-2011PA. Reference recent letter, Berkow to Tuckman, 3/8/99). We need to discuss whether these changes could have been made under 10 CFR 50.59. NRC reviewers Lambros Lois et al. tock a quick look at the three changes, and argued that change (3) maybe a borderline case for 50.59.
16 CN-50463. An exemption was granted on April 9,1997, to permit Duke to use biometrics in the security system. Thus I seem to recall that biometric palm readers were installed in the 1997, not 1998, time frame. Please clarify.
17 Procedure OP/1/A/6150/001, Revision 80, and OP/1/B/6100/010G, Revision
- 51. Do the high revision numbers with these procedures indicate that the inner O-ring frequently leaked? What changes do you plan for UFSAR Section 5.2.5.2.17 18 Procedure OP/2/A/6200/006, Change 38E and 39A. What is the function of valve 2NI-185A7 i
?
5 19 Pages 212 thru 247. Numerous changes to the UFSAR are to be made.
Have these changes been made in the UFSAR update submitted on 4/8/99 submittal?