ML20239A080

From kanterella
Jump to navigation Jump to search

Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902
ML20239A080
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/03/1998
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA0357, TAC-MA0358, TAC-MA357, TAC-MA358, NUDOCS 9809080139
Download: ML20239A080 (2)


Text

_ _ _ _ _ - _ _ _ - _ _ _ _ - - _ - _ _ - _ _ _ _ _. - - _ _. _ _ _ - _ _ - - _ _ _ _ _ _ _ - _ - - - _ _ _ _

CN

'4 A.

"9 f

g UNITED STATES j

NUCLEAR REGULATORY COMMISSION q

t WASHINGTON, D.C. 2066& 4 001 1

49.....,o September 3,1998 MEMORANDUM FOR:

Dock'et Filet FROM:

Peter S. Tam, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/11 h

Office of Nuclear Reactor Regulation

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 169 and 161 TO OPERATING LICENSES (TAC MA0357 AND MA0358)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.169 (for Unit 1) and 161 (for Unit 2) on i

September 2,1998.

Docket Numbers 50-413 i

and 50-414 I

l Distribution Docket file PUBLIC H. Berkow

\\ l I

l 4 0 Y) '

{

[N$ b.J m.m;..

~ r 9eO9000is9 980903 DR ADOCK 050 43 1_

1

09/08/98 WED 04:84 FAX (2002 I

A o

APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET

[CNS O MNS O ONS UNIT NO.% Ik2 O 3 TS NO.5%' 3. 3- *-/

DATE RECEIVED d W} cI5'r AMENDMENT. NO.I W /i 4 i DESCRIPTION bk.'Tr.b kb.'4- % rt<w 4t At 5sA J d W r % - L_m.k u A b ota.- bt u,wO b Lht, wg Pc O 4t 9 W*y*

M m (4~..- w r.ts.- tw e.4 L :. g w y,g,

.44 %

<a we.t%

S b

A. NRC ISSUE DATE (Date of NRC Cover Ietter):

B. NRC EFFECTIVE DATE (From Text of NRC Ictter):

I W

l C. STATION IMPLEMENTATION DATE (Nu A L NRC ""-+ Dm):

3 f M l *7 7

2. PLANT NOTIFICA*ITON initials date l

W INNlWVia E Mail.D3tribution; Include Site Technical Contacts

3. RGC TECHNICAL CONTENT REVIEW CREERIA O

A. All Discrepancies Have Been Resolved Via NRC Interface.

X B. No Inadvertent r%nges Were Made To TS Sheets Involved.

K C. TS Change Was Issued As Requested By,DPC.

klD M

TECHNICAL REVIEWER:

ht40 e 1

(List Discnpancies On Page)

I e

CHECKED BY:

//'

F/M V

(Ilst Dacnpancies On Attached Page)

Date -

4. PIP NUMBER (If generated):

O - <3 fr - 3os +

l l

S. [ALL APPLICABLE CORREC1TVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY: M4M bAA@

9/.2.l98 b Regulaton Comp Date l

6. [ALL PRE-IMPLEMENTATION ITEMS (ITEMS I-5) COMPLETED l

l VERIFIED BY:

b@

9/M90 1

Regulatory Comp ce Date l

7. FINAL IMPLEMENTATION & PROVAL h b b d ha.

l S

l gtilatory Com liai

'l

' Date i

. vil Nivo '

o. GN &.ustm 4/2/99 l

Mf34:er. Safety Assurandt:

/

I Date l