ML20211K388

From kanterella
Jump to navigation Jump to search

Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824
ML20211K388
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/02/1999
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA4315, TAC-MA4316, NUDOCS 9909070209
Download: ML20211K388 (2)


Text

,

    1. % t l ' gf{s& y$1 UNITED STATES j

i

[o j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 4001

,o

'+9***** September 2,1999 MEMORANDUM FOR: Docket File .

FROM: Peter S. Tam, Senior Project Manager, Section 1 Project Directorate ll Division of Licensing Project Management

[

M /tA^\

Office of Nuclear Reactor Regulation l

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 179 and 171 TO l

OPERATING LICENSES (TAC MA4315 AND MA4316)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.179 (for Unit 1) and 171 (for Unit 2),

l regarding reactor trip system and engineered safety feature system setpoints on August 24,1999.

g' / j Docket Numbers 50-413 and 50-414 Distribution 60k

Docket file l PUBLIC R. Emch I

i gy063 9909070209 990902 PDR ADOCK 05000413 P PDR i

09/02/99 THU 07:20 FAI @ 003 i

/*

a Nuclear Policy Manual- Volume 2 NSD Appendix D. 221. Implementation !!heet

~

APPENDIX D. 221. FACILITY OPERATING l LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET NS O MNS O ONS UNIT NO. GVi (F2 0 3 ,

s3. 6,1.+. t > l TS NO. 6. 7,1,3.5. L ,ll{ DATE RECEIVED F ftkT7 AMENDMENT NO. DT[/ ? I DESCRIPTION Amedmut % Treat RTr/g7M p 16/t x,e bJdr a.r 'Un e,L I V4 Io e s-l

1. IMPLEMENTATION DATES )

A. NRC ISSUE DATE (Date of NRC Cover Letter): 1[/7[49 , .

I B. NRC IMPLEMENTATION DATE (From Text of NRC lytter)9'1

T/OlV9 l C. STATION IMPLEMENTATION DATE Ta r%<d- X/ Jl1 l

l (No later than NRC Implementation Date): ,

2. PLANT NOTIFICATION initiah dptej K /(//hUVia E-Mail Ihstribution; Include Site Technical Contacts
3. RGC TECHNICAL CONTENT REVIEW CRITERIA D A. All Discrepancies Have Been Resolved Via NRC Interface.

I B. No Inadvertent Changes Were Made To TS Sheets Involved.

I C. TS Change Was Issued As Re uested By DPC.

TECHNICAL REVIEWER:

y v

/ , LV. -

I (List Discrepancies O he ) D te ,

CHECKED BY:

A 9!?>/, 7 i y

(List Discrepandes On Attached Page) Date i

4. PIP NUMBER (If generated): r - 4 E D/l#6 4 key 5. VALL APPLICABLE CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED k 0 'u'* <eh., VERIFIED BY: N J W

- p htory Compliance Date wf &e~Y,W 6. VALL PRE IMP MENTATION ITEMS (ITEMS 1-5) COMPLETED VERIFIED BY: . ,h (I!1. 77

'v -

Regulatory Compliance Date  ;

7. FINALIMPLEMENTATION APPROVAL l
  • A MfA Manager, Reg 41atory Compliance Date N1 h-YA-  ;

Manager, Safety Assurance Date  !

  • Approval may be waived (see 221.8 Item 6).

i (30 SEPT 1998) D-:!21-33

- u