ML20202H904
| ML20202H904 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 02/03/1999 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-MA4243, TAC-MA4244, NUDOCS 9902090003 | |
| Download: ML20202H904 (2) | |
Text
..
.. ~._
~- -
Antero p.
b UNITED STATES i.
"g j
NUCLEAR REGULATORY COMMISSION l
4 WASHINGTON, D.C. 20066 4001 o%...../
February 3,1999 MEMORANDUM FOR:
Docket Filet 9 FROM:
Peter S. Tam, Senior Project Manager D
Project Directorate ll-2 L
~
~ Division of Reactor Projects -l/Il
~
Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 175 and 167 TO OPERATING LICENSES (TAC MA4243 AND MA4244)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.175 (for Unit 1) and 167 (for Unit 2),
regarding diesel engine lebe oil surveillance on January 16,1999.
Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC H. Berkow
\\
1.
L 9902090003 990203
~
eq {Of r PDR ADOCK 05000413 P
PDR j
G
03/03)99 ~ WED'iS:10 FAI ~
~
^ ~ ~ "
~
~~
~~
' ' 5 002 l
Nuclear Policy Manual - Volume 2 NSD Appendix D. 221. Implementation Sheet APPENDIX D. 221. FACILITY OPERATING-LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET tPCNS O MNS O ONS UNTTNO.Cf1CDdO3
/!/Th9 T S N o. li T f 1 3 DATE RECEIVED AMENDMENT. NO. l7f!ll7 DESCRIITION RGVtX DIGrn_ 4.::vsAAw#
/ tlGI" 0IL IW WingRJi (U M 1H G M O Vi' i=7t0 A (,60 CA O c uP M % D CA u n g
- 1. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover letter): l!ff{d l
B. NRC IMPLENENTATION DATE (From Text of NkC letter): NcMvvcnou werM Fff l.
C. STATION IMPLEhENTATION DATE IV cWntvem) m/m3 (TT l
(No later than NRC Implementation Date):
- 2. PLANT NOTIFICATION ll ta L-Mail Distribution; Include Site Technical Contacts
- 3. RGC TECHNICAL CONTENT REVIEW CRITERIA i
O A. All Discrepancies Have Been Resolved Via NRC Interface.
(B. No Inadvertent Changes Were Made To TS Sheets Invohed.
IC. TS Change Was Issued As R uested By DPC.
TEC11NICAL REVIEWER:
/ /1 g
(List Dircrepancies On Attached Page),
Date CIECKED BY: [hrmal AGE avaJc do 9'f/f_/f/hd i
l ' i (List Discrepancies On Attached Page)
Date
- 4. PIP NUMBgif generated):
0-om._ kO6
- 5. IVALINPLICABLE C CTIVE ACTIONS FROM ASSIGNED PIP COMPLETED
.,e /
./,f/.k, N VERIFIED BY:
Regulatory Compliance Date
- 6. ET'ALL PKLDIPLEME4
/W N6T6V d60l/F.
ATION ITEMS (ITEMS 1-5) COMPLETE
/,/ (
VERIFIED BY:
Regulatory Compliance Date
- 7. DNAL DIPLEMENTATION APPROVAL Y
- Manager, ory Compliance Date Manager,Mafety Assurance
' Date
- Approval may be waived (see 221.8 Item 6).
(30 SEPT 1998)-
D-221-33