Letter Sequence Other |
|---|
|
Results
Other: ML20129G726, ML20129H307, ML20133P401, ML20133P407, ML20134G481, ML20135C360, ML20135E489, ML20135F815, ML20138B666, ML20154A943, ML20197A560, ML20198K493, ML20198Q391, ML20205J098, ML20211G172, ML20216B635, ML20216G389, ML20217H998, ML20236N240, ML20236R038
|
MONTHYEARML20129G7261996-10-0101 October 1996 Advises That Info Submitted in Will Be Withheld from Public Disclosure Ref 10CFR2.790,per Request Project stage: Other ML20129H3071996-10-29029 October 1996 Advises That Info in Rev to Plant Epips, NRC Notification Requirements (9/18/96) & EOF Commodities & Facilities Procedure (9/10/96), Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 961007 Request Project stage: Other ML20133P4071997-01-21021 January 1997 Informs That on 970226 Team Consisting of Staff Members of NRC & FERC Will Inspect Dam at Standby Nuclear Svc Water Pond,Per Discussion W/M Kitlan & B Shoemaker.Purpose of Insp to Confirm Structure Conforms W/Design Documents Project stage: Other ML20133P4011997-01-21021 January 1997 Informs That Privacy Info Identified by Util Will Be Withheld from Public Disclosure,Per 10CFR2.790 & 103(b) Project stage: Other ML20134G4811997-02-0707 February 1997 Advises That Util 970115 Rev to Plant EPIP RP/0/B/5000/08, Spill Response (11/22/96), Will Be Withheld Per 10CFR2.790 Project stage: Other ML20135C3601997-02-27027 February 1997 Forwards Faxed Message to M Kitlan of Duke Power Co to Prepare Plant Personnel for Conference Call Project stage: Other ML20135E4891997-03-0505 March 1997 Informs That Licensee Request to Withhold Revised EPIPs Containing Privacy Info from Public Disclosure Per 10CFR2.790,granted Project stage: Other ML20135F8151997-03-13013 March 1997 Informs That Info Contained in Re Several Catawba Epips,Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) & Section 103(b) of AEC of 1954 Project stage: Other ML20138B6661997-04-25025 April 1997 Approves Request to Withhold Revised EPIP, Er Telephone Directory (970313), from Public Disclosure,Per 10CFR2.790 Project stage: Other ML20236N2401997-07-31031 July 1997 Discusses 970731 Conference Call for Licensee to Seek Staff Interpretation of Definition of Core Alteration, Section 1.8 of TS Project stage: Other ML15253A1011997-08-13013 August 1997 Notification of 970825 Meeting W/Util in York,Sc to Discuss Various Issues Re Future Regulatory & Operational Activities for Plants.Tentative Agenda Encl Project stage: Meeting ML20216B6351997-09-0202 September 1997 Advises That Info Contained in Re Rev to Epips, RP/0/A/5000/02,RP/0/A/5000/03,RP/0/A/5000/04 and RP/0/A/5000/05 Will Be Withheld from Public Disclosure,Per 10CFR2.790 (A)(6) and Section 103(b) of AEC of 1954 Project stage: Other ML20216G3891997-09-0404 September 1997 Forwards Lists of Catawba Licensing Actions & Activities Given to Copp of Duke Energy Corp Project stage: Other ML20211G1721997-09-24024 September 1997 Responds to 970902 Request Submitting Rev to Catawba Emergency Plan Implementing Procedures & Request for Withholding Info from Public Disclosure.Info Will Be Withheld Pursuant to 10CFR2.790(a)(6) & Section 103(b) Project stage: Other ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling Project stage: Other ML20198Q3911998-01-16016 January 1998 Informs That Info Submitted in Ltr, Re Rev to Several Plant Emergency Plan Implementing Procedures Will Be Withheld from Public Disclosure Project stage: Other ML20197A5601998-03-0404 March 1998 Discusses Privacy Info Contained in Revised EPIP, RP/0/B/5000/008,Encl 4.4,submitted by DEC on 980129.Reviewed Submittal Based on Requirements & Criteria of 10CFR2.790 & Determined Info to Be Privacy Info & to Be Withheld Project stage: Other ML20217H9981998-03-31031 March 1998 Informs That Info Submitted by Ltr, Will Be Withheld from Public Disclosure Per Licensee Request Project stage: Other ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice Project stage: Other ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change Project stage: Other ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls Project stage: Other 1997-08-13
[Table View] |
Text
e
,$'*%y S1 UNITED STATES
- p g
j NUCLEAR REGULATORY COMMISSION o
C WASHINGTON, D.C. 20556-0001 3y#
April 5,1999 o
MEMORANDUM FOR:
Docket File.
FROM:
Peter S. Tam, Senior Project Manager, Sect %1
)
Project Directorate 11
/ e m
Division of Licensing Project Management Office of Nuclear Reactor Regulation
)
SUBJECT:
CATAWBA NUCLEAR STATION, UNIT 1 - FACSIMILE TRANSMISSION, ISSUES TO BE DISCUSSED IN AN UPCOMING PHONE CONVERSATION ON STEAM GENERATOR INSPECTION (TAC M72400)
The attached qLestions were transmitted by fax today to Mr. Gary Gilbert of Duke Energy Corporation (DEC) to prepare him and others for an upcoming telephone call. This 1
memorandum and the attachment do not convey a formal request for information or represent un NRC staff position.
i
\\
Docket Numbers 50-413
\\,
Distribution PUBLIC R. Emch l
g\\'O\\h 9904090167 990405
~
PDR ADOCK 05000413 P
PDR hhk 4
A -
E Steam Generator Tube inspection Results Lite' sees' steam generator (SG) tube eddy current (EC) inspections play a vital role in the management of SG tube degradation. The results are used to demonstrate adequate structural and leakage integrity of the SG tubes.
NRC staff is interested in' discussing the licensee's steam generator inspection plans and results, although the licensee is not required to participate in this discussion. The following list of topics describes areas the NRC staff typically is interested in talking about.
Primary-to-secondary leakage prior to shutdown j
l Results of secondary side hydro For each steam generator, a general description of areas examined; include expansion criteria and type of probo used in each area For analyzed EC results, describe bcbbin indications (those not examined with RPC) and RPC/Plus Point /Cecco indications. Include the following information: location, number, degradation mode, disposition, and voltages / depths / lengths of most significant indications.
j l
Describe repair / plugging plans Discuss previous history; "look backs" performed Discuss new inspection findings Describe in-situ pressure test plans and results, if available: include tube selection criteria Describe tube pull plans and preliminary results, if available; include tube selection criteria Assessment of tube integrity for previous operating cycle Assessment of tube integrity for next operating cycle Provide schedule for steam generator-related activitYs during remainder of current outage Note:
Simple tables and figures may be used to facilitate the discussion.
h.